Loading...
HomeMy WebLinkAboutARB201300175 Application ..a Albemarle Cc i y Community Development Department 401 IOR!'lltire Road Charlottesville,VA 22902-4596 tea. Planning Application Voice:(434)296-5832 Fax:(434)972-4126 I PARCEL/ OWNER INFORMATION TMP 04500-00-00-10080 Owner(s): Application # ARB201300175 KSR INVESTMENTS LLC PROPERTY INFORMATION Legal Description ACREAGE Magisterial Dist. Rio Land Use Primary Commercial Current AFD Not in A/F District Current Zoning Primary Cl Commercial APPLICATION INFORMATION Street Address 660 RIO RD W CHARLOTTESVILLE, 22901 Entered By Todd Shifflett Application Type Architectural Review Board 12/03/2013 Project Cole's Import Specialist- Final Received Date 12/02/13 Received Date Final Submittal Date 12/09/13 Total Fees 1000 Closing File Date Submittal Date Final Total Paid 1000 Revision Number Comments Legal Ad SUB APPLICATION(s) Type I Sub Applicati I Comment Final Site:Develo ment Plan APPLICANT/ CONTACT INFORMATION ContactType I Name I Address CityState Zi Phone PhoneCell I owner/ApplicantyKSR INVESTMEN.TS.LLC: s943.GLENWOOD;STATION:tN:'i:t~HARL>?TlESV1L.,-22,901;::!. Primary Contact KATURAH ROELL 2811 HYDRAULIC RD. CHARLOTTESVILL 422901 4349062702 Signature of Contractor or Authorized Agent Date Architectural I "eview Board Application" 'A 41.70,,� Part A: Applicant,Contact and Parcel Information Project Name: 'ie 1AUto Ic,e/oz i r /Cate/9 I r,•►)c tit S/a e c-ia I i5 L5 Tax map and parcel(s): • /00 Physical Street Address: 6600 Rio.kOctd 140 51- Contact Person: Be atLA''a 1'1 IRd�C I Business Name: t alolOvit t-eveI cio 7. . vo Address Z81 I 1-4 06-0, Iic -Rd- City G}av Iafi SV<« State VA ` Zip 2270) Daytime Phone(9th) `l6 C' 270 Z Fax#l J) 973 ?7B4 E-mail KroQI Ik pp 3-!h c.17et. a1 5o cep?, ahcli i{a.4t: flab 1648er-son AIA ; ef3-) I7i -2457, bob( 1, krti irv. C4 Owner of Record: E. Ra N d a I 1 IRA 15t0)1 Address �3 aIghw000I 51a*i0'l Lam Q. City C.kat 1 tesVt)IL- State VA Zip 2298) Sui1_G iol Daytime Phone(431) 417-/040 Fax#(431) 22.0 -42399 E-mail ra>1dyet'a.IStnp •cc*-1 Part B: Review Type and Fee Select revi,w type V Review by the Architectural Review Board Conceptual Plan/Advisory Review(for a Special Use Permit or a Rezoning) No Fee Preliminary Review of a Site Development Plan No Fee ✓ Final Review of a Site Development Plan $1000.00 Amendment to an approved Certificate of Appropriateness $225.00 Building Permit Review $590.00 County-wide Certificate of Appropriateness Structures 750' or more from the EC,no taller than 5 stories No Fee Structures located behind a structure that fronts the EC No Fee Personal wireless service facilities No Fee Fencing or Equipment or Lighting No Fee Additions to ARB-approved buildings No Fee Minor amendments to site or architectural plans No Fee Building permits where the change is 50%or less of the altered elevation No Fee NOTE: For SIGNS, use the combined APPLICATION AND CHEKLIST FOR SIGNS. FOR OFFICE USE ONLY BP#_ ARM Fee Amount$ ( OW Date Paid 2.-2 a 3 By who?,..,' / s t# ) Check#"1 � By WK( County of Albemarle Dept of Community Development,401 Mclntire Rd,Charlottesville,VA 22902 Voice:(434)296-5832 Fax:(434)972-4126 11/2010 Page 1 of 2 OVER—. Part C: Description of Proposal Describe your proposal.Attach a separate sheet if necessary. Sew ct lee )11 42 ot Part D: Applicant Agreement Applicant must read and sign • Each application package must contain(8)folded copies of all plans and documents being submitted. Only (1)set of building material samples is required. All submittal items, including building material samples, become the property of Albemarle County. Applicants are encouraged to maintain duplicate copies of all submittal items in their own files. • Only complete application packages will be scheduled for ARB review. The application package is not complete without the appropriate checklist, completed, signed, and included with the required submittal materials indicated on the checklist. I hereby certify that I own the subject property or have the legal power to act on behalf of the owner in filing this application. *See submittal requirements below. I also certify that the information provided on this application and accompanying information is accurate,true, and correct to the best of my knowledge, and that the attached plans contain all information required by the appropriate checklist. 1411 ov. a7 20 r 3 1 ignature of owner,owner's representative Date or contract purchaser 11:)bQd- 'b. An ■65 Dv,/ A IA (43.1) 9'96, . 21's 7 Printed name,Title aXd DlU7tter3 12¢itres {c4itea- Daytime phone number of Signatory *Ownership Information: • If ownership of the property is in the name of any type of legal entity or organization including, but not limited to, the name of a corporation, partnership or association, or in the name of a trust, or in a fictitious name, a document acceptable to the County must be submitted certifying that the person signing above has the authority to do so. • If the applicant is a contract purchaser, a document acceptable to the County must be submitted containing the owner's written consent to the application. • If the applicant is the agent of the owner, a document acceptable to the County must be submitted that is evidence of the existence and scope of the agency. Attach the owner's written consent. 11/2010 Page 2of2 OVER— low ,Attra, *wow* LITTLE RHINO STUDIO PC architecture ARCHITECTURAL REVIEW BOARD SUBMITTAL FOR RIO AUTO REPAIR — November 27, 2013 WRITTEN DESCRIPTION The proposed building is to be located on an empty lot which is directly across Rio Road from the Daily Progress building. The site is in a commercial development corridor. The lots to each side contain old, run-down residential structures which will most likely be replaced with commercial structures in the near future. Although the building is a simple utilitarian structure, it is the owner's intent to design it using natural earth-tone colors that will set the direction for subsequent commercial projects that are developed in the immediate neighborhood. The proposed building is a simple, single-use structure that will be used as an automobile maintenance and repair facility. It is to be square in plan at 50 ft. x 50 ft. for a total gross area of 2,500 sq. ft. A 14 ft. x 12 ft. office will be located in the front-center of the building, there will be a single handicap accessible toilet room adjacent to the office and the rest of the building will be open auto maintenance space. The office area is accessed on-grade at the front of the building and the maintenance area floor is 5'-4" lower with one ten ft x ten ft roll-up door located in the center of the left side façade. . The building structure will be a pre-manufactured metal building system with a 3 to 12 pitched gable shape roof. Exterior materials will include a brick base with a rowlock water table at 30" above the slab across the front/street facade. The base will wrap around the sides then drop down to the lower grade just before the maintenance area roll-up door. Standard insulated metal building panels similar to the Butler Building Rib Wall II system will run from the top of the brick to the roof fascia. The Roof will be metal standing seam with a metal fascia trim, gutter and downspouts. The building height will be 11 ft from top of the floor slab to underside of the roof fascia and gutter system at the street entrance with a total height of 18'-5 1/2" to the top of roof ridge at that point. The total height to roof ridge at the roll-up door on the left façade will be 23'-9 12". The street side (front) elevation will have an 8 ft high store front glazing system with door that will provide access and light to the office. The front elevation will also have two windows flanking each side of the entrance. Each of the gabled ends or side elevations will also have two similar windows to provide light and ventilation to the maintenance area. Additional windows and a door will also be located on the rear façade which will not be visible from the street. Post Office Box 2257, Charlottesville, Virginia • • (434) 996-2457 • • littlerhino.com *NNW Neale The brick base will be constructed using Old Virginia Brick, Albemarle Dominion series brick with a C-208 mortar, both of which are commonly used in the area. Other material colors include a tan siding, medium bronze fascia, and classic bronze roof, all of which have a natural color appearance. A sign location and size is shown on the front elevation, but it is intended that the sign contractor make a separate application and presentation where the final size, color, and additional detailing will be provided. One light fixture is shown over the top of the roll-up door. The civil engineer's site plan will show any additional site light fixtures, as well as landscape features. The civil engineer will also provide illumination data as required by the County. i'agsAndlabels- Print http,J/ti r eli stir in*"Pag--'I Pri youit? 1=-tear&Niri... !y �y� fsc � x � t One Light Bronze Wall Lantern Item Number 72212-6 1 58 Dimensions 10.50"Tall x 11.00"Wide Vendor Minka-Lavery Sockets 1 Medium Bulb 100 watts Price $89 90 Description This One Light Wall Lantern has a Bronze Finish and is part of the Bay Crest Collection, 1 of l 9/-5/2O 13 3:1 i PM e= Architectural Review Board Yom . ` -' Final Review of a Site Development Plan „.1,2„,,,,,, Submittal Requirements Checklist Part A:Applicant,Contact and Parcel Information i Project Name: ( i. r e q./vk FtJs.,-4- ej C. i 1.\ )51- ' 12 e 26I LI, Tax ma and parcel(s): �I I Q6 66 ,- cs-F map Physical street address: Contact Person: 12-41/4- aft L�-O Business Name: �� ( /►�t�'Y1 �l ° (�I Address 20 i 1�1 O (C 1(I C.- k ` City C Nft( r f:t'4tate v A Zi P Z 0 Daytime Phone eCO.27W _ Fax#( ) E-mail cL )( €.?Cb--inc AL-4- Part B:Submittal Requirements Important:Submittal packages must contain 8 collated copies of all information unless otherwise indicated. A. V1yritten description of the proposal 2 Provide a description of the proposal. Identify changes from the preliminary submittal. Indicate specifically how each ARB comment from the preliminary review has been addressed. If there are no changes proposed,then explain why. [`Explain how the proposal is compatible with the surrounding area and the Entrance Corridor. B. S'te plan showing the following (drawn to the scale of 1"=20',clearly legible and folded): izi cation(s)of proposed building(s)on the site. t2” L ation of proposed parking,travelways, walkways and other improvements. Mechanical equipment, trash containers, loading and service areas, other similar features and i provements, and associated screening. [ Existing and proposed topography drawn with contour intervals of 5-feet or less, and with sufficient off-site topography to describe prominent and pertinent off-site features and physical characteristics, _ ,/but in no case less than 50-feet outside of the site. Imo'Location and size of existing and proposed utilities and easements. Identify type of utility and extent easement. OW ormwater management plan. Location of retaining walls indicating top and bottom elevations, maximum wall height, and proposed materials,with s. Sheet number,total number of sheets,date of the drawing, date and description of the latest revision, and contact information for the firm preparing the drawings in the title block on all drawings. For revised drawings,clearly identify revisions made. i OVER-* C. Landscape plan showing the following(drawn to the scale of 1"=20'or larger,clearly legible and folded): ((_/"j/P oposed landscaping that meets or exceeds the requirements outlined in the ARB guidelines. Iv/ isting landscaping to be removed. Include the location, size, and species. Landscape key including all landscape symbols and a description of what they represent. g'L ation of existing and proposed tree lines and tree save areas. ^�, Location of existing natural features. IS:Location of individual trees of 6-inch caliper or greater and all significant groups of trees indicated by botanical name and caliper. Location and height of above-ground utilities and associated easements, and location of below- ound utilities and associated easements. uyormwater facilities. ❑ Provide a signed,tree conservation checklist with all checklist items drawn on the landscape plans. ❑ Include tree protection fencing and limits of work on the landscape,grading and E&S plans. D. Li ting plan showing the following(drawn to the scale of 1"=20'or larger,clearly legible and folded): L9 cation of all proposed building and site lighting. Lii hting schedule identifying all proposed light fixtures, poles and brackets. l(J�Vlanufacturer's cut sheets illustrating proposed lighting fixtures and information on illumination type, intensity, style, shielding, color,finish, and installation height. E 1Photometric plan addressing all fixtures and indicating that lighting does meet the requirements of Section 4.17 of the Zoning Ordinance. /Coordination of lighting with landscaping and other site elements. E. Appearance of the building(s) (architectural elevations,color perspective sketches,site sections): Dimensioned architectural elevations of the proposed building(s). Elevations must be drawn to the scale of 1/8"=l'-0". Include a building materials schedule and key on the elevation drawings. Submittal of elevations that are not visible from the Entrance Corridor may be required to clarify the o rall building design. Cglor perspective sketches that show the proposed development as seen from the Entrance Corridor. �Siite sections that clarify proposed changes in topography and illustrate the visibility of the proposed development from the Entrance Corridor. Site sections shall indicate the finish floor elevation(s) and r height(s)relative to the natural elevations along the Entrance Corridor. O set of all building materials/colors. A floor plan adequate to show exterior walls,windows and doors. F. Additional material El Provide labeled, color, 8-%" x 11" photographs of the site as seen from both directions on the Entrance Corridor. ❑ Any additional material that is necessary to address comments made by the ARB at the preliminary review with a memo itemizing how each of the preliminary comments have been addressed. ❑ The applicant is welcome to submit any additional material that will make the final site development review more productive. Drawings or other submittal items that clarify topography, visibility, utilities, landscaping, or other unique or unusual conditions are welcome. 2 OVER--. Part C: Applicant Agreement Applicant must read and sign • Each application package must contain (8) folded copies of all plans and documents being submitted. Only (1) set of building material samples is required. All submittal items, including building material samples, become the property of Albemarle County. Applicants are encouraged to maintain duplicate copies of all submittal items in their own files. • All information in this checklist is required, unless specifically waived by the ARB, prior to processing a final site development plan review by the ARB. Additional submittal materials may be required, depending on the proposal. • Only complete application packages will be scheduled for ARB review. The application package is not complete without this checklist, completed, signed, and included with the required submittal materials indicated on the checklist. In representing the above referenced firm submitting this application for review, I hereby state that the information provided in this application, and all accompanying information, is accurate, true and correct to the best of my knowledge, and that the attached plans contain all information required by this checklist. Signature of person completing check ist Date L. RC-5-e Cy 64 % cc - D 2- Printed Name/Title Daytime phone number of Signatory County of Albemarle Department of Planning and Community Development 401 McIntire Road, Charlottesville,VA 22902-4596 (434)296-5832 Tel, (434)972-4126 Fax www.albemarle.orq 3 OVER--.