Loading...
HomeMy WebLinkAboutWPO201900027 Plan - VSMP 2023-03-14GENERAL NOTES OWNER: SM CHARLOTTESVILLE LLC 11710 PLAZA AMERICA DR. SUITE 1100 RESTON, ORGINIA 20190 VUE REALTY PARTNERS LLC 1821 AVON ST.. SUITE 200 CHARLOTTESVILLE, VA 22902 DEVELOPER: STANLEY MARTIN HOMES 404 PEOPLE PLACE, SUITE 303 CHARLOTTESVILLE, VA 22911 ENGINEER: COLLINS ENGINEERING 200 GARRETT ST, SUITE K CHARLOTTESVILLE, VA 22902 434)293-3719 TAX MAP NO.: 056A1-01-00-02600 (4.400 AC) 05600-00-00-11500 (21.854 AC) 055CO-03-00-000Al (1.340 AC) 05600-00-00-00700 (3.190 AC) TOTAL AREA: 30.784 ACRES (PORTION OF) ZONING: R- 6 RESIDENTIAL, STANDARD LEVEL - CLUSTER DEVELOPMENT WITH APPROVED SP2019-02 SPECIAL USE PERMIT CONDITIONS (LISTED BELOW) PROPOSED USE. PROPOSED PUBLIC ROAD TO SERVE AS THE ENTRANCE INTO THE PLEASANT GREEN NEIGHBORHOOD. PRESERVED/ MANAGED SLOPES: NO PRESERVED SLOPES OR MANAGED SLOPES ARE IMPACTED WITH THIS ROADWAY CONNECTION. PROPOSED AND MANAGED SLOPES ARE SHOWN ON THE EXISTING CONDITIONS PLAN SHEET. SUBDIVISION STREETS: CURB & GUTTER WATERSHED: LICKINGHOLE CREEK WATER SUPPLY WATERSHED AGRICULTURAL/ FORESTAL DISTRICT- NONE TOPO & SURVEY.' THE BOUNDARY LINE, PARCEL INFORMAT70N AND TOPOGRAPHY WERE PROVIDED BY ROUDABUSH, GALE AND ASSOCIATES IN JANUARY OF 2019. INFORMATION WAS FIELD VERIFIED BY COLLINS ENGINEERING IN SEPTEMBER OF 2020. DATUM: NAD 83 EXIS77NG VEGETATION: PARTIALLY WOODED WITH (2) RESIDENCES ON THE PROPERTY AND EXISTING GRAVEL DRIVEWAYS. BURIAL SITES A CEMETERY EXISTS ON THE RESIDUE PROPERTY (PARCEL TMP 56A-1-26). THE CEMETERY SHALL REMAIN AND WILL BE PRESERVED WITH THE DEVELOPMENT. STREAM BUFFERS: THE 100' STREAM BUFFERS SHOWN HEREON SHALL BE MANAGED IN ACCORDANCE WITH THE ALBEMARLE COUNTY WATER PR07ECT70N ORDINANCE FLOODPLAIN: A PORTION OF THE RESIDUE PROPERTY IS LOCATED WITHIN A FLOODPLAIN ZONE AS SHOWN ON FEMA MAP#51003CO229D, DATED FEBRUARY 4, 2005. RETAINING WALLS: NO RETAINING WALLS ARE PROPOSED WITH THIS PLAN. IMPERVIOUS AREAS: PROPOSED SIDEWALK WITH THIS PLAN: 10,600 sf PROPOSED ROADWAY WITH THIS PLAN: 14,250 sf OFFSITE EASEMEN T.• ALL PROPOSED GRADING SHALL BE CONSTRUCTED ON SITE OR WITHIN EXIS77NG RIGHT-OF-WAY. NO OFFSI7E EASEMENTS ARE PROPOSED WITH THIS DEVELOPMENT. TMP-56-115 IS NOT PART OF THE PLEASANT GREEN NEIGHBORHOOD, BUT ARE PROVIDING THE EASEMENT AND RIGHT-OF-WAY FOR THE PROPOSED PUBLIC ROAD. NO TES: 1) THIS PROPERTY DOES NOT LIE WITHIN AN AGRICULTURAL AND/OR FOREST DISTRICT. 2) ONLY (1) DWELLING PER LOT SHALL BE PERMITTED. 3) ALL PROPOSED EASEMENTS SHALL BE DEDICATED TO PUBLIC USE. 4) STREET TREES SHALL BE PROVIDED ALONG ALL THE PUBLIC STREETS 40' O.C. IN ACCORDANCE WITH VDOT AND ALBEMARLE COUNTY STANDARDS. 5) ITE TRIP GENERATION: TRAFFIC IMPACT NUMBERS ARE BASED ON THE ITE TRIP GENERATION MANUAL, 8TH EDITION. CODES 230 WERE USED FOR THE DEVELOPMENT. SEE SHEET 4 OF THE ROAD PLAN FOR TRAFFIC DISTRIBUTIONS. 6) THIS PROPERTY IS NOT LOCATED WITHIN A DAM INUNDATION ZONE. SP2019-02 Pleasant Green Special Use Permit Conditions 1. The culverts under the proposed Connector Road extension over Powell's Creek must be in general accord with the attached Concept Plan titled "Pleasant Green Subdivision Special Use Permit Plan" the "Plan') prepared by Collins Engineering with a revision date of March 2, 2020. To be in general accord with the plan, development must reflect the general size, arrangement, and location of the culverts, as well as maintaining no increase of the 100 year flood elevation outside of the Pleasant Green property. Modifications to the plan that do not conflict with the elements above may be approved subject to the review and approval of the County Engineer. 2. Prior to final road plan approval or permitting of a land disturbance in the floodplain, the applicant must obtain from the Federal Emergency Management Agency (FEMA) a conditional letter of snap revision (CLOMR, or CLOMA), and prior to road acceptance the applicant must obtain from FEMA a letter of map revision (LOMR or LOMA). In addition, the applicant must copy the County Engineer on all correspondence with FEMA. Construction and installation of the culverts must be in compliance with approved road plans and FEMA approved CLOMR or CLOMA. 3. Any residential lots and associated streets resulting from the subdivision of the property, with the exception of the stream crossing and roadway identified on the attached plan as Connector Road, must be located outside of the 100 foot stream buffer, Flood Hazard Overlay and preserved slopes on the property. Lots may be permitted to be located within the landward 10 feet of the 100 foot stream buffer only if the lots are adjacent to approved stormwater management facilities located within the landward 50 feet of the stream buffer. Approval of lots located within the stream buffer must be subject Subdivision Agent approval. 4. The not density of the property must not exceed 6 units per acre, in accordance with the Crozet Master Plan. Net density must be calculated by subtracting the area within the Flood Hazard Overlay District, the 100- foot stream buffer, and areas of preserved slopes from the total acreage of the property subject to the special use permit. S. Prior to issuance of a grading permit to allow installation of the stream crossing or with submittal of the final subdivision plat, whichever comes first, the applicant must submit an easement plat dedicating to the county the area identified for a greenway trail on the attached plan. 6. If the construction of the stream crossing for which this Special Use Permit is issued is not commenced by September 16, 2025, the permit will be deemed abandoned and the authority granted thereunder will thereupon terminate. 7. Prior to approval of the first final Virginia Stormwater Management Program (VSMP) plans or the first final subdivision plat, whichevercomes first, the applicant shall conduct aPhase I1 Environmental Site Assessment (LSA) in accordance withASTM standards. The Phasell ESA shall include sampling and testing of accumulated sediment behind the dam that exists on the Property. The applicant shall be required to comply with all recommendations of the Phase II ESA prior to issuance of the first building permit on the Property. The applicant shall also be required to remove accumulated sediment from behind the dam prior to demolition of the dam and dispose of the sediment, either on site or off site, in accordance with the Phase II ESA recommendations. N PLEASANT GREEN CONNECTOR ROAD VSMP PLAN WPO 201900027) WHITEHALL DISTRICT ALBEMARLE COUNTY, VIRGINIA SM CHARLOTTESVILLE, LLC TMP 056A1-01- 00-026A0 y N'w. H vooAo v O v 0.900 ac. _ eESDNe oy6a 5 G` \ 1 I DB 5127, PG 677 \, gaA 1, D G SIL A, EMILV X ' TMP056 14) 1- 00. DB 443 2 0 \ PIRKEV, YHSEPH LOTFTMP056A1-01- 00- 3400 \ PLEASANT GREEN PHASE III \, CRITZ MI NELL 0.57AOac. FUTURE DEVELOPMENT TMP 1o11oao3500 DB2143,PG20o NOT PART OF THIS PLAN,* DB 6162, PG z 1 v i SDP202i00096) J _ BM1EER, JAMES L OR DELORESJ PLEASANT GREEN PHASE II \ '''_ os051120aoo-o33Ao 1980, PG 534 \ c. FUTURE PMENT NOTS PART OFoTHIS PLAN, j202 ` HEA, DANIEL` OR5so46a1Gala Loo 3oD /ESL R J PLEASANT GREEN PHASE I TM DEVELOPMENT 4 ' T T SBAi 1 0-03200 SDP-2019-00009) 2413, Pc 4 0.52 ac. L - SM CHARLOTTESVILLE, LLC Y % \ DB 12 TMP 056A1 - 0 1 -00- 02600 ""'` / \ B E AMESL RDELORESJ 8833 ac T t156A1-0140- 032B0 \ i 0.080 ec1ae A DB 5104, PG 510ZELLEF 1222, PG a94 TMP 066A10.2 1-0 y / DB 2194, 658 RESIDUE LAND FROM / VUE REALTY PARTNERS LLC PLEASANT GREEN Q TMP 05600- 00-00-11500 PHASE I SUBDIVISION / 21.854 ac. TO BE COMBINED WITH ''\ DB 4856, PG 582 TMP 056A1-Q1-00 02600 / 7--_- VUE REALTY PARTNERS LLC TMP 05600-00-00-11500 Y MALONE,MICHAELA. 1 21.854 ac. 0 TMP055CO-00-OC-00400 \ D134856, PG 582 '0 DB WB 1, PG 313 CO CO M 59N L, BRENDA S TMP 55C0-00.0C-00300 '.'. Q 0.288 ac. F l CAMPBELL, GORDON R\ SM CHARLOTTESVILLE LLC MADELINEN 1 TMP055CO-03-00- 000Al TMP 055C0-OD-0C-00100 I 1.340 ac. ." CAM& MAD LINE N R 416, G I DB 5127, PG 677 MADELINE N OB 416, PG227F TMP 055CO-00-OC- 00200 \ 0.630 ac. DB 332, PG 323 v \ le SM CHAR TTESVILLE LLC 0 0 // TMP0000-00-00- 00700 LOUN$BURV, K¢VIN G N % I TMP 055C0-00.0A- 00200 nn O 0.560 ac. I LUDWIG, DALE&CHRISANNE 'r7 DB %9, PG 389 TMP 055C0-00-OA-00100 L JORDAN, ROSE M 'I / 0. 600 ac. -' t N TMP 055CO-00-OX004DO OB 5132, PG 760 0.520 ac. iTRICKLER, GLORIA OB 4037, PG 681 Q Y \ MP 055C0.00- OA-00500, ' 0.370 ac. / OB 1153, PG 735 \ o (\ THE HOUSING LAB LLC 1"143.190 ac. 5112, PG 348 O TMP 050.670 a00- OBBDO DB 5079, PG 303 / \ c. THE HOUSING LAB LLC \ TMP 05500.00-00-068CO 0.530 ac. DB 5079, PG 303 01 SHEET LAYOUT SCALE: 1" = 1001 ROSA TMP n VICINITY MAP SCALE: 1" = 2000' LAUREL HI L L S CROZET r2a CROSSING _ GRAYROCK WAYLANDS WAYLAND PARK I GRANT SITE `,III ''iI: ,> Crozetz4c REA PARKSIDE VILLAGE ords 9 Old Trail Golf Club 0 IM PARK VIEW BROOKWO Sheet List Table Sheet Number Sheet Title 1 COVER 2 EXISTING CONDITIONS & DEMOLITION PLAN 3 EROSION & SEDIMENT CONTROL NOTES & DETAILS 4 PHASE I EROSION & SEDIMENT CONTROL PLAN 5 PHASE II EROSION & SEDIMENT CONTROL PLAN 6 STORMINATER MANAGEMENT PLAN 7 MITIGATION PLAN 7 TOTAL NUMBER OF SHEETS LEGEND EDGE OF PAVEMENT CURB SOIL BOUNDARY EROSION CONTROL BUILDING SA SAFETY FENCE 3.01 PROPOSED ASPHALT CR CONSTRUC77ON ROAD J. STREAM BANKS STABILIZATION 100' WPO BUFFER CE COIVSTRUC77ON ENTRANCE 3.02 PROPOSED EASEMENT, VARIES WITH SHEET SF SILT FENCE J.05 DRAINAGE PIPE lP INLET PR07EC77ON 3.07 BENCH MARK DD TEMPORARY DIVERSION DIKE 3. 09 v VDOT STANDARD STOP SIGN PROPOSED HANDICAP TEMPORARY RIGHT OF — WAY J. 11 PARKING SPACE STRIPING DIVERSION ST TEMPORARY SEDIMENT TRAP J. INLET PROTECTION SB SEDIMENT BASIN 314 200 EXISTING CONTOUR OP OUTLET PROTECTION 3.18 zoo PROPOSED CONTOUR SEDIMENT TRAP OR BASIN RR RIPRAP 3.19 DRAINAGE DIVIDE RR UTILITY STREAM CROSSING 3. 25 LIMITS OF CLEARING/GRADING SA TEMPORARY SEEDING 3.31 LIMITS OF DISTURBANCE PF pr DIVERSION DIKE PS PERMANENT SEEDING 3.32 RIGHT—OF—WAY DIVERSION TP O TREE PRESERVA77ON 338 ANDPROTECT70N TREE PROTECTION DC DUST CONTROL 339 SAFETY FENCE X SILT FENCE k VIRGINIA EROSION & SEDIMENT CONTROL a PROPERTY LINE HANDBOOK SPECIFICA77ON NUMBER 4 PROPOSED CONCRETE 0000000 100 YR. FLOODPLAIN RIPRAP, OUTLET PROTECTION OR CONSTRUCTION ROAD STABILIZATION APPROVED by the Albemarle County Community De to ment Department Date 3 / 14 f2 3Gjlp "Y VIJVVVL/ APPROVALS DATE DEPARTMENT OF COMMUNITY DEVELOPMENT PLANNER/ ZONING ENGINEER INSPECTIONS ARB DEPARTMENT OF FIRE RESCUE ALBEMARLE COUNTY SERVICE AUTHORITY VIRGINIA DEPARMENT OF TRANSPORTATION HEALTH DEPARTMENT No. 35791 10/ 26/22 N N 0) Cf N WO J.-4tio Q Vl w w DO MWZZ0LUJ0 I— FmUriI- Ok Z Z Z U) i DO g> Z o O O 2 U/ z J w OQWO a F W w Z FwUJ a o W a w Ce 0 W 0 W W Mnww wLU W Wce n IF 4LUO O H N N Q N O\ n 7 N 0 O N CD ao y L U C a Cy) M ND CY) a 00 3 N z J o D o N O o Lip 8 CN C G N a o C1 s N LU. J 0 DJ Q o 0 D C W o L9N o 3 O r J O LL w Q U 0 N W z C) W i z m o O C U E c/) Ul WCD Z_ LUCD 11 1K W w z W ZUrzw sssssm (n z JzU V) LU Q O J Qw J D CD O CD U 04 0UFo w JOB NO. 182154 SCALE kS SHOV1 SHEET NO. 1 IN NE TO BE / / - - \\ TOP MH=72 53 PIRKEY, JOSEPH L OR T ESA F RPILSE GCONSTRU NON. CONT CORN / y - _ r / \ \ TMP 056A1- - 0- 340 O Dac. i w___UaLmc ---- -CRITZE MISTYDA ELL 143,PG200 / TMP 5 W-01-00-03 00 J i se- v / / r % F/ " F ti ' r y.yam \ n I \a DBWB05aaG12 iJ \ SO R. LINS`Z i A ` ' ' ' _ _ _ - A ER, JAMES L OR L No. 35791 a v I GREEN PHASE I CONSTRU ION/'' / v- I A v ELORES J EXISi3NG.GARAGE SHALL - _ < _ REMAIN DURING' EASANT ,' , j /'/ ?- v - / _ - — - _ - v 1 P 0 A1-01-00-033A0 \ '4' Fr _ _ 1 8 24/22 PHASE a -- /' ',. / ' — — 1 - \ - I 1 I OP OF 5.85 0 80, PG 534 ` yl I I11— `SI/NAL ECG V' ' ffiSANG"FENCE TO BE - ) ` - -- M I ` I / A i 1 0 r / - REM ovEDDURINGRLEA .-I - - - i CRIMP AND ROLL END OF COPPER PIPINGI --€XISTING SHED-SHALLREMAIN / / , ',- _ -_I GREEN PH- CON STRU r / I -- -- _ 1vDURINGPLEASANTGREEN - ' _ I I 1 I A, DANIELF OR NGE I \ PHASE I CONSTRUCTION p,HASE IIr 056A1-01-00- 3300 / EXISTING RETAIN NQG A.SHjCLL' // / _. a ` ` y Tr _ 1 1 N 0.464 ac. \ REMAIN DU RING_PLEAS$NTGREE /' / / - I j. _ - _ I; r J, '1 D6 2413, PG 214 42" MIN. REMAINING COPPER PIPE TO BE VERTICAL E 5 - I / A,\\ I ` / / BABER, JAMES L OR 2 IN. E O MENT _ DELORESJ P ASAN A I 4. M EXiSTING GEMETERY I \\ / / ' __ / ,' - DEV P s \\ / / r N c / SHUT-OFF CORPORATION STOP TO'REMATN \ ____' _ / \ ' ,.. / --___ (SDP-zos-0000g) 7v1 i TMP050.520ac. 3200 i r / r_ \\ --__ I , \ _ _ -XISTING TREE LIMTS (TYP.) / __-' __ - i - `\\, 0.520ac. O I-- -/ ` - '' / / / \ r' '- _ -- r" ' `\ \ `\ ` — — BB\ BER, JAMES L OR DB 1222, PG 397 / \ DELOREAJ r / 4 ' _\ -_ - \ \ \ \ T POS6A1-01-0 032B0 / M CD M HAKLCITTESVILLE _LLC , c l . \ v n f '-' ,TMP 056A1_01_00-02600 / . O + \ x 1222, PG 3 N I/ ---_- - _ . 8.833 ac. _ / / // \ \ 'f/ ' \ \ i / ZELLER ORY W Ln 'i O .N- ffj \ `1 ,",,,. \ \ / r TMP 056A1 I - -- B 5104,PG 510 \ \ f , ; w i 0.26 ac. LU LU w M r + \ ` ' y / \ \ DB 2194, 58 Z z ¢ ¢ 2 w r y ISTING PROPERTY LINE (TYP.) --- \ \ \ / i I ' \ \ O V w w O V) TYPICAL SERVICE TAP ABANDONMENT (n I m 0 0 m xBEREMOVED / w "' WITH PHASE I CONSTRUCTION OF THE z ¢ a a Lu O PROPOSED PLEASANT GREEN PROJECT IN f W WWw EXISTING 100' WPO BUFFER (TYP.)J y i LU IN NTS RESIDUE LAND FRO EXISTING VARIABLE WIDTH GREENWAY — \ \ ` ° m PLEASANT GREEN // / ' i VUE REALTY PARTNERS LLC T0-11 l EASEMENT (D.B. 5537, PG. 745) m( --- - k \ ®° ; \ PHASE I SUBDIVISION / % i TMP 05600-00-00-11500 TO BE COMBINED WITH /° // 3{: i 21.854ac. DB 4856, PG 582 ' I` \ ` \ _ - - _ _ - TMP 056A1 01 00 02 OQ s l _ __--_\ \ \ \ \ \ 1 ` O / i \ ' its ' -\ r \ m vv vv vv i II / % v „ , - `.v w ' n i n i n i nNi m ) A STORM SEWER PROPOSED WITH THE " N NVieREALTYPAf3TtERSLaIII „7`' \ \ m ° \--- v o mTMPQ600=00-00=41500 i i I I i / EXISTING FENCE TO BE REMOVED , ° ° ° `\-y\ _ ;PLEASANT GREEN PHASE I PROJECT \ 21 Z54 ac.` \ \ \ \ \ \ - , / \ WITH PHASE I CONSTRUCTION OF THE J ® EXISTING VARIABLE WIDTH GREENWAY f G DB 4886 PC158$ \ \ \ m5 PROPOSED PLEASANT GREEN PROJECT / / `\ ®9/m EASEMENT (D.B. 5537, PG. 745) i\lp A, AAA v \ \l \\ / V `\ II / V I q m / / _- v v I v A, v ITS (TYP.) vI I (- /^ ---- --- a GQIf - r. 100-YEAR FLOODPLAIN LIML9I ` v I b v v v vv vVvvv II \ - X—X— ----- — r'r / ----- - v `v Vv : `` \ / . ° m ISTING 100' WPO BUFFER (TYP.) _- Vv v vv A v A r / I v v A v I m -__--' / IN IN\ \ 0 1 \ -_ MPL 55C0-0INCHAE 400 \ IN `\\ ` \\\\\\\\ \\\l\ \ ` a ISTING 100' WPO BUFFER (TYP.) SANITARY SEWER PROPOSED WITH THE ' ° m — _ _ _ — _ ° - v v v\ v v v v v v I v A / PLEASANT GREEN PHASE I PROJECT J DBWB161 313 v ` v`w`vvv Vvv v v V a® v I'_ _ v A o i- 1 r \ m o I __ vv v`Vv v vvvvv v v v\\ °pv / V a ( vvv vA I \ p'° i \ `\ MCDANIEL, BRENDAS vv vvv v`v`\`:v` v v °' vv` vvvI ° °vm I ° m ° ° ° ----__---_ -- N TMP 055C0-00-OC-00300 \ 4 `\\\\` `\ \ \\` \ `\ \\ 1 I /'EXISTING STREAM (TYP.) \ \ `\ ° ° m ° ° ° ° ° - __ i ---___ _ \\ 0.288 ac. o / -__ _ / Q / D 900, PG 079 \ m m ! / Z h Iv ` \vvvv vvvv A Vm A 1 ` i9 A A vm® vv - LLi IN m m I I mAV m m m m m° o o `II vw i A /' -- i /' LL _ rt vrV"vvvv vvvv v / A v v v v\ \\O v vv , _ o \ vv o °IVo 0 0 0 0v\ v'C v` / ------- ___- v / V rl v AVA\AVAAAIN AAAV\ ® 1 . _ _ _ O O v' wv ` v v v v vvv m vEXISTING PRESERVED ,' i _ _ - v\ I A v '` v m _ / == - --- - ---_- _ / s _ s 1 / ] v v' a Im v vV ` STEEP SLOPES -'' +' °/ - A vV v v ? m \ „6R/LCii A_RLOT ESV L_LLLC. `. \ .\ \\ `\`&° \ --' i ao,-mom`. L _ JMP 0$CO-03=00r00 Y 1 `` `. '' '. ® \` -e s- 1 I 'mom o o ° o m - - --- _-- i ' ' LLI GriOLJJmm / /- 340 \ \\ y \ \ /\— \ \ \-- — _ _ \ ] / EXISTING 6,_4„W X 8,_4„ H 66 S ZT,'PCx67% \ \ - \ ---- .s } I \ d s sic \ •\ \ -,\ m m m m /' ` c_'' — — ° 9 / ' ma's-' \ - DOUBLE BOX CULVERT O O 0 CAMPBELL, GORDON R \ \ \ / /' >-- \ \ ` \ \ — — — J _----- I I / __ ,,,,,, x( r & MADELINE N \ ` - ! \ - ,' / \ \ \ \ \ \ \ I / % / , 2 / -- \ ` \ J TMP 055CO-00-OC-00200 \ I ' \\` \ `__ _ / _ _ _ \ \ \ \ \ \ \ / r I l l r l l / / .'' _ ' `\ s `` LLMP055C0-00-OC-00100 ) \ \ \__ _-___/ \ SEE UTILITY NOTE ON THIS SHEET _-- 0.630 aC. \`\ \\`\__ _--_"' '_/ _ / \ \\ i ser_-__-_/ i/// l l l ll__' //' /'r' \ S /-- _ ," _ U) 0.390 ac. . `\ \ \ _'' _ - \ \\ \ \\ \ 1 \\ .,CBS'/ /' / l l y /' ' ' / - _ \ ` ` \\ \ I !\ `\ I r DB 332, PG 323 DB 416, PG 227 \ \ " — — = — \ \ \ / \ \ - / ,/ / % / //% / / / /-- \ \ \ : '/ I \ I U Lu EXISTING30'RWSA \\\l 1, SANITARY SEWER \ \ \ A w I I O \ \ \ % / y / r / EASEMENT \ `\ \ \ \ \ \ \ / 0./ / i / / D.B. 3878, PG. 688., \\ i \ \\ \ \ `\ \\ `----- Z` 9O" v V 0 AQ _ !- EXISTI G FIRE 7 f C r ' \'/--- _-= h / i / i / / D.B. 828, PG. 131 \ t \ \ \ `---/ \'`` 9 z a , I HYDRANT TO REM IN \ ' \ ---/ / //-__ _ / / / ' , / 1 \ \ l \ \ \ N "YL /1 UNDISTURBED s \ /i' e /' / /' / ' \ \ \\ \ \ \ ]; \ > l \ l// S CHAK TTESVI E,LL6 ( ./ /.. ul w O TMP 00-00- 7Op a Q y_ , 96 \ Q, l91 \ PQ EXISTING CONDITIONS NOTES: LLJ Ur Lu DB 5112, PG 348 \ \ \ v .: 1. A PORTION OF THIS PROJECT IS LOCATED WITHIN z LOUNSBURY, KEVIN G OR ANN A TMP 055C0-00-OA-00200 / LUDWIG, DALE & CHRIS ANNE "` ` . t `> — - L'%— 5 5 / _ _ / / ; ; / 1 FLOODPLAIN LIMITS, BASED ON FEMA MAP NUMBER TMP 055CO-00-OA-00100 '-- - \ s — ' / ' ` \ O O0.560 ac. / / O ISTING TREE LIMTS (TYP.) i /:51003CO229D ADOPTED FEBRUARY 4, 2005. JORDAN, ROSE M DB 989, PG 389 / 0.600 ac. / _ _ _ `_ \\ / / ,' // ,' / /' / ' / ` ` I i / Q Oj Z v J fo O 2. THE BOUNDARY LINE, PARCEL INFORMATION AND TMP 055C0-00-OA-00400 I DB 5132, PG 760 = =_ i ( < , y- — — ISTING SANITARY SEWER ) / / O Q 0.520 ac. \ \ / ' - J , TOPOGRAPHY WERE PROVIDED BY ROUDABUSH, GALE AND LLI DB 4037, PG 681 / , - / \ \ ASSOCIATES IN JANUARY OF 2019. INFORMATION WAS FIELD LLI SqO //' / \ " \ VERIFIED BY COLLINS ENGINEERING IN SEPTEMBER OF 2020. Q STRICKLER, GLORIA C \ I / \ 2 EXISTING 60" CMP CULVERTS % ' i i / \ / '` P \ TMP 055C0-00 DA-00500 \ y O \ F / // \ 3. PRESERVED STEEP SLOPES ARE LOCATED ON THE PROPERTY J Q J 153, Pac. ! a; %/ / AS SHOWN ON THE PLANS. 100' WPO STREAM BUFFER IS UrDB1153, PG 735 / EXISTI G FIRE i r fj _ / I \ `` / / / ` ` ` THE HOUSING LAB LLC HYDRANT TOR MAIN i / I I / ' IN SHOWN. TMP 05500-00-00-068D0 UNDISTURBED ' F / / /, ''' ' ^, XISTING CONCRETE SIDEWALK 0.670 ac. O DB 5079, PG 303 6' 11 IN ( 1f0y/ sa`ry v ,' THE HOUSING LAB LLC TMP 05500-00-00-068C00.530 ac. G P I S C AL / DB 5079, PG 303 / ` I l \ r / / r 0 30 60 r 120 , 40 w 2V) r ( IN FEET) JOB N0. HALLO SY IA 1 inch = 80 ft. ROSA , / \ 182154 TM 500-00 0-068BO ` \ ' / r \ SCALE 0.4 ac. \ QF` UTILITY NOTE: 1 a o 60141, PG 364 - \ \ THE FIVE VACANT WATER METERS ALONG ORCHARD DRIVE SERVING TMP OSSCO-03-oo-000Ai, AS SHOWN ON THIS SHEET, SHALL BE ABANDONED IN ACCORDANCE SHEET NO. WITH MINIMUM ACSA STANDARDS, TYPICAL. SEE THIS SHEET FOR ACSA DETAIL TD-i3.. 2 EROSION & SEDIMENT CONTROL EROSION CONTROL NOTES DESCRIPTION OF EROSION & EROSION CONTROL NOTES & NARRATIVE MEASURES: 1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE SEDIMENT CONTROL MEASURES: PROJECT DESCRIPTION: PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE IN DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. THE PURPOSE OF THIS LAND DISTURBANCE AC77 ITY IS TO CONSTRUCT RAMBLING BROOK LANE, CONNEC77NG THE PLEASANT GREEN ACCORDANCE WITH THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. 2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND SUBDIVISION PROJECT TO EXISTING ORCHARD DRIVE. THIS PROJECT PROPOSES TO DISTURB AN ADDITIONAL 1.99 oc. OF LAND OUTSIDE STRUCTURAL PRACTICES USED IN THIS SEC77ON CONSIST OF THE FOLLOWING: MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL MEASURES: OF THE THE PREVIOUSLY APPROVED AND PERMITTED AREAS, AS SHOWN AND LABELED ON SHEETS 3 & 4. THE PROJECT WILL BEGIN EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULA7IONS VR ITS ESC MEASURES CONSTRUCTION APPROXIMATELY AROUND DECEMBER 15, 2022, OR IMMEDIATELY FOLLOWING PLAN APPROVAL. THE 301 SAFETY FENCE.. 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS. IT IS ANTICIPATED THAT THE CONTRACTOR WILL USE A CONSTRUCTION ENTRANCE, WORK IS ANTICIPATED TO BE COMPLETED WITHIN 15 MONTHS. A PR07EC77VE BARRIER INSTALLED TO PREVENT ACCESS TO AN EROSION CONTROL J. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR RIPRAP, OUTLET PROTECTION, DIVERSIONS, A UTILITY STREAM CROSSING, INLET EXISTING SITE COND/TIONS' MEASURE. TO PROHIBIT THE UNDESIRABLE USE OF AN EROSION CONTROL MEASURE BY AS THE FIRST STEP IN CLEARING. PROTECTIONS AND SILT FENCES TO CONTROL SURFACE DRAINAGE TEMPORARY SEEDING THE EX/STING S17E IS WOODED W/T14 LIGHT UNDERBRUSH. POWELLS CREEK EXISTS ON THE PROPERTY, FLOWING NORTH TO SOUTH ON THE PUBLIC. APPLICABLE TO ANY CONTROL MEASURE OR SERIES OF MEASURES WHICH 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE WILL BE USED IMMEDIATELY FOLLOWING ALL LAND DISTURBANCE ACTIVITIES. STOCKPILE THE SITE. CAN BE CONSIDERED UNSAFE BY VIRTUE OF P07EN7AL ACCESS BY THE PUBLIC. MAINTAINED ON THE SITE AT ALL TIMES. ADJACENT AREAS,• 5. PRIOR TO COMMENCING LAND DISTURBING ACTIW77ES IN AREAS OTHER THAN LOCATIONS SHALL BE ON SITE AND SHALL BE STABILIZED WITH A TEMPORARY THIS SITE /S BORDERED NORTHEAST BY THE PROPOSED PLEASANT GREEN SUBDIVISION, AND ON THE EAST BY EXIS77NG RESIDEN77AL 3.02 CONSTRUC77ON ENTRANCE., INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF-S17E BORROW OR VEGETATIVE COVER. TEMPORARY STOCKPILE AREAS THAT ARE USED FOR STORING SOIL LOTS SOUTH OF THE PROPOSED SITE IS JARMANS GAP ROAD, AND ORCHARD DRIVE EXISTS TO THE WEST. SILT FENCE WITH WIREASTABILIZEDGRAVELCONSTRUCTIONENTRANCELOCATEDATPOINTSOFVEHICULARWASTEAREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION UN77L A LATER TIME FOR SPREADING WILL REQUIRE MAINTENANCE & SHALL BE BACKING, A U77LITY STREAM CROSSING, RIPRAP, INLET CONTROLS AND VARIOUS OTHER ESC MEASURES ARE PROPOSED TO LIMIT THEINGRESSANDEGRESSONACONSTRUCTIONSITE. TO REDUCE THE AMOUNT OF MUD TRANSPORTED ONTO PAVED PUBLIC ROADS BY MOTOR VEHICLES OR RUNOFF. CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING SURROUNDED BY SILT FENCE AT ALL TIMES. PERMANENT SEEDING WILL BE PERFORMED POTENTIAL FOR CONTAMINATION OF THESE ADJACENT PROPER77ES AND WATERWAYS. CONSTRUCTION ENTRANCES SHALL BE INSTALLED AS SHOWN ON THE PLANS TO REDUCE 6. AUTHORITY. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADD1170NAL EROSION FOR ALL AREAS WHICH WILL NO LONGER BE EXCAVATED AND WHERE CONSTRUCTION OFFSITE LAND DISTURBANCE: AMOUNT SEDIMENT TRANSPORTED ONTO PUBLIC ROADWAYS OFFSIDE LAND DISTURBANCE IS LIMITED TO PUBLIC RIGHT-OF-WAY AND AREAS LOCATED WITHIN THE OVERALL PLEASANT GREEN CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS ACTIVITIES HAVE CEASED. PERMANENT SEEDING SHALL ALSO BE PERFORMED FOR ALL BOUNDARY. ROAD DETERMINED BY THE PLAN APPROVING AUTHORITY. DENUDED AREAS WHICH WILL BE LEFT DORMANT FOR A YEAR OR MORE. SELECTION OF SOILS,• THE TEMPORARY ST 7ON O ACCESSTHETEMPORARYSTABILIZATIONOF ACCESS ROADS, SUBDIVISION ROADS, PARKING 7. ALL DISTURBED AREAS ARE DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DIDISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT SEED MIXTURE WILL DEPEND ON THE TIME OF YEAR APPLIED. TEMPORARY SEEDING WILL SEE SOIL DESCRIPTIONS ON THIS PAGE AND THE PHASE l EROSION &SEDIMENT CONTROL PLAN FOR BOUNDARIES, SOIL TYPES AND AREAS, AND OTHER SIT£ VEHICLE TRANSPORTAT70APON ROUTES WITH STONE IMMEDIATELY AFTER GRADING. TO REDUCE EROSION OF TEMPORARY ROADBEDS BY CONSTRUCTION UN77L FINAL STABILIZA77ON IS ACHIEVED. BE PERFORMED FOR ALL DENUDED AREAS WHICH WILL BE LEFT DORMANT FOR MORE GENERAL SOIL DETAILS TRAFFIC DURING WET WEATHER AND TO REDUCE EROSION AND SUBSEQUENT REGARDING 8. DURING DEW47ERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED THAN SEVEN DAYS. THESE AREAS SHALL BE SEEDED WITH FAST GERMINATING CRITICALSAREA' OF PERMANENT ROADBEDS BETWEEN THE 77ME OF INITIAL GRADING AND FINAL FILTERING DEVICE POWELLS CREEK AND ITS IMMEDIATELY ADJACENT WETLANDS ARE LOCATED ON THE PROPERTY. THESE ARE CONSIDERED CRITICALLY STABILIZATION. USE WHEREVER STONE -BASE ROADS OR PARKING AREAS ARE 9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY VEGETATION IMMEDIATELY FOLLOWING GRADING OF THOSE AREAS. SELECTION OF SEED SENSITIVE AREAS. THE CONTRACTOR SHALL GIVE EXTRA ATTENTION AND CAUT70N IN AND AROUND THESE CRI77CAL AREAS TO ENSURE CONSTRUCTED, WHETHER PERMANENT OR TEMPORARY, FOR USE BY CONSTRUCTION AND AFTER EACH RUNOFF -PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR MIXTURE WILL DEPEND ON THE TIME OF YEAR APPLIED. SEDIMENT IS NOT DEPOSITED ON THEM. TREE PROTECTION FENCING, SILT FENCING, DIVERSIONS AND SEDIMENT TRAPPING DEVICES TRAFFIC. CLEANUP TO MAINTAIN THE EFFEC77VENESS OF THE EROSION CONTROL DEVICES SHALL SHALL ALSO BE INSTALLED AS A FIRST STEP IN LAND DISTURBANCE TO ENSURE THESE CRITICAL AREAS ARE MAINTAINED. 305 SILT FENCE 10. BE MADE IMMEDIATELY. ALL FILL MAT£R/AL TO BE TAKEN FROM AN APPROVED, DESIGNATED BORROW AREA. 301 SAFETY FENCE -SAFETY FENCE /S PROPOSED AROUND THE SED/MEND BAS/N AND SEQUENCE OF CONSST 770N: 1 CONTRACTOR SHALL N077FY THE ALBEMARLE COUNTY COMMUNITY DEVELOPMENT ENGINEERING DEPARTMENT TO SCHEDULE A A TEMPORARY SEDIMENT BARRIER CONSISTING OF A SMTHE77C FILTER FABRIC 11. ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA. EARTH FILL SEDIMENT TRAP. PRE -CONSTRUCTION MEETING. STRETCHED ACROSS AND ATTACHED TO SUPPORTING POSTS AND ENTRENCHED TO SHALL BE INERT MATERIALS ONLY FREE OF ROOTS STUMPS WOOD RUBBISH AND 302 CONSTRUC770N ENTRANCE - TO REDUCE THE AMOUNT OF MUD TRANSPORTED 2. PRIOR TO DISTURBANCES, THE LIMITS OF DISTURBANCE SHALL BE FLAGGED AND THE TREE PR07EC770N FENCING SHALL BE INTERCEPT AND DETAIN SMALL AMOUNTS OF SEDIMENT FROM DISTURBED AREAS DURING OTHER DEBRIS ONTO PAVED PUBLIC ROADS BY MOTOR VEHICLES OR RUNOFF. (2) CONSTRUCTION INSTALLED. CONSTRUCTION OPERATIONS IN ORDER TO PREVENT SEDIMENT FROM LEA THE SITE, 12. BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN 7 DAYS OF COMPLETION AND TO DECREASE THE VELOCITY OF SHEET FLOWS AND LOW -TO -MODERATE LEVEL PER ZONING ORDINANCE SECTION 5.1.28. ENTRANCES ARE PROPOSED. J. NO EROSION CONTROL MEASURES MAY BE REMOVED DURING THE CONSTRUCT70N PROCESS WITHOUT THE APPROVAL FROM THE CHANNEL FLOWS. THE SILT FENCE BARRIERS SHALL BE INSTALLED DOWN SLOPE OF 13. ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE WITH SECTION 13-301 J.03 CONSTRUC77ON ROAD STABILIZATION - TO REDUCE THE EROSION OF TEMPORARY INSPECTOR ON THE PROJECT. 4• INSTALLATION OF THE PROPOSED CONSTRUCTION ENTRANCES SHALL OCCUR NEXT. THE CONTRACTOR SHALL APPLYAREASWITHMINIMALGRADESTOFILTERSEDIMENTLADENRUNOFFFROMSHEETFLOWOFTHECODEOFALBEMARLE. AS INDICATED. THEY SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND 14. BORROW, FILL OR WASTE ACTIVITY INVOLVING INDUSTRIAL -TYPE POWER EQUIPMENT ROADBEDS BY CONSTRUCT70N TRAFFIC AND TO REDUCE THE EROSION AND SUBSEQUENT CONSTRUCTION ROAD STABILIZATION AS NEEDED TO THE CONSTRUCT70N ENTRANCES AND CONTRACTOR PARKING STAGING MAINTAINED IN ACCORDANCE NTH THE VIRGINIA EROSION & SEDIMENT CONTROL SHALL BE LIMITED TO THE HOURS OF 7:00 AM TO 9:00 PM. REGARDING OF PERMANENT ROADBEDS BETWEEN THE 77ME OF IN177AL GRADING AND AREA. CONSTRUCTION ENTRANCE TO BE INSTALLED WHERE CONSTRUCTION VEHICLE ROUTES INTERSECT PAVED PUBLIC ROADS, HANDBOOK (VESCH). 15. BORROW, FILL OR WASTE ACTIVITY SHALL BE CONDUCTED /N A SAFE MANNER THAT FINAL STABILIZATION. CONSTRUCTION ROAD STABILIZATION WILL BE APPLIED TO THE PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY (VEHICULAR) TRACKING ONTO THE PAVED SURFACE. MAINTAINS LATERAL SUPPORT, OR ORDER TO MINIMIZE ANY HAZARD TO PERSONS, WHERE SEDIMENT IS TRANSPORTED ONTO A PUBLIC ROAD SURFACE, THE ROAD SHALL BE CLEANED THOROUGHLY AT THE END OF 3.07 STORM DRAIN INLET PRO7EC7TON.' PHYSICAL DAMAGE TO ADJACENT LAND AND IMPROVEMENTS, AND DAMAGE TO ANY CONTRACTOR PARKING & STAGING AREAS AS NEEDED. EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTING TO A SEDIMENT A SEDIMENT FILTER OR AN EXCAVATED IMPOUNDING AREA AROUND A STORM DRAIN PUBLIC STREET BECAUSE OF SLIDES, SINKING, OR COLLAPSE. J.05 SILT FENCE- SILT FENCE IS PROPOSED, WHERE SHOWN ON THE PLANS. CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. DROP INLET OR CURB INLET. TO PREVENT SEDIMENT FROM ENTERING STORM DRAINAGE 16. THE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIN, REMOVE OR J.07 STORM DRAIN INLET PROTECTION- STORM DRAIN INLET PROTECTION IS SHOWN ON 5. THE INITIAL ESC CONSTRUCTION MEASURES, AS SHOWN ON THE PHASE I EROSION & SEDIMENT CONTROL PLAN, SHALL BE SYSTEMS PR/OR TO PERMANENT STABILIZA77ON OF THE DISTURBED AREA. INLET CONVERT TO PERMANENT STORMWA TER MANAGEMENT FACIL177ES WHERE APPLICABLE INSTALLED NEXT. THE CONTRACTOR SHALL BEGIN BY INSTALLING THE PER/METER SILT FENCE AND TREE PROTECTION. PER/METER PR07ECT70N APPLIES WHERE STORM DRAIN INLETS ARE TO BE MADE OPERA7IONAL ALL EROSION CONTROL MEASURES REQUIRED BY THIS PLAN REGARDLESS OF THE THE PLANS WHEN INLETS ARE CONSTRUCTED BUT THEIR SITE's CONTRIBUTING DRAINAGE MEASURES INTENDED TTRAP SEDIMENT SHALL BE CONSTRUCTED A FIRST STEP WITH ANY LAND DISTURBANCE ACTIVITY AND BEFORE PERMANENT STABIL/ZA T70N OF THE CORRESPONDING DISTURBED DRAINAGE SALE OF ANY LOT, UNIT, BUILDING OR OTHER PORTION OF THE PROPERTY. AREA IS STILL BEING STABILIZED. SHALL BE MADE FUNCTI7 TONAL BEFOREUPSLOPELANDDISTURBANCETAKESPLACE. AREA. 17. TEMPORARY STABILIZA7ION SHALL BE TEMPORARY SEEDING AND MULCHING. SEEDING J.08 CULVERT INLET PROTECTION - PROPOSED AT THE INLET OF THE TEMPORARY 6. ONCE THE PERIMETER EROSION CONTROL SILT FENCE AND TREE PR07EC770N HAVE BEEN INSTALLED, AND THE COUNTY 311 TEMPORARY RIGHT-OF-WAY DIVERSION: IS TO BE AT 75 LBS/ACRE, AND IN THE MONTHS OF SEPTEMBER TO FEBRUARY TO CONSTRUCTION ENTRANCE CULVERT INSPECTOR HAS APPROVED THESE MEASURES, LIGHT CLEARING AND LAND DISTURBANCE MAY BEGIN FOR THE REMAINING A RIDGE OF COMPACTED SOIL OR LOOSE ROCK OR GRAVEL CONSTRUCTED ACROSS CONSIST A 50/50 MIX OF ANNUAL RYGRASS AND CEREAL WINTER RYE, OR IN MARCH 3. 18 OUTLET PR07EC77ON-OUTLET PROTECTION IS PROPOSED AT THE OUTLET OF THE PERIMETER CONTROLS, INCLUSIVE OF SEDIMENT TRAP /1. THE CONTRACTOR SHALL FOLLOW THE TRAP INSTALLATION WITH THE DISTURBED RIGHTS -OF -WAY AND SIMILAR SLOPING AREAS. TO SHORTEN THE FLOW AND APRIL TO CONSIST OF ANNUAL RYE, OR MAY THROUGH AUGUST TO CONSIST OF STREAM DIVERSION IN ACCORDANCE WITH THE PLAN AND DETAILS SHOWN ON THE PHASE l ESC PLAN. AFTER DIVER77NG THE LENGTH WITHIN A SLOPING RIGHT-OF-WAY, THEREBY REDUCING THE EROSION POTENTIAL GERMAN MILLET. S7RAW MULCH IS TO BE APPLIED AT 80LBS/100SF. ALTERNA77VES CONSPAN STRUCTURE. SEE THE ESC PLAN FOR THE DESIGN LOCATION. STREAM AND OBTAINING THE ESC INSPECTORS PERMISSION, THE CONTRACTOR CAN INSTALL THE PROPOSED CONSPAN BY DIVERTING STORM RUNOFF TO A STABILIZED OUTLET. GENERALLY EARTHEN ARE SUBJECT TO APPROVAL BY THE EROSION CONTROL INSPECTOR. 319 RIPRAP- RIPRAP IS PROPOSED AT THE OUTLET OF THE CONSPAN STRUCTURE AND STRUCTURE AND ASSOCIATED WING WALLS AND RIPRAP. ONCE THE CONSPAN STRUCTURE IS INSTALLED AND THE ESC AND VDOT DIVERSIONS ARE APPLICABLE WHERE THERE WILL BE LITTLE OR NO CONSTRUCTION 18. PERMANENT STABILIZATION SHALL BE LIME AND FERTILIZER, PERMANENT SEEDING, AND TEMPORARY CONSTRUCTION ENTRANCE CULVERT. INSPECTORS HAVE GIVEN APPROVAL THE STREAM DIVERSION MAY BE REMOVED AND THE NORMAL FLOW CONDITION THROUGH THE TRAFFIC WITHIN THE RIGHT-OF-WAGRAVEL STRUCTURES ARE MORE APPLICABLE TO MULCH. AGRICULTURAL GRADE LIMESTONE SHALL BE APPLIED AT 90LBS/1000SF, PROPOSED CONSPAN STRUCTURE CAN BE ESTABLISHED. FOLLOWING THIS, THE CONTRACTOR SHALL INSTALL ANY REMAINING ROADS AND OTHER RIGHTS -OF -WAY WHICH ACCOMMODATE VEHICULAR TRAFFIC. INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL. FERTILIZER SHALL BE APPLIED AT 3.25 UTILITY STREAM CROSSING- A UTILITY STREAM CROSSING IS PROPOSED FOR THE EROSION CONTROL ITEMS AS SHOWN ON THE PHASE I EROSION CONTROL PLAN. TEMPORARY SEEDING, PERMANENT SEEDING AND 1000LBS/ACRE AND CONSIST OF A 10-20-10 NUTRIENT MIX. PERMANENT SEEDING CONSPAN STRUCTURE AT THE RAMBLING BROOK LANE CROSSING. DUST CONTROL SHALL BE IMPLEMENTED AS REQUIRED. J.12 DIVERSION: SHALL BE APPLIED AT 180LBS/ACRE AND CONSIST OF 957. KENTUCKY 31 OR TALL 332 PERMANENT SEEDING -PERMANENT SEEDING IS REQUIRED AND PROPOSED WITH THIS 7. ONCE ALL THE PHASE I EROSION CONTROL ITEMS HAVE BEEN INSTALLED & ARE OPERATIONAL, DRAINAGE IS PROPERLY WI A CHANNELCONSTRUCTEDACROSSASLOPETHA SUPPORTING EARTHEN RIDGE ON FESCUE AND 0-59 PERENNIAL RYGRASS OR KENTUCKY BLUEGRASS. STRAW MULCH IS PLAN. CONVEYED TO THESE MEASURES, AND THE ESC INSPECTOR HAS GRANTED APPROVAL, THE CONTRACTOR CAN BEGIN PHASE Il OF THE LOWER SIDE. TO REDUCE SLOPE LENGTH AND TO INTERCEPT AND DIVERT STORMWA TER RUNOFF TO STABILIZED OUTLETS AT NON -EROSIVE VELOCITIES. APPLIES TO BE APPLIED AT 80LBS/100SF. ALTERNA77 ES ARE SUBJECT TO APPROVAL BY THE 338 TREE PRESERVATION AND PROTECTION- TREE PROTECTION IS PROPOSED WITH THIS THE EROSION AND SEDIMENT CONTROL PLAN. 8. AFTER CLEARING THE PROPOSED AREAS, THE CONTRACTOR CAN BEGIN ROUGH GRADING THE SITE TO THE CONTOURS SHOWN ON WHERE RUNOFF FROM AREAS OF HIGHER ELEVATION MAY DAMAGE PROPERTY, CAUSE 19. EROSION CONTROL INSPECTOR. MAINTENANCE ALL MEASURES ARE TO BE INSPECTED WEEKLY AND AFTER EACH PLAN. SEE THE ESC PLAN FOR THE REQUIRED LOCATIONS. ALL BE THE PHASElIEROSION &SEDIMENT CONTROL PLAN. MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A EROSION, OR INTERFERE WITH THE ESTABLISHMENT OF VEGETA77ON ON LOWER AREAS WHERE SURFACE AND/OR SHALLOW SUBSURFACE FLOW IS DAMAGING SLOPING UPLAND, RAINFALL. ANY DAMAGE OR CLOGGING TO STRUCTURAL MEASURES IS TO BE REPAIRED 339 DUST CONTROL -DUST CONTROL IS REQUIRED AND PROPOSED WITH THIS PLAN. FIRST STEP WITH ANY LAND DISTURBANCE ACPLAN AND SHALL BE MADE FUNCTIONAL BEFORE LAND DISTURBANCE AND WHERE THE SLOPE LENGTH NEEDS TO BE REDUCED TO MINIMIZE SOIL LOSS. IMMEDIATELY. SILT TRAPS ARE TO BE CLEANED WHEN 50Z OF THE WET STORAGE TAKES PLACE. 9. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL VOLUME ISFILLEDNTHSEDIMENT. ALL SEEDED AREAS ARE TO BE RESEEDED WHEN 313 TEMPORARY SEDIMENT TRAP: E A GOOD STAND OF GRASS. SILT FENCE AND DIVERSION NECESSARY TOACHIEVEGRADEIS REACHED ON ANY PORT70N OF THE SITE TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO A TEMPORARY PONDING AREA FORMED BY CONSTRUCTING AN EARTHEN EMBANKMENT DYKES WHICH ARE COLLEC77NG SEDIMENT TO HALF THEIR HEIGHT MUST BE CLEANED DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT (UNDISTURBED) FOR LONGER THAN 30 DAYS. WITH A STONE OUTLET. TO DETAIN SEDIMENT -LADEN RUNOFF FROM SMALL DISTURBED AND REPAIRED IMMEDIATELY. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR. AREAS LONG ENOUGH TO ALLOW THE MAJORITY OF THE SEDIMENT TO SETTLE OUT. 20. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE REMOVED 10. ONCE THE SITE IS ROUGH GRADED, THE CONTRACTOR SHALL BEGIN INSTALLAT70N OF THE PROPOSED ROADWAY. INLET USE BELOW DISTURBED AREAS WHERE THE TOTAL CONTRIBUTING DRAINAGE AREA IS WITHIN 30 DAYS OF FINAL SITE STABILIZATION WHEN MEASURES ARE NO LONGER MAINTENANCE. PROTECT70N SHALL BE INSTALLED ON ALL INLETS IMMEDIATELY FOLLOWING THEIR CONSTRUCTION. THE INLET PR07EC77ONS SHALL LESS THAN 3 ACRES, WHERE THE SEDIMENT TRAP WILL BE USED NO LONGER THAN 18 NEEDED, SUBJECT TO APPROVAL BY THE EROSION CONTROL INSPECTOR. BE INSPECTED AFTER EACH RAINFALL EVENT AND REPAIRS SHALL BE MADE AS NEEDED. IF THE STONE FILTER BECOMES MONTHS, AND IT MAY BE CONSTRUCTED EI7HER INDEPENDENTLY OR IN CON UNCT70N 21. THE E&S INSPECTOR HAS THE AUTHORITY TO ADD OR DELETE E&S CONTROLS AS IN GENERAL, DURING CONSTRUC77ON THE RLD OR CONTRACTOR ON -SITE WILL CHECK ALL CLOGGED WITH SEDIMENT SO THAT IT NO LONGER ADEQUATELY PERFORMS ITS FUNCTION, THE STONE MUST BE PULLED AWAY WITH A TEMPORARY DIVERSION DIKE. NECESSARY IN THE FIELD AS S17E COND177ONS CHANGE. IN ADDITION, NO SEDIMENT EROSION AND SEDIMENT CONTROL MEASURES DAILY AND AFTER EACH SIGNIFICANT AND CLEANED AND/OR REPLACED. THE CONSTRUCTED STORM SEWER SHALL OUTFALL INTO SEDIMENT TRAP #1 UN77L THE S17E IS BASIN OR TRAP CAN BE REMOVED WITHOUT WRITTEN AUTHORIZATION. RAINFALL. MONITORING REPORTS WILL BE REQUIRED FROM THE RLD IF NEEDED. SPECIFIC COMPLETELY STABILIZED. THIS SHALL BE COMPLETED BY INSTALLING SIR. C14 (STORM SEWER MH) WIN SEGMENTAL RINGS. A TEMPORARY J.14 TEMPORARY SEDIMENT BASIN: ATTENTION WILL BE GIVEN TO THE FOLLOWING ITEMS RING SHALL BE INSTALLED DURING CONSTRUCTION TO OUTLET THE TEMPORARY ESC 15" CUP INTO ST /1 (SHOWN ON ESC PHASE 11). DURING A TEMPORARY BARRIER OR DAM WITH A CONTROLLED S7ORMWA7ER RELEASE STRUCTURE FORMED BY CONSMUC77NG AN EMBANKMENT OF COMPACTED SOIL ACROSS SOIL DESCRIPTION o. SEDIMENT BASINS AND/OR TRAPS WILL BE CLEANED AND MAINTAINED IN CONSTRUCTION THE LOWER, PERMANENT OUTFALL SHALL BE BLOCKED WA7ER77GHT TO ENSURE RUNOFF ENTERS ST /1 & IS NOT DISCHARGED A DRAINAGEWAY. TO DETAIL SEDIMENT -LADEN RUNOFF FROM DISTURBED AREAS ACCORDANCE WITH THE VIRGINIA EROSION &SEDIMENT CONTROL HANDBOOK. INTO THE STREAM. ONCE THE STORM SEWERS SUBAREA IS STABILIZED &THE ESC INSPECTOR GRANTS PERMISSION THE CONTRACTOR CAN IN `WET" AND `DRY" STORAGE LONG ENOUGH FOR THE MAJORITY OF THE SEDIMENT TO 7B- BRADDOCK LOAM-2 r0 77 SLOPES. SOIL IS WELL DRAINED WITH A MEDIUM RUNOFF b.ALL GRAVEL OUTLETS WILL BE CHECKED REGULARLY FOR SEDIMENT BUILDUP THAT REMOVE THE TEMP. 15" ESC PIPE & THE LOWER BLOCKAGE TO ALLOW SIR. C14 TO DISCHARGE INTO THE STREAM. SETTLE OUT APPLIES BELOW DISTURBED AREAS WHERE THE TOTAL CONTRIBUTING CLASSIFICATION. SURFACE LAYER IS TYPICALLY LOAM AND ABOUT 0-8" THICK. THE WILL PREVENT PROPER DRAINAGE. IF THE GRAVEL IS CLOGGED BY SEDIMENT THE 11. AFTER THE S17E /S FULLY STABILIZED, AND THE ESC INSPECTOR GRANTS APPROVAL, THE CONTRACTOR SHALL REMOVE DRAINAGE AREA IS EQUAL TO OR GREATER THAN THREE ACRES. THERE MUST BE Q DEPTHTHE WATER TABLE IS GENERALLY MORE THAN 80". GRAVEL WILL BE REMOVED AND CLEANED OR IT WILL BE REPLACED. TEMPORARY ESC SEDIMENT TRAP 1. SUFFICIENT SPACE AND APPROPRIATE TOPOGRAPHY FOR THE CONSTRUCTION OF A 17- IL CRAIGSVILLE LOAM-0 r0 2% SLOPES. SOIL IS WELL DRAINED WITH A VERY LOW c. ALL SILT FENCE BARRIERS WILL BE CHECKED REGULARLY FOR UNDERMINING OR 12. ONCE PHASE ll OF CONSTRUCTION IS COMPLETE THE SITE IS STABILIZED AND THE INSPECTOR HAS GIVEN APPROVAL, THE TEMPORARY IMPOUNDMENT. RUNOFF CLASSIFICATION. SURFACE LAYER IS TYPICALLY LOAM AND ABOUT 0-8" DETERIORATION OF THE FABRIC AND REPAIRED AS REQUIRED. SEDIMENT SHALL BE CONTRACTOR CAN REMOVE THE EROSION & SEDIMENT CONTROL MEASURES. NO 17EM SHALL BE REMOVED, THROUGHOUT ALL THICK. THE DEPTH TO THE WATER TABLE IS GENERALLY MORE THAN 80". REMOVED WHEN THE LEVEL OF SEDIMENT DEPOSIT70N REACHED HALF WAY TO THE PHASES OF CONSTRUCTION, UNLESS THE UPSTREAM AREAS ARE STABILIZED AND THE INSPECTOR GIVES PRIOR PERMISSION. J.18 OUTLET PROTECTION: 25B-DYKE SILT LOAM-2 TO 7% SLOPES. SOIL IS WELL DRAINED WITH A MEDIUM RUNOFF TOP OF THE BARRIER. 13. THE CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL MEASURES AS SPECIFIED IN THE VIRGINIA EROSION AND SEDIMENT STRUCTURALLY LINED APRONS OTHER ACCEPTABLE ENERGY DISSIPATING DEVICES d.ALL SEEDED AREAS WILL BE CHECKED REGULARLY TO SEE THAT A GOOD STAND IS CONTROL HANDBOOK, REMOVING ONLY WHEN APPROVED BY THE LOCAL PROGRAM ADMINISTRATOR IN ACCORDANCE WITH THE PLACED THE OUTLETS P ES OR PAVED CHANNEL SECTIONS PREVENT CLASSIFICATION. SURFACE LAYER IS TYPICALLY SILT LOAM AND ABOUT 0-8" THICK. MAINTAINED. AREAS SHOULD BE FERTILIZED AND RESEEDED AS NEEDED. VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. SCOUR ATT T STORMWA7ER OUTLETS, TO PROTECT THE OUTLET STRUCTURE, E, ANDTO THE DEPTH TO THE WATER TABLE IS GENERALLY MORE THAN 80". IN CASE OF EMERGENCY, THE PRIMARY CONTACT FOR THE PROJECT WILL BE THE RLD 14. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE MINIMIZE THE P07EN77AL FOR DOWNSTREAM EROSION BY REDUCING THE VELOCITY AND 37D3-HAYESVILLE LOAM-15 TO 257. SLOPES. SOIL IS WELL DRAINED WITH A HIGH OR CONTRACTOR ON -SITE. THE CONTRACTOR AT THIS 77ME IS DIGS. BROOK WOOD WITH STABILIZA7ION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS 07HERWSE AUTHORIZED BY THE LOCAL ENERGY CONCENTRATED FLOWS. APPLICABLE TO THE OUTLETS OF ALL RUNOFF CLASSIFICATION. SURFACE LAYER IS TYPICALLY LOAM AND ABOUT 0-7" PROGRAM ADMINIS7RATOR. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESUL77NG FROM THE DISPOS177ON OF CHANNEL SECTIONS PIPES ANDENGINEEREDCHANNELSECTIONS. D THICK. THE DEPTH TO THE WATER TABLE IS GENERALLY MORE THAN 80". DIGS MAY BE REACHED AT (434) IN ADDITION THE OWNER MAY TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. F THE R CONTACTED. UPONCOMPLETIONOFTHEPROJECT; THE OWNER WILL BE RESPONSIBLE O J.19 RIPRAP: REFERENCE: WEB SOIL SURVEY ONLINE DATABASE, FOUND AT FOR SITE MAINTENANCE. A PERMANENT, EROSION -RESISTANT GROUND COVER OF LARGE, LOOSE, ANGULAR http://websoilsurvey.nres.usdc.gov/OppIWebSoilSurvey.ospx STONE WITHFILTERFABRICORGRANULARUNDERLINING. TO PR07ECT THE SOIL FROM THE EROSIVE FORCES OF CONCENTRATED RUNOFF, SLOW THE VELOCITY OFTI CONCENTRATED RUNOFFWHILEENHANCINGTHEPOTENTIALFORINFILTRATION, AND TO EROSION CONTROL NOTES STABILIZE SLOPES NTH SEEPAGE PROBLEMS, AND/OR NON -COHESIVE SOILS USE WHEREVER SOIL AND WATER INTERFACE AND THE SOIL CONDITIONS, WATER TURBULENCE ES-1: UNLESS OTHERWISE INDICATED, ALL VEGETA7VE AND STRUCTURAL AND VELOCITY, EXPECTED VEGETATIVE COVER, ETC., ARE SUCH THAT THE SOIL MAY SILT FENCE CULVERT INLET EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CONSTRUCTED ERODE UNDER THE DESIGN FLOW CONDITIONS AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND PROTECTION SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL 325 UTILITY STREAM CROSSING: HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION A STRATEGY FOR CROSSING SMALL WATERWAYS WHEN IN -STREAM UTILITY AND SEDIMENT CONTROL REGULATIONS. CONSTRUC77ON IS INVOLVED. TO HELP PROTECT SEDIMENT FROM ENTERING THE ENDWALL ES-2: 7HE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK STREAM FROM CONSTRUCTION WITHIN APPROACH AREAS TO MINIMIZE THE AMOUNT OF PRIOR TO THE PRE-CONS77?UC77ON CONFERENCE, ONE WEEK PRIOR DIS77JRBANCE WITHIN THE STREAM ITSELF. GENERALLY APPLICABLE TO FLOWING TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE STREAMS K17H DRAINAGE AREAS LESS THAN ONE SQUARE MILE. WEEK PRIOR TO THE FINAL INSPEC7ION. ES-3- ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE 331 TEMPORARY SEEDING.' T---T"' PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING. THE ESTABLISHMENT OF A TEMPORARY VEGETATIVE COVER ON DISTURBED AREAS BY TOE OF FlLL i_ CULVERT ES-4.A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SEEDING WITH APPROPRIATE RAPIDLY GROWING ANNUAL PLANTS. TO REDUCE EROSION I SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. GENERAL SLOPE (3: OR LESS) PER ACRE AND SEDIMENTA7ON BY STABILIZING DISTURBED AREAS THAT WILL NOT BE BROUGHT TO I I ES-5.-PRIOR TO COMMENCING LAND DISTURBING ACT11477ES IN AREAS TOTAL LBS FINAL GRADE FOR A PERIOD OF MORE THAN 30 DAYS. TO REDUCE DAMAGE FROM I I OTHER THAN INDICATED ON THESE PLANS (INCLUDING BUT NOT KENTUCKY 31 FESCUE 128 LBS. SEDIMENT AND RUNOFF TO DOWNSTREAM OR OFF -SITE AREAS, AND TO PROVIDE LIMITED TO, OFF -SITE BORROW OR WASTE AREAS), THE CONTRACTOR RED TOP GRASS 2 LBS. PROTECTION TO BARE SOILS EXPOSED DURING CONSTRUCTION UN77L PERMANENT SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE SEASONAL NURSE CROP 20 LBS. VEGETA77ON OR OTHER EROSION CONTROL MEASURES CAN BE ESTABLISHED. I I OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING 1 1 AUTHORITY. SEASONAL NURSE CROP 150 LBS 332 PERMANENT STABILIZATION: ES-6: THE CONTRACTOR IS RESPONSIBLE FOR INSTALLA77ON OF ANY THE ESTABLISHMENT OF PERENNIAL VEGETATIVE COVER ON DIS77JRBED AREAS BY r________ ___--------- ADDIT70NAL EROSION CONTROL MEASURES NECESSARY TO PREVENT FEBRUARY 16 THROUGH APRIL ANNUAL RYE PLANTING SEED. TO REDUCE EROSION AND DECREASE SEDIMENT YIELD FROM EROSION AND SEDIMENTATON AS DETERMINED BY THE PLAN MAY 1 THROUGH Aucus is oxrAlL MILLET DISTURBED AREAS TO PERMANENTLY STABILIZE DISTURBED AREAS IN A MANNER THAT APPROVING AUTHORITY. AUGUST 16 THROUGH OCTOBER ANNUAL RYE IS ECONOMICAL, ADAPTABLE TO SITE CONDITIONS, AND ALLOWS SELEC770N OF THE TOE OF FILL ES-7.•ALL DIS77JRBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT NOVEMBER THROUGH FEBRUARY 15 WINTER RYE MOST APPROPRIATE PLANT MATERIALS. TO IMPROVE WILDLIFE HABITAT. TO ENHANCE CONTROL MEASURES AT ALL 77MES DURING LAND DISTURBING NOTES: NATURAL BEAUTY. UPON COMPLETION OF CONSTRUCTION ACTIVITIES, ALL AREAS WILL ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL RECEIVE A PERMANENT VEGETATIVE COVER. SILT FENCE DISTANCE IS s' MINIMUM IF ROW STABILIZATION IS ACHIEVED. 1. LIME AND FERTILIZER NEEDS SHALL BE DETERMINED BY SOIL IS TOWARD EMBANKMENT ES-8:DURING DEW47ERING OPERATIONS, WATER WILL BE PUMPED INTO AN TESTS AND APPLIED IN ACCORDANCE WITH VESCH STD. 3.32. 338 TREE PRESERVATION AND PR07ECT70N.' APPROVED WATER FILTERING DEVICE. PROTECTION OF DESIRABLE TREES FROM MECHANICAL OR OTHER INJURY DURING LAND rLow ES-9: THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES 2. SEEDINGS TO BE MULCHED IMMEDIATELY UPON COMPLETION DISTURBING AND CONSTRUCTION ACTIVITY. TO ENSURE THE SURVIVAL OF DESIRABLE PERIODICALLY AND AFTER EACH RUNOFF -PRODUCING RAINFALL of SEED APPLICATION, INACCORDANCE w/ VESCH STD 3.35. TREES WHERE THEY WILL BE EFFECTIVE FOR EROSION AND SEDIMENT CONTROL, EVENT ANY NECESSARY REPAIRS OR CLEANUP TO MAIN THE EVENT. WATERSHED PROTECTION, LANDSCAPE BEAU77F/CA TION, DUST AND POLLU7TON CONTROL, NOISE REDUCTION, SHADE AND 07HER ENVIRONMENTAL BENEFITS WHILE THE LAND /S OPTIONAL STONE COMBINATION EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL B BE MADEPS PERMANENT SEEDING SCHEDULE IMMEDIATELY. BEING CONVERTED FROM FOREST TO URBAN -TYPE USES. APPLIES IN TREE -INHABITED NO SCALE AREAS SUBJECT TO LAND DISTURBING ACTIVITIES. STD. & SPEC. 3.32 OF VIRGINIA EROSION & 339 DUST CONTROL: o' s• SEDIMENT CONTROL HANDBOOK, 3RD ED.) REDUCING SURFACE AND AIR MOVEMENT OF DUST DURING LAND DISTURBING, A A DEMOL17ION AND CONSTRUCTION ACTIVITIES. TO PREVENT SURFACE AND AIR MOVEMENT OF DUST FROM EXPOSED SOIL SURFACES AND REDUCE THE PRESENCE OF AIRBORNE SUBSTANCES WHICH MAY PRESENT HEALTH HAZARDS, TRAFFIC SAFETY PROBLEMS OR Source: Va. DSWC HARM ANIMAL OR PLANT LIFE DUST CONTROL MEASURES SHALL BE EMPLOYED TO FLOW v PREVENT SURFACE AND AIR MOVEMENT OF DUST DURING CONSTRUCTION. MEASURES -jM 25 LIEN EMPLOYED SHALLBEINACCORDANCEK17HTHEVESCH. CLSS I RIPRAP VDOT /3, # 357 OR #5 COARSE AGGREGATE TO REPLACE SILT FENCE IN " HORSESHOE " WHEN HIGH VELOCITY OF FLOW IS EXPECTED CURR INLET CONCRETE BLOCK WIRESCREEN OR j5 GRAVEL• FILTER COARSE AGGREGATE BLOCK & GRAVEL CURB INLET IP SEDIMENT FILTER 3.07- 8 NO SCALE 1. SET POSTS AND EXCAVATE A 4 X4 TRENCH UPSLOPE ALONG THE LINE OF POSTS. FLOW 2. STAPLE WIRE FENCING TO THE POSTS. STONE 70' MIN. CONSTRUCTION ACCESS 3" SM-2A ASPHALT TOP COURSE EXISTING 2%2Y. PAVEMENT 6" MIN. 21A AGGREGATE BASE PROFILE STONE 70' MIN. CONSTRUCTION ASPHALT PAVED ACCESS A WASHRACK EXISTING ` I 2% 1 2% PAVEMENT) Is I2% 12' MIN.• MUST EXTEND FULL WIDTH ID `POSITIVE DRAINAGE OF INGRESS AND EGRESS I TO SEDIMENT OPERATION 1 TRAPPING DEVICE PLAN 12' MIN. POSITIVE DRAINAGE 29 TO SEDIMENT TRAPPIN DEVICE G DEFILTERCLOTH SECTION A - A A miniutmn water tap of 1 inch must be installed with a ntatnmun 1 inch ballcock shutoff vah! e stlpplyillg a wash hose with a diameter of 1.5 niches for adequate constant pressor e. Wash water must be carried away from the entrance to an approved settling area to remove sediment. All sediment shall be prevented h on1 enteli a stone (rails, ditches or watercourses. PAVED WASH RACK NO SCALE TABLE 3. 39-A ADHESIVES USED FOR DUST CONTROL Water Application Dilution Type of Rate Adhesive Adhesive: Water) Nozzle Gallons/Acre Anionic Asphalt Emulsion 7:1 Coarse Spray 1,200 Latex Emulsion 12.5:1 Fine Spray 235 Resin in Water 4:1 Fine Spray 300 Acrylic Emulsion Non -Traffic) 7:1 Coarse Spray 4 O Acrylic Emulsion Traffic) 35: 1 Coarse Spray 3 O Source: Va. DSWC J. ATTACH THE FILTER FABRIC TO THE WIRE FENCE AND EXTEND IT INTO THE TRENCH. SUPER SILT FENC5 WITH WIRE -BACK NO SCALE 4. BACKFILL AND COMPACT THE EXCAVATED SOIL. 11 r EXTENSION OF FABRIC AND WIRE INTO THE TRENCH. O5- SCOTT/ R. CiTL] No. 35791 10/26/ 22 rn CD 0I 1 N W O J O p p OO M Q V/ wwpZQ Q w 2 pm Z OJpp w H HIn In O p C F- F- Of mLU H V) f 2: z 0 w p InO O ac Z J W z O Q CL CL 10 O w U x w Z w H L V w w W p F N m m m w m W w N O W ti N N N N kD N p O N CD L9 ti M CM N NT LL 47 W N CD ICY) N W N LLI J J CO LU L9 J W U w I n D C. ZLLU U CO z CO Q JJ W wQxx W WQ O O z J LL IM O z LU 0 z i- O W z 2 LU 0 LU Wr^ L L VJ V0,5 z v/ O LU W J W 0- JOB NO. 182154 NONE 3 SOIL TYPE- 1000 SOIL TYPE // PROPOSED STOCKPILE / — i ' i' i\ I \ \ PROPOSED 18" DIVERSIONSURROUNDEDBYSILTFENCE / \ ` D PROPOSED WITH PLEASANT ' — — — — — — \ / Y\ \ \/ / PROPOSED WITH PLEASANT GREEN PHASE I CONSTRUCTIONGREENPHASEICOSNSTRUCTION' / / DC 00 PS EXISTING FENCE I > \ \\ \\ TTOBEREMOVED \ \ WITH PLEASANT\ \ \ GREEN PHASE I 2 3.25 1992 3.25 STREAM FLOW DIVERSION EMBA4RTHTOBEEXISTINGUNDISTURBED OR NON -ERODIBLE, WATERT TH OFDIVERSIONCHANNELCROSSINGDIVERSIONCHANNELCROSSING MATERIAL ACCEPTABLE LININGS CONSPAN SF O FORMER LOCATION CROSS SECTION A —A OF PLATE 3.25-1) STRUCTURE OF FLOW BARRIER SCOTT R. 1 SILT FENCE 1 I U No. 35791 SEE PUTS. 3.25-2 FOR CROSS-SECTION SILT FENCE PCST rosy SILT PENCE TYPE A DIVERSION EX. GROUND DIVERTED STREAM 0,. 0 10/26/22 A -A WITH TYPE CHLNNNG (SEE DETAIL (LOOKING SOUTH) r'SIONAEL L ( POLYETHYLENER NIL. MIN.) 3.25-2 THIS SHEET) N.T.S. VEHICULAR STREW GRASS LINER STREAM DIVERSION DETAILS DURING CONSPAN INSTALLATION CROSSING. SM. 0 SPEC. 7.24 I TO BE LOCATED AT// ORIGINAL STREAMBED PLACERIPRAPAT ExISnNG GROUND ?T '\' ExISIING GROUND FOR INITHL CROSSINGS) 71WLSIRON CONSPAN STRUCTURE INSTALLATION NOTES: CONSTRUCTION f 1. CONTRACTOR SHALL INSTALL AND MAINTAIN A STREAM FLOW DIVERSION PER DIVERSION CHANNEL CROSSING VESCH DETAIL 1 I / 3.25-1 AND 3.25-2 DURING ENTIRE CONSPAN STRUCTURE i CONSTRUCTION OPERATION. 2. SILT FENCE SHALL BE INSTALLED ON BOTH SIDES OF THE I PROPOSED STREAM DIVERSION CHANNEL. THE CONTRACTOR SHALLIFLOWBMPoER TYPE B DIVERSION INSTALL AND ADJUST SILT FENCE AS NECESSARY TO PREVENT A SOIL FROM ENTERING THE STREAM. STREAM DIVERSION TO BE A N TRAPEZOIDAL DITCH WITH 2:1 SIDE SLOPES, A 5.5' DEPTH AND A ^/ 31F3AF Fllffk COiM n 1` \ 6' WIDE CHANNEL BOTTOM. RIPRAP SHALL BE PROVIDED WITHIN ORIGINAL THE EXISTING STREAM BED AT THE TRANSITION FROM THE N w o STREW a EXISTING STREAMBED TO THE PROPOSED DIVERSION CHANNEL, v—T F r1 r1 3' WIDE VDOT CL. Al, EC-1 STONE OUTLET - - BED EXISTING GROUND " ' EziSiING GROUND AND AT THE TRANSITION BACK FROM THE DIVERSION CHANNEL TO — J 174 p X PROTECTION PROPOSED WITH PLEASANT / fj: / THE EXISTING STREAMBED. AN APPROVED FLOW BARRIER I^ --1 p N w GREEN PHASE I CONSTRUCTION I _ _ ' (SANDBAGS, PLYWOOD, JERSEY BARRIER, OR EQUIVALENT) SHALL w w Do m SAFETY FENCE & SIGNS - / BE INSTALLED BEHIND THE RIPRAP TRANSITION. THE DIVERSION z H- LU w p SAF "WARNING QUICK SAND, KEEP / ' SHALL BE A TYPE C DIVERSION (i.e. IT SHALL HAVE A ROCK OR Z O _1 0 0 H F zOUT" PROPOSED WITH PLEASANT SANDBAG LINER H- Q IL QSOILTYPE - )• o_ m m w 17 I GREEN PHASE (CONSTRUCTION / - - / 3. THE DIVERSION CHANNEL CROSSING MUST BE OPERATIONAL O z z BEFORE WORK IS PERFORMED IN THE STREAM (CONSTRUCTION OF U w w FTYPECDIVERSIONaODIVERSIONSHALLBEPERFORMED "IN THE DRY"). N w m > zSOILBOUNDARYLINE (TYP.) / / / 4. UPON COMPLETION OF THE CONSPAN STRUCTURE CONSTRUCTION, LU u=i O w U PROPOSED BAFFLES A RIPRAP FILTER CLOTH O O 2 AND WITH ESC AND VDOT INSPECTORS' APPROVALS, THE z V V w LU Rocx OR SANDBAG UNER CONTRACTOR SHALL REMOVE THE STREAM DIVERSION AND ALLOW N O o_ o_ O FSTREAMFLOWTORESUMETHROUGHTHEEXISTINGCHANNEL & w V CONSPAN STRUCTURE. > LU w > > H w F- EXISTING CROVND 'V• E%SONG CRWND 5. ONCE THE STREAM RETURNS TO ITS NATURAL ALIGNMENT AND w a, o_ ko PASSES THROUGH THE CONSPAN STRUCTURE, THE CONTRACTOR a p F PROPOSED 19" DIVERSION ` / / / / SEDIMENT BASIN \ \ - FLOW BARRIER SHALL REMOVE THE TYPE C DIVERSION (RIPRAP OR SANDBAGS), p p p L w DD PROPOSED WITH PLEASANT I / i / PROPOSED WITH \ (RIPRAP. SANO&LCS, ANY SEDIMENT LADEN MATERIAL LOCATED WITHIN THE TEMPORARY w w w > 2PLYWOOD. JERSEY APPROACHING Ln Ln Ln w LnGREENPHASEICONSTRUCTION /`" / Wp0 201900603 LIMITS WPO 201900003 BARRIERS OR SHEET TRENCHING DIVERSION AND THE TEMPORARY DIVERSION'S EMBANKMENT neFETING) OPERATION (INCLUSIVE OF A NON -ERODIBLE, WATERTIGHT MATERIAL IF w w w p OF DISTURBANCE \ FORMER LOCATION PUCE RIPRAP • 6' MINIMUM OR WIDTH Of EXISTING STREAM WHICHEVER IS LESS APPLICABLE). THE CONTRACTOR SHALL REPLACE THE TEMPORARY U of now BARRIER a TRANSITION DIVERSION WITH COMPACTED STRUCTURAL FILL PRIOR TO > SILT FNCE W/ WIRE J •• ENTRENCH SILT FENCE AND FILTER CLOTH IN SAYE TRENCH w TP TREE PROTECTION I / / \?` PERSPECTIVE VIEW INSTALLING THE ROAD's EMBANKMENT. k I / BACKIN. PROPOSED SILT FENCE w/ WIRE ' \ / PROPOSED WITH / / / X-/ S WITH PLEASANT GREEN \ BACKING PROPOSED PLEASANT GREEN PHASE( PHASEIC0 STRUCTION / i \ \ WITH PLEASANT GREEN \ / CONSTRUCTION / / / \ Sourcc: Va. DSWC Plate 3.25-1 Source' Adapted from VDOT Standard Sheets Plate 3.25-2 PHASE I CONSTRUCTION S'j OILTYPE / / / / . W / V v / EXISTING FENCE / / 39 I ( TO BE REMOVED w/ WIR -k / CONTRACTOR SHALL INSTALL THE CONSPAN STRUCTURE / / BACKI PROPOSED WITH THE CONNECTOR ROAD PLAN AFTER THE OI — DIVERSION CHANNEL HAS BEEN INSTALLED AND IS a / g 100' WPO A I X ^ OPERATIONAL. AFTER THE PROPOSED CONSPAN, WING / BUFFER, TYP. I I-k I f /\ i WALLS, AND RIPRAP HAVE BEEN INSTALLED AND THE ESC / O ° I / — I(\ INSPECTOR HAS GIVEN APPROVAL, THE DIVERSION CHANNEL / O LIMITS OF TREE / I ` / I — — -- — — O CLEARING ASSOCIATED ! I -1 / CAN BE REMOVED AND NORMAL FLOW CONDITIONS CAN / / o O I / / — / / — — — 1 / / / w 0) CD CD \ \ \ RESUME THROUGH THE PROPOSED CONSPAN STRUCTURE. \ f O O O O WITH WPO 201900003 ( I` f ,I LARGE-SCALE PHASE II GRADING OPERATIONS FOR THE \ / / / — — —' / a CD N N p \ I -l O CONNECTOR ROAD SHALL NOT BEGIN UNTIL THE PERIMETER / / — J — — / — — / / / p v o1 Do CD O O 0\ O I \ O I PROPOSED WING WALL I ESC MEASURES AND THE CONSPAN HAVE BEEN INSTALLED. 00 0 100-YR FLOODPLAIN, TYP. ° - 0 0 0 / r ` w/WIRE ° 0 / — off— / '--— 3I0 O ° / / / I ACKING % — CO O ) O / \ W/ WIRE -/ PROPOSED IN-STREA RIPRAP Y O O O — ` BACKING / / PROPOSED y'! I '- RR AT TRANSITIONS (BEGINNING 4 O p O \ O / i — / 'C / CONSPAN 1 IJ /& ENDING) CROSOF NGUILITYTEAM \ O I O p O\ O O / / / / i WO STRUCTURE LIMIfSOFTREE / f y,r !c -- 684.0' \ / // /S----- `\ CLEARING ( TAP.) / Cy — - -- - C'7 PROPOSED WING WALL l y` 1 c \ \ / / / /O ° / / / — — — — — \ \ _ ' M PROPOSED VDOT STD. EC-1, CLASS I \ ITS OF / / /O / / / \ \ \ ' I — O7 11 I \ \ STR AM, TYP. SOIL TYPE (V 7 SOIL1TYPE \ RIPRAP WITH A TYPE B INSTALLATION TO RR / \ \ \ \ \ - i7 I — — 7BEINSTALLEDBETWEENTHEPROPOSED _ \ \ WING WALLS FOR INLET PROTECTION / \ \ \ \ / / / p \ \ 1 / `EI„/ / / / / / — — \ \ \ \ /— PROPOSEDVDOTSTD. EC-1, \ \ \ A, — \ \ \ co I / / WIRE O \ / / I J Bp KING / B INSTALLATION TO SERVE O O \ \ \ / L I 690.0' J AS OUTLET PROTECTION \ \ \ \ / / / \ I / / " g / / \— — — — \ \ \ \ \ Q 0 I \ I I \/\ / / L=60' W=60' D=2') \ \ O \ \ / \ \ 0 I / /m / 1 y / / \ \ \ \ \ — / N J O 0 \ \ J I \ \ LIMITS OF \ _. (- \ \ — O \ 1 \ STREAM, TYP. \) % - T TREE PROTECTION \ \ \ . > / j ,j9/ \ \ \ 1 I Ln WPO 201900003 AMENDMENT / A v v A i CV J 0 \ \ \ — L \ \ / O// // \, # 1 LIMITS OF DISTURBANCE // / // /\ f / /f'y \ \\ \ \ \\ \ \\ Q 1 1 Iy I I / \ \ \ L Q / BARRIER O \ O \ q\ O \ \ / / jj / / /\ \ I I I / )/ I LIMITS OF TREE I I \ ` / \ \ \\ \ \ i SANDBAG$, PLl OOD, JERSEY \ \ O O O - 6g \ O O%/ / I I I CLEARING (TAP.) \ \ \ \ - V A O O OA O 4v O / ` I / L, A - BAR RS, OR EQUIVALENT) "\ I \ ) O O \ \\6gz2 O / // / V / \ I I n I / V I I 1 \ \ f" \ \ \ — LLI Z IPROPOSEDIN-STREA RIPRAP / 0 \ p/// / I I I/f / / I ac SOILTYP \ I- \ \ I J Q I 1 \/ \ I SILT FENCE w/ WIRE BACKING \\ / / \ / / I I // / I I' TREE \ \ / 37D3 \ - / WIRE\ IATTRANSITIONS (BE INNING 'C` USC \ / / 0 PROPOSED WITH PLEASANT GREEN \ / / // / / \ / \ " S J_ O A \ & ENDING) OF UTILI STREAM V / O A• A _ — — // r I l I l // I / I I ROT CT / / ) A - BACKING 1 \ Q U CROSSINGDIVERSION \ — ° \ PHASE I CONSTRUCTION / / — _ / // / I\ I . \ \ \ 1 / O I I // / v V I \ 1 I W PROPOSEDALIGNMENTOF \ _ i' _ / / / STREAM DIVERSION WHILE \ \ — — — ' ° / / / / '.fie. V I S I I A \ \ V CONSPAN I INSTALLED. SEE- I I I \ DETAILS &NOTES ON THIS \ -/ / _/ / / WPO 201900603 LIMITS / / / / I \ S Efi 1 ' % / / / /I I II I l l /l///{TS ,\ \ I --\ L9 ~ 0 V tLU OFDISTURBANCE / / / V V A I v 0 I \ l I 1 f \ TREE TP C J I PROTECTION / V / l / I i' ii / l C I l I 1000 r UTILITY STREAM DIVERSION NOTE: SOILTYPE — — — — — — — \ l \ _ / / I I I / / \ \ I I Q \ W LU t \ \ \ CONTRACTOR SHALL REMOVE PROPOSED y / SILT F NC Iw/ WIRE1c/ U L % FLOW BARRIER & STREAM DIVERSION ONLY / / _ — — — STi C / BACKII F" G P(20POSED / I I\ I I I I ' Ac/ / / SOIL TYPE \ \ I F 7 AFTER THE CONSPAN STRUCTURE / / ' — — _ — — — C / 5 WITH P((I(EASNNNN,,NT GREEN 25816 INSTALLATIONHASBEENCOMPLETED, AND 6°F0 — — — S>• _ — _ PHASE IICONSTRUCTION / I I/ / / / / / _ — - — — \ \ I I I _ O THEESCINSPECTORGRANTSAPPROVAL. \ LlJ a / oti — c ( l / I l1 — vv V / 6 v / / //// / / / /^ ,^ I T Ul e0 \ '/ // CRS \ TP TREE // / I l / I I l / l / / AREA TO BE CUT AND USED w O ASFILLFORTHECONNECTOR / LU BA \ _ \ PROTECTION \ // / / //' / I ,/ / ROAD CONSTRUCTION. rn PROPOSED LIMITS OF DISTURBANCE EXPANSION `i 0 / - w//MIRE // / _ / L11 V W BACKIN / / / ` `' / / / / / EXISTING STRUCTURES AND 6 ASSOCIATED WITH THIS PLAN. TOTAL AREA=1.99 ac. / 0 // / / \ \ / / / G \ \ / / / / / / 7 DRIVEWAY 0 BE REMOVED. v v v / m / / I -- — I --I A \ \ V AA A\ VO O\—' O 0°ESCASI SJ# / v //// / I, C> / ` / / / / / p O O 'j fbAKE/ ij / / O W LOCATION OF PORTA-POTTIES W / O / // / / / j / / / / // 11\ \ // -- - / / Q V / I LOCATION OF DOUBLE -WALLED FUELING TANK RCy / PROP ED lil'x Q / LLI , /) QQ IL BOUNDARY LINE (() / // / / / \ CIP / LOCATION OF 15cy DUMPSTER + — AMA PROPOSED CONC. WASHOUT AREA — — — VF L— \ / `_CC\ I \ LLI a PROPOSEDCL. AI RTRAP OUTkALL - 3 \ / i I I / / l / W1= 3', W2=7', L-6', D=2') \ / / I \r IT J OPOSED I CE PROPOSED 12'x70' MINIMU PAVED CONTRACTOR \ - CONSTR CTION ENTRAIN 1TH WASHRACK. i/ M / \ \ \_'a a O / / O STAGING AREA - / ) \ - 71' : / PROPOSEDTEMPORARYCULVERT / v \ s (. INV. IN=705.0, INV. OUT= 7o04.0 a$o 12" CMP, L=16', S=6.26 /o J / 41 EXISTING FIRE HYOiRANT U UUJH EXISTING FIRE HYDRANT \ W/ I -... - Z \ \ p w AA Of CLLn 100 JOB NJO. EN TRANCE WITH WASTHRACK. CE W/<< FFR 182154 GRAPHICSCAL / I •N < 0 20 40 80 \ 460 / ` ' I ` \ H \ NF \ SCALE 7 / \ 4 1"=40' SHEET NO. IN FEET) 5-01 A 9) 1 a 140 1 a I TYPICAL ORIENTATION OF Im'' if . HIN law TREA TMENT I1111,pi011, 1 r .5 --- ----- 0(SOIL STABILIZATION BLANKET)@ SHALLOW ON SHAL SLOPES, STRIPS OF CM COVERINGS MAY BE APPLIED ACR05S THE SLOPE. Evil EPSON BERM WHERE THERE IS A BERM AT THE TOP OF THE SLOPE, BRING THE MATERIAL OVER THE BERM AND ANCHOR IT BEHIND THE BERM.ILL ijF O,, STEEPSLOPE ON STEEP SLOPES, APPLY PROTECTIVE COVERING PARALLEL TO THE DIRECTION OF FLOW AND ANCHOR SECURELY. SAFETY FENCE & SIGNS VVARIJING QUICK SAND, KEEP OUT" PROPOSED WITH PLEASANT GREEN PHASE I CONSTRUCTION PROPOSED BAFFLES BRING MATERIAL DOWN TO A LEVEL TERMINATING THE INSTALLATION. TURN THE END UNDER 4? AND STAPLE AT It INTERVALS. 12" SEDIMENT BASIN DITCH FLOW SILT F&NCE / WIRE dry storage: bottom of trap elevation (ft) 692.5 AC N PROPOSED dry storage required (cy) (67*DA) 73.7 bottom trap dimensions: 24!xT SILT FENCE w/ WIRE THKPILE SANT GREEN BACKING PROPOSED crest of stone weir 6970 top of dam elevation (ft) 698 0 WITH PLEASANT GREENSF CONSTRUCTIONPHASE I CO STRUCTION dry storage provided at this elevation (cy) 1557 top width of dam (ft) 19 PHASE I CONSTRUCTION k slope of dry storaqe sides 3-1 to trap dimensions 103!x43 ly ry, y WIRE I— F e-" 100, WPO B KING ( D ( D a BUFFER, TYP. (D 0 LIMITS OF/TREE 00-YR FLOOPPLAIN, TYP. z j C4CLEARINGASSOCIATED000 WITH WPO 201900003 rq @ 4 00 r4 r4 a 00 CD C) ip FF @ 8 0 e R FLOODPLAIN, TYP. 100-Y (I I G U 0 G 1P 1 2 8 8 (D w/ WIRE e (D G L9N/NIRE BACKING e @aGBACKING % - — — — — — — — — @ LIMITS OF TREE CLEARING (TYP.) —FEF_ PROPOSED VDOT STD. EC 1. CLASS 1 3 OF 1, TYP. RIPRAP WITH A TYPE B INSTALLATION TO RR BE INSTALLED BETWEEN THE PROPOSED z WING WALLS FOR INLET PROTECTION e" PROPOSED VDOT STD. EC-1, CLASS I RIPRAP WITH A TYPE E5 INSTALLATION TO SER. gym C _ j AS OUTLET PROTECTION L=60', W=60', D=2') Ll I C) LIMITS OF TREE PROTECTION a STREAM, TYP. _jSTALLEDDURINGF) CONTRACTOR SHALL INSTALL SIR. C14 (STORM SEWER MH) WITH SEGMENTAL RINGS. A TEMPORARY RING SHALL BE IN O CONSTRUCTION TO OUTLET THE TEMPORARY ESC 15" CMP INTO ST#1 (181.8 LF@ 0.50%, II=694.00', IO=693.08'). DURING CONSTRUCTION WPO201900003 AMENDMENT c1q 0 eo THE LOWER, PERMANENT OUTFALL SHALL BE BLOCKED WATERTIGHT TO ENSURE RUNOFF ENTERS ST #1 & IS NOT DISCHARGED INTHE #1 LIMITS OF DISTURBANCE cr-11 STREAM. ONCE THE STORM SEWER'S SUBAREA IS STABILIZED &THE ESC INSPECTOR GRANTS PERMISSION, THE CONTRACTOR CAN REMOVE I < > THE TEMP. 15" ESC PIPE, MH RING(s) & THE LOWER BLOCKAGE TO ALLOW STR. C14 TO DISCHARGE INTO THE STREAM. LI TREE —702 S I— a I ) ))/ MITS OF lKrr I N l > WCLLEARING (TYP. e U Ld 0 G 0 0 j SILTFENCEw/ WIRE BACKING 6-S 'a < U FIRE,\ j PROPOSED WITH PLEASANT GREEN I I' ROTT Ia 0 BAUKING PHASE I CONSTRUCTION 0 ck LL171 Ck LU o. P w LIMITS / / / / X p SY PO9000/03 L9 0 0 OF DISTURBANCE TREE PROTEC1U LLJ F1 N A III I II I X, UTILITY STREA T_ LU X, M DIVERSION NOTE: V) CONTRACTOR SHALL REMOVE PROPOSED S C WIRE 0 ef 00 ESCPHASE11ST #1 FLOW BARRIER & STREAM DIVERSION ONLY =1.10 ac. BACKIPGPkoPbSED, 1. AFTER THE CONSPAN STRUCTURE SUBAREA 1.10 ac. 0 z 66 40000e L INSTALLATION HAS BEEN COMPLETED, AND PHASE I)CONSTRUCTION w 100- RFLOODPLAINTHEESCINSPECTORGRANTSAPPROVAL. 0 U 0 W11 WIR D SIF Lr) U) 01Ul LU 0 c AREA TO BE CUT AND USED LU TREE cl W/ V mc PROTECTION r AS FILL FOR THE CONNECTOR LU BA PR ROAD CONSTRUCTION. LLJ LU WIRE 7:) 1/ EXISTING STRUCTURES AND PROPOSED LIMITSOFDISTURBANCEEXPANSIONzBACKING,\, j ASSOCIATED WITH THIS PLAN. TOTAL AREA=1.99 ac. 0 DRIVEWAY TO BE REMOVED. z/ co 0 ur) OK 0 eIDLOCATION OF < LU PORTA-POTTIESwxCATION OF DOUBLE -WALLED FUELING TAN PROPOSED LU V) LOCATION OF 15cy DUMPSTER WNC WASH/ 1 1711, PROPOSED CONC. WASHOUT AREA LU x Cl- 0 OPOSED PROPOSED 12 x7 NIMURIPAVEO j qp_P CONTRACTOR CONSTRTION ENTRANC)E ITH WASHRACK. D STAGING AREA CD I / / / \ \ X n \ \ _ / EXISTING FIRE HY6 10 RANT Z/ EXISTING FIRE HYDRANT 0 Lr) PROPOSED 12' x7" MINIMUM E f 424 JOB NO. PAVED CONST CTION ( GRAPHIC RU182154i ,. / / ENTRANCEWITHWASHRACK. 40 0 20 40 80 /160 SCALE 1111=4011 IN FEET SHEET NO. 4\0 ft. - ------- 5 ----- _j PRE -DEVELOPMENT SWM PLAN: SCALE 1 "=50' 100, WPO BUF Eg, 1IP. / o I 10 O 0. O 0. 0• ° 0° O O PROPOSEDIESC LIMITS OF LAND DI\TURBANCE V ASSOCIATED WITH THIS PLAN (1.99 c.) NOT PREVIOUSLY COVERED UNDER A SEPARATE PERMI . THIS ESC LIMITS OF DISTURBANCE BOUNDARY IS USED TO DEFINE THE ARM BOUNDARY FOR WATER QUALITY, TYPICAL. LOCATION OF PROPOSED CONCENTRATED OUTFALLVz o\o STREAMS NP. S BAREA-A- ate \ \ off' _---CPT=55-\ Je=0.s hrs. 10o 01 VERLAND 11G' _QF CQN(;-Ft.oW w/ ON Pre -Development Impervious Area Summary DA A (Water Quantity) \ I Existing Impervious Areas 0 sf11 1 \ am I I o J o I o / y fiL'iL4:• o o l \ \ LIMITS OF I o STREAM, TYP. I ° o 1 o I \ \ o n n POST -DEVELOPMENT SWM PLAN: SCALE 1 "=50' I i P I OF ANALYSIS / / BUFFER, ER TAP. / 0, WPO CATION IN POWELLS ( 100-YEAR FLOODPLAIN,iTYP. / dCREEK WHERE MANMADE RIPRAP IMPROVEMENTS / ARE PROPOSED) o / 000\oo I O O° 00 0 \ PROPOSEDIESC LIMITS OF LAND DI\TURBA WE ° ASSOCIATED WITH THIS PLAN (1.99 a.) NOT PREVIOUSLY COVERED UNDER A SEPARATE PERMI .THIS ESC LIMITS OF DISTURBANCE BOUNDARY IS USED TO DEFINE THE BOUNDARY FOR WATER QUALITY, TYPICAL. POST-DEV. SUBAREABAREAA \ CN=90 /, \ I Tc=O 10 hrs. o 1 C 5/ / Al 30' OF OVERLAND F OW w/ A ELEV.=2', 10 0 NC. FLOW w/ G ELEV.< 1' &- 275' OF CHA N TTER & PIPES _ Post -Development Impervious Area Summary DA A (Water Quantity) \ \ Existing Orchard Drive (Outside this Plan's VRRM Boundary) 1,875 sf Proposed Sidewalk (Within this Plan's VRRM Boundary) 9,225 sf / I Proposed Sidewalk (Outside this Plan's VRRM Boundary) 1,225 sf / Approved Sidewalk (Outside this Plan's VRRM Boundary) 1,100 sf / Proposed Roadway (Within this Plan's VRRM Boundary) 12,250 sf Proposed Roadway (Outside this Plan's VRRM Boundary) 1,225 sf Approved Roadway (Outside this Plan's VRRM Boundary) 5,025 sf 31,925 sf c COUNTY OF ALBEMARLE Professional WATERSHED SUMMARY M Department of Community Development STORMWATER MANAGEMENT NARRATIVE: Area, 1-year Flow, 2-year Flow, 10-year Flow, Construction Record Drawings (As -built) for VSMP CN ac. cfs cfs cfs OVERVIEW: THE PROPOSED STORMWATER MANAGEMENT PLAN COMPLIES WITH PART IIB SWIM DA A (Pre-Dev.) 55 0.92 0.17 0.33 1.73 REQUIREMENTS. ADDITIONALLY, THE CHANNEL & FLOOD PROTECTION REQUIREMENTS FOR The following is a list of information required on construction record drawings for DA A Post Dev. 90 0.92 3.05 3.92 6.53 THIS PROJECT ARE MET. PLEASE SEE THE ATTACHED STORMWATER MANAGEMENT CALCULATIONS PACKET FOR ADDITIONAL DETAILS PERTAINING TO THIS PLAN'S WATER stormwater facilities (reference Water Protection Ordinance 17-422). It is preferable that the QUALITY AND QUANTITY COMPLIANCE. construction record drawin be re ared b someone other than the desi ner. Please do notgPPyg WATER QUALITY SUMMARY THIS PROPOSED PLAN REQUIRES A TOTAL PHOSPHOROUS REMOVAL RATE OF 0.92 Ibs/yr. provide design drawings as construction record drawings. General Construction notes for Stormwater Mana ement Plans THE STORMWATER QUALITY REQUIREMENTS FOR THIS PLAN ARE MET WITH THE PLEASANTQQ Post -Development VRRM Impervious Area Summary 1. All dams and constructed fill to be within 95% of maximum dry GREEN DEVELOPMENT. THE PHOSPHOROUS REMOVAL RATES PROVIDED IN THE PHASE I A. A sl$ ned and dated seal of the P Pan$$ Y- B. The name and address of the firm and individual preparing the drawings on the title sheet. C. The constructed location of all items associated with each facility, and the inspection records to verify proper dimensions, materials and installation. The items include, but are not limited to the following: l Inspection Records and photographs for i trenches and bedding, including underdrains. peccP8mPpipe $, $ drams be approved by a g otechnical engineer. A geotechnical engineer is PHASES II & III PLAN (WPO 202000053 & WPO 202000053 AMENDMENT #1) EXCEED THE REQUIRED PHOSPHOROUS REMOVAL RATE FOR ALL OF PLEASANT GREEN. OVERALLMINIMUMREtobepresentduringconstructionofdams. Q PORTION OF THISSURPLUSINPHOSPHOROUSREMOVALCREDITISAPPLIEDTOTHISPLAN2. Pipe and riser joints are to be watertight within Stormwater / management facilities. THE PLEASANT GREEN DEVELOPMENT. PLEASE SEE THE 'PLEASANT GREEN WATER QUALITY 3. For temporary sediment traps or basins which are to be converted MASTER PLAN' SUMMARY SHOWN ON THIS SHEET FOR DETAILS. ADDITIONAL CALCULATIONS t t t t t f :I;,: t ARE PROVIDED WITH THIS PLAN' SWIM PACKET 25150 sf o permanen s ormwa er managemen ac++ +es, convers+on +s no s 2. Video Pipe Inspection for any pipes which are not accessible or viewable. to take place until the site is stabilized, and permission has been 3. Updated Location with o-coordinates of all facilities. Pobtained from the County erosion control inspector. PLEASE NOTE, THE PROPOSED IMPACTS ASSOCIATED WITH THIS PLAN TO AN 4. Verified Drainage Area maps for the drainage area cleated, and for drainage t0 the facilities. EXISTING/ RECORDED OFFSITE SWIM FOREST & OPEN SPACE EASEMENT WERE MITIGATED UNDER A SEPARATE APPROVED PLAN (WPO 201600069 AMENDMENT #2). THE NUTRIENT 5. Current physical and topographic survey for all earthen structures. Ponds should include a survey CREDITS ASSOCIATED WITH THIS WPO 201600069 AMENDMENT #2 WERE EXECUTED ON of the pond bottom. Surveys should verify pond Volumes are r design. Corrections may be required POYYPOper $ Y e4 PLEASANT GREEN WATER QUALITY MASTER PLAN 2/ 1/21 AND THE EASEMENT VACATION WAS RECORDED ON 12/21/21 IN DB 5657, PAGES 428- 432 FOR SUB 202100006. for alterations from the design. SUMMARY OF PHOSPHOROUS REMOVAL RATE REQUIRED 6. Plants, location and type.Total Phosphorous Removal Rate Required for Proposed Pleasant Green Phases I, 11, III and the Connector Road 24.67 Ibs/yr WATER QUANTITY SUMMARY 7. Plans and profiles for all culverts, Pipes, Risers, Weirs and Drainage Structures - Display the See this plan's report & the WPO 202000053 forthe Overall Pleasant Green Water Quality Analysis) THE PROPOSED PLAN CREATES ONE CONCENTRATED OUTFALL. THIS OUTFALL IS DIRECTED INTO A ROBUST MANMADE RIPRAP LINED OUTLET PROTECTION INSTALLED IN THE BED OF installed type of drainage structures. culventpipe size, weirs, materials, inlets or end treatment(s), POWELLS CREEK. inlet and outlet protection, alignment and invert elevations compared to design. NOTE: A Phosphorous Removal Rate of 0.271bs r was Provided B Others for the Connector Road's Impacts to a SWIM Forest & Open Space Esmt. This P /Y (Y ) p P P THE PROPOSED STORM SEWER AND THE RIPRAP LINED OUTFALL PROTECTION ARE 8. Computations: For significant deviations from design, provide sealed computations verifying that 0.27 Ibs/yr credit is independent of the Pleasant Green development and is not used in this table's compuations. See WPO 201600069 Amendment #2 for DESIGNED FOR THE 10-YEAR DESIGN STORM. THE STORM SEWER AND RIPRAP CONVEY THE the as built condition is equivalent Or bete[ than design. eCl $ additional details. 10-YEAR AND 2-YR 24-HOUR POST -DEVELOPMENT STORM EVENTS WITHOUT CAUSING EROSION OF THE SYSTEM. BECAUSE OF THIS, CHANNEL PROTECTION COMPLIANCE IS MET 9. Ditch Lines - Display the constructed location of all ditch lines and channels, including typical SUMMARY OF PHOSPHOROUS REMOVAL RATE PROVIDED FOR THE PROJECT VIA 9 VAC 25-870-66, SECTION B.l.a. THE LIMITS OF ANALYSIS FOR SeCIIOOS and linings. Approved Phase I (WPO 201900003) Phosphorous Removal Rate Achieved from Nutrient Credits 6.97 Ibs/yr CHANNEL PROTECTION IS SET BY SECTION BA.a, OR WHEN THE SITE'S CONTRIBUTING DRAINAGE AREA (SUBAREA A) IS LESS THAN OR EQUAL TO 1.0% OF THE TOTAL WATERSHED 10. Easements - Show all platted easements with dead book references labeled. Facilities and drainage Approved Phase I Borrow Area (WPO 201900003 Amendment #1) Phosphorous Removal Rate Achieved from Nutrient Credits 0.18 Ibs/yr AREA TO THE RIPRAP LINED BED OF POWELLS CREEK (3.18 SQUARE MILES). must be within platted easements. Provide copies of recorded documents. tppProposed Phosphorous Removal Rate Achieved from Phases I I & III WPO 202000053 Level II Wet Pond Outfallin to Conservation Area Subarea B PP ( ) g ( ) 7.59 Ibs r Y11. Guardrail, fences or other safety provisions -Display the constructed location of all safety Proposed Phosphorous Removal Rate Achieved from Phases I I & I I I (WPO 202000053) Outfall to a Vegetated Filter Strip (Subarea C) 5.07 Ibs/yr THE PROPOSED STORM SEWER OUTFACES DIRECTLY INTO THE RIPRAP LINED OUTLET PROTECTION, AS DESCRIBED ABOVE. THIS RIPRAP LINED OUTLET PROTECTION IS proVlSlOnS; fences, guardrail, including the type, length and applied end treatments, compared to Proposed Phosphorous Removal Rate Achieved from Phases 11 &III WPO 202000053 Outfall to a Vegetated Filter Strip Subarea D PP ( ) g P ( ) 3.06 Ibs r YPROPOSED TO BE INSTALLED IN THE BED OF POWELL'S CREEK. THE STORM SEWER design. Approved Phase I (WPO 201900003) Phosphorous Removal Rate Achieved from the Level 11 Bioretention Basin (Subarea E) 1.42 Ibs/yr CONFINES THE T-DOVERTOPPING,ELOMENTPEAKATE FROM THE 10-YEAR 24-HOURSTORM POST-DEVELOPMENTEA FLOWNG 12. Material layers - bioftlter media, stone layers, sand layers, keyways and cores must be verified as to Proposed Phosphorous Removal Rate Achieved from Phases 11 &III (WPO 202000053) SWM Forest &Open Space Easement 1.59 Ibs/yr EVENT WITHOUT ZED FLOODING, RIOR TO BEING RELEASED INTO POWELLS CREEK. BECAUSE OF THIS, FLOOD PROTECTION COMPLIANCE IS material types and depths. Include inspection reports, boring or test pit reports and materials MET FOR THIS PROJECT VIA 9 VAC 25-870-66, SECTION C.2.a. THE LIMITS OF ANALYSIS FOR certifications. Biofilter media must be an approved stale mix. Total Phosphorous Removal Rate Provided 25.88 Ibs/yr FLOOD PROTECTION IS SET BY SECTION C.3.c, OR WHEN THE STORMWATER CONVEYANCE SYSTEM ENTERS A MAPPED FLOODPLAIN. TotalPhosphorousRemovalRateProvidedOnsite18.73 Ibs/yr 13. Access roads - show location of access roads, surface treatment, drainage, etc, as applicable. Percentage of the Required Phosphorous Removal Rate Treated Onsite (18.73 / 24.67 x 100) 76 % PLEASE SEE THE ATTACHED STORMWATER MANAGEMENT CALCULATIONS PACKET FOR 14. Compaction reports am required to Verify fill compaction in dams. ADDITIONAL DETAILS. t5. Manufacturers certifications for proprietary BMP's certifying proper installation and functioning. EXCERPT FROM APPROVED SUB 201600238 SHEET 1 WITH THIS PLAN's LIMITS OF DISTURBANCE OVERLAID: I LE 1 "=100' P D' k 4 V 441 THE PLEASANT GREEN DEVELOPMENT IMPACTS A SWIM FOREST & OPEN SPACE AREA PRESERVED UNDER AN EASEMENT J RECORDED IN SUB 201600238. THE IMPACTED AREA IS HATCHED BELOW.^• THIS AREA WAS VACATED IN SUB 202100006. THE RESULTANT LOSS IN WATER QUALITY CREDITS WAS MITIGATED IN WPO 201600069 AMENDMENT # 2. SEE THAT PLAN FOR ry $ 0 2 1 ADDITIONAL DETAILS. S18•OZ'S KNESgk 02N 42' 2S11'35 50 E 88. 3 ya p. - Qb v0 f2 f 4 h . 7 08,70so. SCOTT/ R. CULLINS'Z No. 35791 ,:, P 10/26/22 o % 1101VAL N W C J_ l jW O_ N L I _ m WWM W ZZ OH F h O U E Z nJ Z nJ W O 2: O2: OO w C V/ Z w u V) F-W U z F- w F Wa d W u O O to u W W W LXW LU LU Lu N W N N N N r1i Q W N 0\1n 7 N CNNNi \ i C) L9 7 ti cl co nl z J N W CN00 LL N J Z_ J 5; Q z O w. UJ V z l Q LU Q IN L)LU z LU O w F_ U Q DzUlU) w H w ZLU // kV t''' Oi FF n z cn tJ LU Ln Q w Q J 0 CD CD N I- Lu W O w of x LnJOB NO. 182154 SCALE AS SHOWN SHEET N0. 6 PROPOSED MANMADE CONCRETE DAM REMOVAL DETAIL: SCALE 1 "=50' lrJ / 00000 00 BUFFER, TYP. COUNTY DEFILED PRESERVED TEEP LOPES TO REMAIN (TYP.) i 752 pUtOTfF,R-T1(LIMITS, EXISTING CONCRETE DAM PROPOSED TO BE REMOVED. GIVEN ITS B( CLOSE PROITY TO THE PROPERTY LIMITS, THE CONTRACTOR SHA L STAKE ;CbNFIRM THETWPOSED DEVELOPMENT'S PROPERTY EMITS \ ` — THE EXISTING DAM PRIOR TO CONSTRUCTION. CONSTRUCTION \ \ \ LIMITS OF POWELLSACTIVITYASSOCIATEDWITHTHEDAJsIREMOVALSHAZT}E,LIMTED TO` — — THE ONSITE TAX MAP- PARCELS 56-11114 & 55C-03-A. I \ \ CREEK, TYP. I ,/— TMP 55c-03-B TMP 56-115 CONCRETE DAM REMOVAL PLAN & SEQUENCING: / A PHASE II ENVIRONMENTAL SITE ASSESSMENT (ESA) WAS COMPLETED IN ACCORDANCE WITH MINIMUM ASTM STANDARDS. THE PHASE II ESA INCLUDES, BUT IS NOT LIMITED TO, SAMPLING AND TESTING OF ACCUMULATED SEDIMENT BEHIND THE DAM THAT / S EXISTS ON THE PROPERTY. THE CONTRACTOR SHALL COMPLY WITH ALL RECOMMENDATIONS OF THE PHASE II ESA PRIOR TO / ISSUANCE OF THE FIRST BUILDING PERMIT IN PLEASANT GREEN'S PHASE II. THE CONTRACTOR SHALL ALSO REMOVE ACCUMULATED SEDIMENT FROM BEHIND THE DAM PRIOR TO DEMOLITION OF THE DAM AND DISPOSE OF THE SEDIMENT, EITHER i / ON SITE OR OFF SITE, IN ACCORDANCE WITH WITH THE PHASE II ESA RECOMMENDATIONS. ` THE TIMING OF THE CONCRETE DAM's REMOVAL WILL BE DETERMINED BY THE CONTRACTOR SINCE THE SCHEDULE WILL BEST BE KNOWN BY HIM OR HER. THE CONTRACTOR SHALL INFORM THE COUNTY ESC INSPECTOR AND THE COUNTY ENGINEERING / DEPARTMENT A MINIMUM OF 5 BUSINESS DAYS PRIOR TO COMMENCING WORK. THE INSTALLATION OF THE CONSPAN STRUCTURE AND ITS RIPRAP PLACED IN THE STREAM BED MAY LIMIT FLASH RUNOFF FROM EXISTING THE PROPERTY DOWNSTREAM, BUT THIS / IS NOT A PREREQUISITE TO THE DAM's REMOVAL. THE DAM's DEMOLITION SHALL OCCUR FROM THE TOP TO BOTTOM SO THAT \ IMPOUNDED WATER MAY BE RELEASED MORE SLOWLY OVER A PERIOD OF TIME AND WILL NOT OCCUR ALL AT ONCE. THE DAM's DEMOLITION SHALL OCCUR AFTER A PERIOD OF 3 CONSECUTIVE DRY WEATHER DAYS. CONSTRUCTION EQUIPMENT & TRAFFIC D / \ SHALL REMAIN ONSITE AT ALL TIMES AND SHALL ORIGINATE FROM THE PROPOSED RAMBLING BROOK LANE ROAD CROSSING / UNDER CONSTRUCTION. CONSTRUCTION VEHICULAR TRAFFIC SHALL ONLY TRAVERSE POWELL CREEK AT THIS PLAN's APPROVED / CROSSING. CONSTRUCTION DEBRIS RESULTING FROM THE DEMOLITION OF THE DAM SHALL BE COLLECTED AND REMOVED FROM / THE STREAM BUFFER. UPON THE COMPLETION OF THE DAM's DEMOLITION AND REMOVAL, THE CONTRACTOR SHALL STABILIZE THE CHANNEL BANKS WHERE DISTURBANCES OCCURED IN ACCORDANCE WITH DETAIL 1.1 SHOWN ON THIS SHEET. MITIGATION PLAN VICINITY MAP: SCALEI"=100' I I I Icy P OPOSED IMPACTS (44,175sf) TO — 1T WPO BUFFER RESULTING FROM THE PROPOSED DEVELOPMENT, TYP. i PROPOSED IMPACTS TO STREAM BUFFER: SCALE 1 "=50' Dim 8k- \ l COUNTY DEFI)VED / ^ o P. i`ESERVED STEEP - SLOPESS TO REMAIN - MR.) / 2 V A\ TMP 5-09-A1 1.1 DLO I / Fj The Virginia Stream Restoration & Stabilization Best Management Practices Guicl" DETAIL 1.1: CFDAR TRFF REVETMENT Cedar Tree Clamp 2/3 bank height typ.) 12' Max. 5' Min. 0 Cable Clamp Anchor SECTION End Treatment In a Stable Area of the Streambank F(D Trunk End Of Tree Facing Flaw , Stablize Endtwith Riprap Anchor Both Ends of Each Revetment Tree Into Streambank PLAN End Treatment in a Stable Area of the Streambank ADAPTED FROM MISSOURI DEPT. OF ON RVA ICSE NT0 TREE REVETMENTS FOR STREAMBANK STABILIZAT ION BANK PROTECTION GUIDELINES DECEMBER 2003 VIRGINIA DEPARTMENT OF CONSERVATION RECREATION THE SOURCE FOR DETAIL 1.1 SHOWN ABOVE, CEDAR TREE REVETMENT, WAS TAKEN FROM THE VIRGINIA STREAM RESTORATION & STABILIZATION BEST MANAGEMENT PRACTICES GUIDE. THIS GUIDE WAS FUNDED BY DEQ THROUGH GRANT NUMBER NA17OZ2355 OF NOAA, AND THE PROJECT WAS ADMINISTERED BY DCR. r J PROPPED CONS STRUCTURE (NOT PAT;'A> OF THI PLAN) AT ROWELL CREEK CROSSINt ITH THt PROPOSED RAMBLING BROOK LAN F< yTI R PLEASA _ / Gj / \ E PHASE,Ii T—// / //// j , i i — PA. T F/TH S/PAN / /j/ /i,.••' — / // i — — V J V/ / / / / / I ( / I Y / / f / STREAM BUFFER MITIGATION NOTES: v/ / l / / / '':`.': •'• \ / / i THE EXISTING STREAM BUFFER ON -SITE IS HEAVILY WOODED, 50 TRADITIONAL MITIGATION L_ / // v I // / / /' / j/ // O \ PLANTING CAN NOT BE ACCOMPLISHED. THIS PLAN PROPOSES THE FOLLOWING MEASURES TO WP STREA BUFFER / MITIGATE IMPACTS TO THE EXISTING STREAM BUFFER AND FILLING IN THE FLOODPLAIN: 1. THE CONTACTOR SHALL REMOVE THE EXISTING CONCRETE DAM IN POWELLS CREEK, AS I / / \ SHOWN AND NOTED ON THIS SHEET. THIS PLAN PROPOSES TO REMOVE THE CONCRETE DAM THAT IMPODS S C KORTH 0 NATERINPWELLREENF THE PR P ED N I U W O ( 0 CONSAT J / / / / _ I / / f — / / / / / / STRUCTURE). WITH THE REMOVAL OF THIS DAM, THE NATIVE STREAM FLOW PATTERNS WILL BE RESTORED. THIS WILL HELP RESTORE THE RIPARIAN HABITAT THAT HAS BEEN ALTERED DUE TO THE DAM CONSTRUCTION AND ALLOW AQUATIC LIFE TO TRAVEL UP AND DOWN THE STREAM SCHEME FOR EVERY 400sf (OR 20'x20' SECTION) SHALL CONTAIN THE FOLLOWING: BED, RESTORING THE NATURAL PROCESSES CURRENTLY IMPACTED BY THE DAM. ONCE THE DAM IS REMOVED, THE CONTACTOR SHALL STABILIZE THE STREAM BANKS THAT WERE DISTURBED BY THE DAM's REMOVAL IN ACCORDANCE WITH THE DETAIL SHOWN ON THIS THEWATERSIDE50% OF THE BUFFER: SHEET, OR AN EQUIVALENT METHOD ACCEPTABLE TO BOTH THE OWNER AND THE ESC TWO ( 2) - 1}2 CALIPERRNATIVE CANOPY NATIVE UNDERSTORYEE OR TREESLORGEVERGREENSNATT4' OR ONE (1) NATIVE UNDERSTORY TREE AND INSPECTOR. TWO 2 LARGE SHRUBS AT 3'-4' 2. IN CONJUNCTION WITH ITEM #1 ABOVE, THE STREAM BUFFER SHALL BE RESTORED IN AREAS ALONG POWELLS CREEK WHERE TREE COVER IS MORE SPARSE OR WHERE INVASIVE SPECIES THREE (3) SMALL NATIVE SHRUBS OR WOODY GROUNDCOVER AT 15"-18" HAVE OVERTAKEN AREAS THE TOTAL MAXIMUM MITIGATION PLANTING AREA FOR THIS THE LANDWARD 50% OF THE BUFFER: DEVELOPMENT IS 88,350sf (EQUALTO 2x THE PROPOSED IMPACTS). MITIGATION PLANTINGS NATIVE BARE ROOT SEEDLINGS OR WHIPS AT 1,210 STEMS/ACRE, APPROXIMATELY 6' O.C. SHALL FIRST OCCUR ONSITE IN THE STREAM BUFFER WHERE VEGETATION IS MORE SPARSE. IF 600 MINIMUM PLANT SURVIVAL REQUIRED AFTER TWO GROWING SEASONS) OR A TOTAL PLANTING AREA OF 88,350sf CAN NOT BE LOCATED WITHIN THE SITE's STREAM v CONTAINERGROWN NATIVE SEEDLING TUBES AT 700 PER ACRE, APPROXIMATELY 5' O.C. BUFFER WHERE AREAS ARE LESS VEGETATED, THEN THE CONTACTOR SHALL HIRE AN EX Si7ING CON6RE\ (490 MINIMUM PLANT SURVIVAL REQUIRED AFTER TWO GROWING SEASONS) ARBORIST TO PROVIDE A REPORT DEPICTING THE PRESENCE, IF ANY, OF INVASIVE SPECIES T DAB / / / ` C / // PROPOSE6T0 BFiREMOVFA — — 2 \ f / / % ) / / \ WITHIN THE SITE'S STREAM BUFFER. THE ARBORIST's REPORT SHALL INCLUDE A PLAN FOR THE REMOVAL OF THE INVASISVE SPECIES AND FOR THE AREAS' REPLANTING. THE REPLANTING OF PLANTING NOTES: MITIGATION MAINTENANCE PLAN: 1. ALL MITIGATION PLANTINGS SHALL COMPLY WITH THE RIPARIAN BUFFERS GUIDANCE MANUAL BY CBLAD. THESE AREAS SHALL BE IN ACCORDANCE WITH THE 400sf MITIGATION PLANTING SCHEME 2. ALL MITIGATION PLANTINGS SHALL BE NATIVE TO ALBEMARLE COUNTY, VA. THE FOLLOWING ARE NATIVE TO ALBEMARLE SHOWN ON THIS SHEET. THE TOTAL MITIGATION PLANTINGS & REPLANTINGS AREAS SHALL GROV41NG SEASONSWINTERMONTHS. THE COUNTY AND ARE PROPOSED WITH THIS PLAN, BUT MAY BE SUBSTITUTED WITH ANOTHER NATIVE PLANT: NOT BE REQUIRED TO EXCEED 88,350sf. EXiS IN WIDGx S I6 H ROUBLE \ \ \ \ \ \ — INSPECTION SHALLTRIGGERMAINTENANCE OP RATIONS, AS REQUIRED. MAIN ENANCE DURING OPE ATIONSFALLMAY INCLUDE, BUT S NOT LIMITED LIQUIDAMBAR STYRACIFLUA "ROTUNDILOBA" OR "ROTUNDILOBA SWEETGUM (CANOPY TREE) 3. THE CORRECTIVE MEASURES DESCRIBED ABOVE WILL RESULT IN PLANTINGS THROUGHOUT I I OrK CULVERT Aj POWELL REEK / \ " " \ — TO, TRASH REMOVAL AND ENSURING A DENSE, HEALTHY GRASS / FOREST GROUNDCOVER. MOWING & BUSH HOGGING MAY BE ALLOWED ILEX X AQUIPERNYI "DRAGON LADY" OR "DRAGON LADY" HOLLY (LARGE EVERGREEN) THE ONSITE POWELLS CREEK STREAM BUFFER AND WILL MITIGATE THE IMPACTS FROM THE C 9 / PROPOSED CONSTRUCTION. ACER PALMATUM OR JAPANESE MAPLE UNDERSTORY TREE OSSING WITH EISTINGCJLWGLANEI \ WITHIN THE STREAM BUFFER AND MITIGATION AREAS FOR THE SOLE PURPOSES OF REMOVING OVERGROWN INVASIVE SPECIES AND FOR ( ) 4. A BOND SHALL BE PROVIDED PRIOR TO CONSTRUCTION ACCOUNTING FOR THE COST OF CLEARING THE TRAIL. HOWEVER THE MOWING & BUSH HOGGING SHALL BE LIMITED TO A MAXIMUM OF FOUR TIMES A YEAR. THE MYRICA CERIFERA & CVS OR SOUTHERN WAX MYRTLE (UNDERSTORY EVERGREEN) REMOVING THE MAXIMUM 88,350sf OF INVASIVE SPECIES AND FOR PROVIDING NEW l / // — / / l i( / CONTRACTOR SHALL CONDUCT THE ANNUAL INSPECTION FOLLOWING THE FIRST YEAR THE PROJECT IS COMPLETED, AND THE OWNER BUXUS SEMPERVIRENS & CVS OR AMERICAN BOXWOOD (LARGE SHRUB) MITIGATION PLANTINGS OF THE MAXIMUM 88,350sf. IN THE EVENT THE ARBORIST's REPORT SHALL CONDUCT THEANNUALINSPECTIONSTHEREAFTER. 3. ALL MITIGATION AREAS SHALL BE PROTECTED BY A MAINTENANCE AGREEMENT. IDENTIFIES LESS THAN 88,350sf OF AREA AVAILABLE FOR MITIGATION PLANTINGS / 4. DCR's RIPARIAN BUFFERS MODIFICATION & MITIGATION GUIDANCE MANUAL DEFINES A CANOPY TREE AS A TREE THAT REPLANTINGS, THEN THE AREA OF INVASIVE SPECIES REMOVAL AND MITIGATION MITIGATION SCHEDULE: REACHES35' IN HEIGHT OR LARGER WHEN MATURE. THE MANUAL DEFINES AN UNDERSTORY TREE AS A TREE THAT REPLANTINGS SHALL BE EQUAL TO THAT OF THE LESSER AREA DETERMINED BY THE ARBORIST THE CONTRACTOR SHALLSCHEDULEAMEETINGONSITEWITHTHECOUNTYENGINEERANDTHEOWNERPRIORTOANYMITIGATIONPLANTINGSTOFINALIZE THE LOCATION AND QUANTITIES. IN THIS MEETING THE CONTRACTOR SHALL PROVIDE AN APPROXIMATE DATE MATURES TO A HEIGHT OF 12' TO 35'. A LARGE SHRUB IS DEFINED AS A SHRUB THAT REACHES 10' OF HEIGHT OR DUE TO THE STATE OF THE EXISTING HEAVILY FORESTED STREAM BUFFER. FOR THE MITIGATION PLANTINGS, WHICH SHALL OCCUR IN THE FALL OR SPRING. PLANTINGS SHALL ONLY OCCUR AFTER INITIAL UPLAND GREATER AT MATURITY, AND A SMALL SHRUB IS DEFINED AS A WOODY PLANT THAT CAN REACH UP TO 10' OF HEIGHT AT 5. THE ONSITE STREAM BUFFER's MITIGATION SHALL BE COMPLETED PRIOR TO THE FULL RELEASE ESC MEASURES ARE IN PLACE. MITIGATION PLANTINGS SHALL BE COMPLETED PRIOR TO THE FULL RELEASE OF THE MITIGATION BOND. MATURITY. OF THE MITIGATION BOND. SCOTT/R. CUL] No. 35791 10 8/24/ 22 ti&IONAL E i N Ww w LU re)m o as= w Z J C] C] F O O u O E Z w Z w W z z O W z o UUWz oF w Z i i H W W www a a aoW0 W0 W0 WW WW N N N N CD CN N m n 7 Q CD CNNNL9tiC) C' M C7) N z J I WN O 00 IIIQ L J o J Q O z o O z L = w O LU U UlU) z l..l.. l LU z Nw L. 1_ F_ U z J LU U) Jw Q J 0VO O N U H LU O W w Of LnJOB NO. 182154 AS SHOWN SHEET NO. 7