Loading...
HomeMy WebLinkAboutWPO201800066 Application WPO VSMP 2018-08-15 .�oY nLa�sa Virginia Stormwater Management ]Program (VSMP) oeiii?� Application for Albemarle-County VLt ) Mock � 1-3 Project Name: DJd Thal i , LQ S A -- (The name should be the sanzeaxs it appears on plans) Is this an amendment,to an approved plat? ''es ❑ No gf Is this a revision or resubmission for review? Yes ❑ No CY - County File Number: (to be provided by the County for new applications) The following are required elements of new applications[from code section 17-401J. For revisions or amendments,please indicate which items are_being amended. Signatures must be provided for any submission. • ❑ A. Signature of the Property Owner for each parcel; (Required with every submission or revision, NOT TO BE SIGNED BY AN AGENT OR CONSULTANT) By signing this application as the.owner,I hereby certify that all requirements of these plans and permits will be complied with,and I.have the authority to authorize the land disturbing activities and development on the subject property. I hereby grant the.County of Albemarle the right to enter upon the property as required to ensure compliance with the approved plans and permits. • NOT'yEr Crab ergerpriss kiy .R ad r) WiUiam b. Craig Apo- a 4f 8/is 118 Tax Map&Parcel Print Name of Propertl Owner Signature of Owner Date _ Er�1cf pr+ss,5 b.f./ WiU.iam D. Croji AAAi7 � O 8-J1-5II Tax M p&Parcel. Print Name of Propert wner Signature of Owner Date Croi9 eprnseS ba-1 % L1 rn Crati Gvl v '2 L'i 6..1151(8 Tax ap&Parcel Print Nam;of Propert caner Signature of Owner Date Craig EVVY prusgs 6y �YiUiam /444.11% Tax Map&Parcel Print Name of Proper Owner Signature'of Owner Date Contact Information for the Owner(s)to receive correspondence: Print Name. V ° i 1.11 QM . Cr , Address 1 D, WIC Lo)5/p City Chr).oiCSv1 t,lX State . on Zip Aagetio Daytime Phone( 1tr) -WOLF- E-mail U)W&Ad Crcuj &5 incu,0, (,QrYl 7/1/14,Revised: 7/10/14, 1/7/14 Page 1 of 2 ❑ E. All Fees [Code section 17-208] For new or modified plans; Total acres proposed to be disturbed Ro Acres to be Total Fee Fee Due with this Fee with Transfer or disturbed • .p ..ation modification of permit_ Less than 1 $290 ;.145 $20 1 and less than 5 $2,700 $1,350 $200 5 and less than 10 $3,400 $1,700 $250 10 and less than 50 $4,500 $2,250 $300 5.0 and less than 100 $6,100 $3,050 $450 100 and.more $9,600 $4,800 $700 For(minor)amendments to an approved plan; $200 per review Variances;$150 (per request) Mitigation Plan;$150 El C. Registration Statement:on the official DEQ form. ❑ D. Erosion and Sediment Control Plan satisfying the requirements of code section 17-402.. CI E. Stormwater Management Plan satisfying the requirements of bode section 17-403. ❑ F. Pollution Prevention Plan satisfying the requirements of code section 17-404. ❑ G. Stonnwater Pollution Prevention.Plan satisfying the requirements of code section 17-405. ❑ H. Mitigation Plan satisfying the requirements of code section 17-406.for any proposed disturbance of stream buffers. ❑ I. Requested Variations or Exceptions as provided in code sections 17-407 and 408. ❑ J. Construction Record Drawings (as-builts) for any existing facilities in the proposal satisfying the requirements of code section 17-422. Provide 2 copies of all plans and any supporting documents. Professional seals must have original signatures. Additional information if not provided on plans and documents: Name of a Contact Person for correspondence(usually the plan-preparer, consultant or agent) Print Name J3Q. g3Sh1flS9 Address T R.o . Poi. 61 st.o City ChorIdrkSVi (IS State V R Zip -e1OIA Daytime Phone(703) agog,- 4495 E-mail De. koshan.cviiG'a i corn *When applications and plans are reviewed,but not approved,and a response to comments is not received within 6 months from the date of county comments,the application will beideemed withdrawn. Applications without valid owner's signatures will:not be considered valid. FOR OFFICE USE ONLY WPO# :. . Fee Amount$ Date Paid By who? Receipt# CIc# By: 7/1/14,Revised: 7/10/14, 1/7/14 Page 2 of 2 COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,North Wing Charlottesville,Virginia 22902-4596 ' Tel. (434)296-5832 s.Fax(434) 972-4126 Stormwater Pollution Prevention Plan (SWPPP) For Construction Activities At: ad J`` t :(�1 [31��1c: aa, Lod �- 43 ProjectNar��e: A`� i Address: TBD Chozd--, :UA aag3a Prepared by: Name: UJulXta5n b. 6-tr-t;ti Prepared for: _ Name: 0111 BUJdL(L SWPPP Preparation Date: 8115 118 (This document is to be made publicly available according to 9VAC25-880-70, Part II, section D) alld 'i.► oleo luewp8dea luauidolanaa A unwwo3 flunoa aliewaq v a4l Aq a3AO1=1d0 Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County CONTENT'S o (from Albemarle County Code Sec. 17-405) 10 Registration statement 2. Notice of general permit coverage 3. Nature of activity 4. Erosion and Sediment Control Plan. 5. Stormwater Management Plan 6. Pollution Prevention Plan. 7. Discharges to impaired waters, surface waters within an applicable TMDL wasteload allocation, and exceptional waters. 8. Qualified personnel 9. Signed Certification 10. Delegation of authority. 11. General permit copy 12. Inspection logs Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP)Albemarle County - Section 1. Registration statement • (Provide a signed completed copy of the DEQ registration statement) • Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP)Albemarle County Registration Statement General VPDES Permit for Discharges of Stormwater from Construction Activities (VARIO) (Please Type or Print All Information) 1. Construction Activity Operator: (General permit coverage will be issued to this operator. The Certification in Item #12 must be signed by the appropriate person associated with this operator.) Name: 1/Cr .t,1Ckr5 Contact: V v I l Qi��L>>Qa�r� D Mailing Address: 1), O 80X to City: CharIQ4-IfsvI LLQ State: U-ir) Zip: aa9'L?{o Phone: (434) oayR—Q3(4 Email address (if available): CITY)dcraij P 9 mat,I. Corr Indicate if DEQ may transmit general permit correspondence electronically: Yes No ❑ 2. Existing General Permit Registration Number(for renewals only): Clio- 3. Name and Location of the Construction Activity: ' �1 Name: DM TriadVi , abc1iC. as LSJic i- 43 Address (if available) -1113D City: CXU r State: U Zip: a*3�, £1.L County(if not located within a City): . r1cvt� . Latitude (decimal degrees): . . Longitude (decimal degrees): Name and Locati n of all Off-site Support Activities to be covered under the general permit: Name: 11�� Address (if available): . . . . . City: . . . . State: Zip: . County(if not located within a City): . Latitude(decimal degrees): - Longitude (decimal degrees): 4. Status of the Construction•Activity(check only one): Federal ❑ State❑ Public❑ Private Lam' 5. Nature of then Construction Activity(e.g., commercial, industrial, residential,agricultural, oil and gas,etc.): cith n4 6. Name of the Receiving'Water(s) and,Hydrolloogiic��U��nit Code(HUC): Name:CAI.L LM-A DI-l9'i . AA1 C2 (11..lt1-r 11 Name: HUC: O3DS 03.04 0 HUC: 7. If the dischar a is through a Municipal Separate Storm Sewer System (MS4),the name of the MS4 operator: 8. Estimated Project Start and Cpmpletion Date: Start Date(rnm/dd/yyyy): 10 18I I$ Completion Date (mm/dd/yyyy): (47113I ti! 9. Total Land Area of Development(to the nearest one-hundredth acre): 4,& Estimated Area to be Disturbed (to the nearest one-hundredth acre): oat 10. Is the area to be disturbed part of a larger common plan of development or/sale? Yes V No ❑ 11. A stormwater pollution prevention plan (SWPPP) must be prepared in accordance with the requirements of the General VPDES Permit for Discharges of Stormwater from. Construction Activities prior to submitting this Registration Statement. By signing this Registration Statement the operator is certifying that the SWPPP has been prepared. 12. Certification: I certify under penalty of law that I have read and understand this Registration Statement and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is to the best of rriy knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting false information including� the possibility of fine and imprisonment forlI ''knowing violations." VP � �JU���G� Printed Name: A V I Ul Ghn'' V. Gr Title: V IJ Signature: /' Date: . e1I5`18 (Please sign in INK. This Certification must be signed by the appropriate person associated with the operator identified in Item #1.) 07/2014 Page 1 of 1 • Instructions for Completing the Registration Statement General VPDES Permit for Discharges of StorrWater from Construction Activities (VAR10) GENERAL The entities that are considered operators will commonly consist of the owner or developer of a project (the party with control of project plans A.Coverage Under.this General Permit. and specifications) or the general contractor(the party with day to day operational control of the activities at the project site which are Any operator applying for coverage under this general permit who is necessary to ensure compliance with the general permit). required to submit a Registration Statement (see Section B below) must submit a complete Registration Statement to the Department. Provide the legal name(do not use a colloquial name),contact,mailing The Registration Statement serves as a Notice of Intent for coverage address; telephone number, and email address (if available) of the under the General VPDES Permit for Discharges of Stormwater from construction activity operator;general permit coverage will be issued to Construction Activities(VAR10). this operator. Indicate if the Department may transmit general permit correspondence electronically. B.Single-family Detached Residential Structures. Item 2:Existing General Permit Registration Number. Operators with an existing stormwater discharge or proposing a new stormwater discharge associated with the construction of a single- For reapplications only, provide the existing general permit registration family detached residential structure are not required to submit a number for the construction activity. This item does not.need to be Registration Statement or the Department of Environmental Quality completed for new construction activities applying for general permit ', (DEQ)portion of the general permit fee. coverage. Operators of these types of discharges are authorized to discharge Item 3: Name and Location of the Construction Activity under this general permit immediately upon the general permit's Information. effective date of July 1,2014'. Provide the official name, street address(if available),city or county(if C.To Apply for Permit Coverage. not located within a City)of the construction activity. Also, provide the latitude and longitude in decimal degrees of the approximate center of 1. New Construction Activities. Any operator proposing a the construction activity(e.g., N 37.5000,W 77.5000). stormwater discharge from construction activities_shall submit .a complete Registration Statement to the Department prior to the Name and Location of Off-site Support Activity Information. commencement of land disturbance, unless exempted by Section B above. Any operator proposing a new stormwater discharge from This general permit also authorizes stormwater discharges from construction activities in response to a public emergency where the support activities (e.g., concrete or asphalt batch plants, equipment related work requires immediate authorization -to avoid imminent staging yards, material storage areas, excavated material disposal endangerment to human health or the environment is immediately areas, borrow areas) located on-site or off-site provided that (i) the authorized to discharge under this general permit and must submit a. support activity is directly related to a construction activity that is complete Registration Statement to the Department no later than 30 required to have general permit coverage; (ii)the support activity is not days after commencing land disturbance; documentation to a commercial operation, nor does it serve multiple unrelated substantiate the occurrence of the public emergency must construction activities by different operators; (iii) the support activity accompany the Registration Statement. does not operate beyond the completion of the construction activity it supports; (iv) the support activity is identified in the registration 2. Existing Construction Activities. Any operator that was statement at the time of general permit coverage; (v) appropriate authorized to discharge under the general permit issued in 2009, control measures are identified in. a SWPPP and implemented to and who intends to continue coverage under this general permit, address the discharges from the support activity areas; and (vi) all shall submit a complete Registration Statement to the Department applicable state, federal, and local approvals are obtained for the on or before June 1,2014, unless exempted by Section B above. support activity. D.Where to Submit Registration Statements. Provide the official name,street address(if available), City and County (if not located within a City) of all off-site'support activities to be All Registration Statements should be-submitted to: covered under this general permit. Also, provide the latitude and longitude in decimal degrees of the approximate center of the off-site Department of Environmental Quality support activities (e.g., N 37.5000, W 77.5000). Also, if an off-site Office of Stormwater Management,10th Floor support activity is going to be covered under this general permit the P.O.Box 1105 total land area of the off-site support activity and the estimated area to Richmond,VA 23218 • be disturbed by the off-site support activity need to be included in Item #9. LINE-BY-LINE INSTRUCTIONS Item 4:Status of the Construction Activity. Item 1:Construction Activity Operator Information. Indicate the appropriate status (Federal, State, Public, or Private) of "Operator" means the owner or operator of any facility or activity the construction activity subject to the Stormwater Management Act and regulations. In the context of stormwater associated with a large or small construction Item 5: Nature of the Construction Activity. activity, operator means any person associated with a construction project that meets either of the following two criteria:(i)the person has Provide a brief description of the construction activity, such as direct operational control over construction plans and specifications, commercial, residential, agricultural, oil and gas, etc.This list is not all including the ability to make modifications to those plans, and inclusive. specifications or (ii) the person has day-to-day operational control of those activities at a project that are necessary to ensure compliance Item 6: Receiving Waters(s)and HUC Information. with a stormwater pollution prevention plan for the site or other state permit or VSMP authority permit conditions (i.e.,they are authorized to Provide the name of the receiving water(s)and corresponding HUC for direct workers at a site to carry out activities required by the all stormwater discharges including any stormwater discharges from stormwater pollution prevention plan or comply with other permit off-site support activities to be covered under this general permit. conditions) Hydrologic Unit Code or HUC is a watershed-unit established in the most recent version of Virginia's 6`h order national watershed boundary dataset. 07/2014 Page 1 of 2 assigned or delegated to the manager in accordance with Item 7: MS4 information. corporate procedures. If stormwater is discharged through a municipal separate storm sewer b. For a partnership or sole proprietorship by a general partner or system(MS4), provide the name of the MS4 operator The name of the the proprietor, respectively. MS4 operator,is generally the Town, City, County,institute or Federal facility where the construction activity is located. c. For a municipality,state, federal, or other public agency: by either a principal executive officer or ranking:elected official. For purposes Item 8: Construction Activity Start and Completion Date of this part,a principal executive officer of a public agency includes: Information. (i)The chief executive officer of the agency,or Provide the estimated start date (month/day/year) of the construction activity. Provide the estimated completion date (month/day/year) of (ii)A senior executive officer having responsibility for the overall the construction activity. operations of a principal geographic unit of the agency. Item 9:Construction Activity Area Information. Provide the total area (to the nearest one-hundredth :acre) of the development (i.e.., the total acreage of the larger common plan of development or sale). Include the total acreage of any off-site support activity to be covered under this general permit. Provide the estimated area (to the nearest one-hundredth acre) to be. disturbed by the construction activity. Include the estimated area of land disturbance that will occur at any off-site support activity to be covered under this general permit. Item 10: Common Plan of Development or Sale Information. Indicate if the area to be disturbed by the construction activity is part of a larger common plan of development or sale. Larger common plan of development or sale is defined as a contiguous area where separate and distinct construction may.be taking place-at different times on. different schedules. Plan is broadly defined as any announcement or documentation, including a sign, public notice or hearing, sales.pitch, advertisement, drawing, permit application, zoning request, etc., or physical demarcation such as boundary signs, lot stakes, or surveyor markings indicating that,construction activities may occur. Item 11:Stormwater Pollution Prevention Plan(SWPPP). A Stormwater Pollution Prevention Plan(SWPPP)must be prepared in accordance with the requirements of the General VPDES Permit for Discharges of Stormwater from Construction Activities(VAR10)prior to submitting this Registration Statement. By signing this Registration , Statement the operator is certifying that the SWPPP has been prepared. Item 12:Certification. A properly authorized individual associated with the operatoridentified • in Item 1 of the Registration'Statement is responsible for certifying-and signing the Registration Statement. Please sign the Registration- Statement in INK. State statutes provide for severe penalties for submitting- false information on the Registration Statement. State regulations require that the Registration Statement be signed as follows: a. For a corporation: by a responsible corporate officer. For the purpose of this part,a responsible corporate officer means: (i) A president, secretary, treasurer, or vice-president of the• corporation in charge of a principal business function, or any other person who performs similar policy-making or decision-making functions for the corporation,or (ii) the manager of one or more manufacturing, production, or operating facilities, provided the manager is authorized to make management decisions that govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long-term compliance with environmental.laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather complete and •accurate information for permit application requirements; and where authority to sign documents has been • 07/2014 Page 2 of 2 Section 2 Notice of gef eral permit coverage (This notice is to be.posted near the main entrance according to 9VAC25-880-70, Part II, section C.) (Provide a copy of the DEQ coverage letter when obtained) • Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP)Albemarle County • Section 3 Natug c of activity (Provide a detailed,narrative of the construction activities. Include or reference a construction schedule and sequence. Include any phasing.) - ConS--huc)k of) of 43 ocliackDA 0 -L homes ptod n®-! • r r-e�-5- 0 ny,A. W-i* (cam 7- ID Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP)Albemarle County Section 4. Erosion and Sediment Control Plano (Provide a reduced, 11x17 copy of the latest Erosion and Sediment Control Plan. Do not reference only.) • Issued— 10/2014 Storm-Water Pollution Prevention Plan(SWPPP) Albemarle County Section 5. Stormwater Management Plan (Provide a reduced 1 lx17 copy of the latest stormwater management plan. Do not reference only.) Issued— 10/2014 Stoiiiiwater Pollution Prevention Plan(SWPPP)Albemarle County Section 6. Pollution Prevention Plan. (reference County Code 17-404 and'State Regulation 9VAC25-880-70 part II section A.4) A. Plan showing pollution activities and prevention practices (Provide a reduced 11x17 copy of a site plan on which all of the following activity locations are clearly marked. Keep this plan up-to-date with ongoing site changes.and inspections.) • • Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP)Albemarle County B. Sources of tbollutaritsy location&and prevention practices Pollutant,or Pollutant Prevention Practices, Generating Activity li�oealioen on site Control Measures Fuel,gas,oil,coolant Not to be stored on site Not to be stored on site, clean any s Concrete Concrete wash out wash out,dispose when dry Paint Garages I Wash in washout cleaning materials I garages I Wash in washout Asphalt JOnly.usedto pave J use leftovers for curbs Termite spray I Sprayed around foundation I per code Drywall compound Garages Let dry and dispose of block mortar within silt fencing Cure before disposing of Tile grout I inside clean in washout I 1 • • I C. Sources of Pollutants, continued. Common activities and minimum control and prevention ractices Pollutant,or Pollutant Prevention Practices, Generating Activity Location on Site Control Measures Follow Erosion and Sediment Control CIearing,grading,excavating,and un- Plan.Dispose of clearing debris at stabilized areas Land disturbance area acceptable disposal sites.Seed and mulch, or sod within 7 days of land clearing Cover storm drain inlets and use drip Paving operations Roads and driveways pans and absorbent/oil dry for ailpaving machines to limit leaks and spills Direct concrete wash water into a leak- Concrete washout Current location and detail shown proof container or leak-proof settling and cement waste on plan basin that is designed so that no overflows can occur Enclose or cover material storage areas. Mix paint indoors in a containment area or Structure construction,stucco, in a flat unpaved area.Prevent the painting,and cleaning Structures discharge of soaps,.solvents,detergents and wash water,paint form release oils and curing compounds. Water shall be filtered,settled or similarly Dewatering operations Dewatering sites shown on plan treated prior to discharge as shown on plan Designated areas for material delivery Material delivery and storage Designated area shown on plan and storage.Placed near construction entrances,away from waterways and drainage paths - Material use duringbuilding process Building areas Follow manufacturer's instructions .MSDS's attached. waste collection area will not receive a substantial amount of runoff from upland Solid waste disposal Current designated container areas areas and does not drain directly to a on plan waterway.Containers have lids covered before periods of rain,or are in a covered area Scheduled collection to prevent Issued— 10/2014 Stormwater Pollution Prevention Plan.(SWPPP)Albemarle County Pollutant,or Pollutant Prevention Practices, Generating Activity Location on site Control Measures overfilling.MATERIALS NOT TO BE BURIED ON-SITE Convenient and well-maintained portable sanitary facilities will be Sanitary waste Current locations shown on plan provided,and located away from waterways or inlets.Such facilities shall be regularly maintained. Apply fertilizers in accordance with Landscaping operations Landscape areas shown on plan manufacturer's recommendations and not during rainfall events To be treated in a sediment basin or better control as specified on plan. Wash Waters Wash areas shown on plan Minimize the discharge of pollutants from equipment and vehicle washing Designated areas and details shown on Provide containment and filtering for all Vehicle and equipment washing plan wash waters per the plan Minimization of exposure to precipitation and stormwater.Minimize the exposure of building materials,building products, construction wastes,trash, landscape materials,fertilizers,pesticides,herbicides,detergents, sanitary waste, and other materials present on the site to precipitation and to stormwater. (Identify all non-stormwater discharges to occur on your site. Keep this plan up-to-date with ongoing site changes and inspections. See CUP,.9VAC25-880-70 section E for examples of non-stormwater discharges.) -- D. Non-stormwater discharges Discharge Pollutants or Pollutant Location on Site Constituents Sarin- be aila . Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP)Albemarle County E. Persons.responsible for pollution prevention practices (Provide the names and contact information for all persons responsible for prevention practices as listed above.) -3012. Vo l (303) aga a 44AS joe. kosbar4ie Cl buildars.�r j. (434)a4a-®3Lo4 W➢ [ yarn d crct Q .c r�, Vv � P. Response and reporting practices Minimize discharges from spills and leaks. Minimize the discharge of pollutants from spills and leaks and implement chemical spill and leak prevention and response procedures as follows. Respond to all spills,leaks and discharges as follows; Report all spills, leaks and discharges as follows; (Provide detailed response and reporting practices according to 9VAC25-880-70, Part TI, section A.4.e.) aS dk G. Pollution Prevention Awareness (Describe training and procedures to provide awareness,and compliance for all measures in this document; waste management, wash waters;prevention measures, etc.) Au ;Hildh j&I ate: 3' Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albernarle County F. Response and reporting practices Most spills can be cleaned up following manufacturer specifications. Absorbent/oil dry, sealable :containers, plastic bags, and shovels/brooms are suggested minimum spill response items that should be available at this location. 1'Priority: Protect all people 2nd Priority: Protect equipment and property 3rd Priority: Protect the.environment 1. Check for hazards (flammable material, noxious fumes, cause of spill) — if flammable liquid, turn off engines and nearby electrical equipment. If serious hazards are present, leave the area and call 911. LARGE SPILLS ARE LIKELY TO PRESENT A HAZARD. 2. Make sure the spill area is safe to enter and that it does not pose an immediate threat to health or safety of any person. 3. Stop the spill source. 4. Call co-workers and supervisor for assistance and to make them aware of the spill and potential dangers. 5. If possible, stop spill from-entering drains(use absorbent or other material as necessary). 6. Stop spill from spreading (use absorbent or other material). 7. If spilled material has entered a storm sewer; contact locality's storm water department. 8. Clean up spilled material according to manufacturer specifications; for -liquid spills, use absorbent materials and do not flush area with water. 9. Properly dispose of cleaning.materials and used absorbent material according to manufacturer specifications. Emergency Contacts: Normal Working Hours DEQ Valley Regional Office 540-574-7800 Nights, Holidays &Weekends VA Dept. of Emergency Management 804-674-2400 G. Polution Prevention Awareness All Project Managers for our company are trained to comply with standard SWPPP procedures. This includes the following: • Tarping and un-tarping dumpsters • Removal and disposal of concrete washouts • Location of toilets and dumpsters • Silt fence requirements • Removal and disposal of any spilled pollutants • Daily and weekly reporting practices Section 7. Discharges to impaired waters, surface waters within an applicable TIVIDL wasteload allocation, and exceptional waters. (Provide detailed measures for any applicable TMDL) Ni Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County Section 8 Qualified. personnel The following personnel are responsible for inspections; (Provide the name, telephone number,.and qualifications of the qualified personnel conducting inspections.) Sh S J (75 Olejea nailer i i .10, D. (434)aLW- a VP 0-C GDrs+iur=hQ • Issued— 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 9 Signed. Certification (Provide certification according to 9VAC25-870-370) CERTIFICATION "I certify under penalty of law that this document and all attachments we're prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted.Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." • Operator Name: WI!Ai i' D. Cr. a.- Company: Groj ICI d i S Title: Y P D- Co-fl Uu.C..-,-1Or Signature: � /i, Date: Ob S 116 • Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP)Albemarle County Section 10. Delegation of authority. (Provide the persons or positions with authority to sign inspection reports or to modify the stormwater pollution prevention plan. A formal,.signed.delegation of authority is needed.) Delegation of Authority I, V V II,Ila m I D. (name),hereby designate the person or specifically described position below to be a duly authorized representative;fiio,rrthe p ose of overseeing compliance with environmental requirements,including the Construction General Permit, at the(Q I f itil VI i I , lock. + , I05 I-. 3 construction site. The designee is authorized to sign any reports,stormwater pollution prevention 15 ans and all other documents required by the permit. VUCS (name of person or position) (company) Cratl (address) . R 1 . �Q (city,state,zip) chariokesvl ilk,U.. (phone) (io3') aZa-44�5 By signing this aut iorizat on,I confirm that I meet the requirements to make such a designation as set forth in the Construction General Permit(CGP), and that the designee:above meets the definition of a"duly authorized representative'. Operator Name: V V i 1/L i dry, ). Chaij Company: C •BLu I s Title: VP a S `01--)Q,m • Signature:- k/i a . Date: Si iS I l 6 Issued— 10/2014 Stormwater Pollution.Prevention Plan(SWPPP)Albemarle County Section 11. General permit copy (Provide a copy of the construction general permit, 9VAC25-880) Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP)Albemarle County Section 12. Inspection logs (Provide templates for your inspections. Requirements are listed in 9VAC25-880-70, Part II, section B and F.) ) 14- 0147106-d Ahan—qablaLLYitf • Issued— 10/2014 Stounwater Pollution Prevention Plan (SWPPP) Albemarle County Community Job Date Report