Project: Rolling Meadows
Plan preparer: Dustin Greene, DDR [fax 979 -1681]
Owner or rep.: Victor Pascarella [PO Box 400 Ivy, VA 22945]
Plan received date: 10 Apr 2007
Date of comments: 1 May 2007
Reviewer: Jonathan Sharp
A. Road and drainage plans (SUB200700133)
1. Please provide pavement computations.
2. Please provide Albemarle County general construction notes on the plans, verbatim.
[DSM CD -19]
3. Please provide the location of street signs on the plans. [14 -423]
4. Shoulders should maintain a slope of 1 ":1' or flatter. [DSM908]
5. Rural intersections should provide a 20' continuance of grade at -2 %. [DSM908]
6. Please provide ditch computations. [DSM909.1A]
7. Please specify end sections and scour protection on the plans. [DSM909]
8. It appears that the culvert may be undersized. The drainage area going to the culvert may
be greater than shown. The headwater must be 1.5 feet below the shoulder for the 10 year
storm and below the roadway for the 25 year storm. Engineering recommends using RCP
instead of CMP.
9. Please show that the 18 inch pipe running across Rte 250 will remain adequate.
10. A road bond amount will be computed once the plans are approved.
B. Stormwater Management Plan (WP0200700020)
1. Engineering recommends platting 50 feet of additional stream buffer along the tributary of
Stockton Creek to provide water quality for Lots 2 -4 of the site. Plantings should be
provided in non - wooded areas of additional platted stream buffer. This will achieve the
needed 30% removal rate in this area making BMPs 2 and 3 will no longer be necessary.
If done, Engineering will exempt stormwater detention for Lots 2 -4 per Section 17 -314G
of the County Code.
2. The area draining to BMP1 requires a removal rate of 50 %, and should be sized to 2.5%
of the impervious area draining to it. (Removal rate calculations are attached.) Please
provide the sizing calculations. Also, detention needs to be provided with BMP1. Please
provide detention calculations. Attached is a detail for combined biofilters and detention
structures. This can be found on the web at:
httD:// www.albemarle.orL-/uDload/imaL-es /forms center /departments /communitv developm
ent/forms /design standards manual/ACDSM Engineerina biofilter basin.ipg
3. The inspection and maintenance access roads cannot be located on critical slopes. The
maximum slope of a grass access road is 10 %. Slopes exceeding 10% must be gravel.
Access roads cannot exceed a slope of 20 %. [DSM909.2A, 503.1D]
4. The biofilter should specify schedule 40 pvc or equivalent and provide cleanouts for the
underdrains. [DSM503.1F]
Engineering Review Comments
Page 2 of 5
5. The biofilter mix should specify "Luck Bio- Filter Mix or an approved equivalent."
[DSM503.1F]
6. The following note should be added to the plans in regards to the installation of biofilters:
"Contractor shall contact the water resources inspector 24 hours prior to backfilling the
biofilter and request an inspection and approval of the underdrain and the soil mix."
[DSM503.1F]
7. Please provide dimensions of the bottom length and width of biofilters on the plans to help
ensure proper installation.
8. The scale is incorrect on Sheet 4 of the stormwater plans.
9. The drainage area running to BMP1 is incorrect.
10. Please show easements located around all stormwater facilities. [DSM909.2B(2),
503.1 0,1101 ]
11. A stormwater bond will be computed once the plans have been approved.
C. Erosion Control Plan (WPO200700020)
1. Check dams are not adequate sediment trapping measures, as they are only to be used for
velocity control. A sediment trap may be necessary on the uphill side of the road entrance
to capture runoff. The culvert inlet protection on the downhill side of the road entrance
may be adequate depending on the drainage area running to the culvert. Please provide the
drainage area going to the existing culvert. [VESCH 3.08, 3.13, 3.20]
2. The check dam details do not match the plans. The details show a 3' ditch depth, where as
the ditches shown as not 3' deep. Also, the maximum spacing of check dams should be
such that the toe of the upstream check dam is the same elevation of the top of the
downstream dam. [VESCH 3.20]
3. The limits of clearing /grading extend into critical slopes.
4. Please provide copies of the construction easements for TMP 56 -105 and 56 -104. Please
show the easement locations on the E &S plans.
5. Elevation 650 is incorrectly labeled as 660.
6. Please coordinate all of the plans to reflect the same elevations and benchmark.
7. Please provide a detail of a paved construction entrance, not a gravel construction
entrance. Attached is a copy of this detail from the Design Standards Manual.
8. Please provide details of culvert inlet protection and outlet protection.
9. Please specify more clearly the types of seeding to be used for temporary and permanment
stabilization. [VESCH ch 6 pgs 13 -14]
10. Please provide existing vegetation and existing drainage patterns. [VESCH ch 6 pgs 13-
14]
11. Please describe stormwater runoff considerations in the narrative. [VESCH ch 6 pgs 13-
14]
12. Please provide the apron length and width for the outlet protection. Please specify the
minimum diameter riprap necessary. [VESCH 3.18]
13. Please show that MS -19 is met for runoff draining downstream of the entrance.
14. An E &S bond will be computed once the plans are approved.
If you have any questions, please contact me at my email jshaM @albemarle.org, or by phone (434)
296 -5832 ext. 3025.
ilx
910-FILTER
M IX OR TESTEDAN❑
APPROVED EQUIVALENT
V -0"
{MINT
if{ OUTLET
PROTECTION
J � � PROTECTION
�.I . L
ti
I
I
I
VNDERDRAIN GRAVEL
(AASHTO x+143,
CLl:AN�UT
W/WATERTIGHT
CAP MP)
4"-6" PERFORATED
SCHEDULE 44 PVC PIPE
OR EQUIVALENT @ 1%
5LOPE (MIN) TO
DI OR STORM DRAIN
PROVIDE ACROSS ENTIRE
WIDTH @ 26 ft O.C.
CROSS SECTION
Engineering Review Comments
Page 3 of 5
TRASH
RACK
2' FREE BOARD OR
1' W /EMERGENCY
SPILLWAY
4 " -6" NON- PERFORATED
PVC PIPE @ 1%
SLOPE (P41N)
4" DEEP PEAGRAVEL
FILTER LAYER
NOTES:
1. THE NEED FOR ADDITIONAL PERMANENT EROSION PROTECTION FROM EDGE OF PAVEMENTTO
BOTTOM OF BIORETENTON AREA MUST HE EVALUATED ON AN INDIVIDUAL PROJECT BASIS.
Z, PROVIDE 1' -D" PONDING DEPTH TO THE CREST OF AN OVERFLOW STRUCTURE.
3, THE DISTANCE BETWEEN CLEAN -OUTS WILL NOT EXCEED 50 FEET,
BIO- FILTER COMBINED WITH
DETENTION BASIN
NO SCALE
Engineering Review Comments
Page 4 of 5
STONE 70' MIN- _
CON STRUC -IO N
ACCESS 3" SM -2A ASPHALT
COURSE
2%
EXI5T1 ING
PAVEMENT
_IF>" MIN, 21A AQQRLFGAIE
HAS=
PROI ILL
STQNF MIN -
CONSTRUC -IO'l ASPHALT PAVED
ACCESS WA'4 -RACK
F_
2%
PAVEMENT
FEASTING
DRAINIAGE
_ TO
TO SEaIG
"MUST EXTEND =•JL- WIDTH � TRAPPING DEVICE
D
OF INGRESS AND EGRESS
OPERATION
PLAN
- 12 Y `
POSITIVE DRAINAGE
TO SEDIMENT
TRAPPING DEVICE
FILTER CLOTH
SECTION A —A
UOL
A MINIMUM WATER TAP OF 2" IS REQUIRED WITH A IMINIMUM WASH
HOSE DIA. OF 1.5"
PAVED WASH H RACK
W III
pc ¢a�.['"1rx awrr vi v •ax w t'+k . f,t vac rm uw grx.�rs i
�ff.wee M i4i
Engineering Review Comments
Page 5 of 5
Rolling Meadows BMP removal requirements
DA #1
13 acres
Ipre. 0%
Roadway: 780 ft * 8 ft
Structures: 2000 sq ft * 3
Driveways: 350 ft * 10 ft
Total: 0.36 acres
Ipost: 2.7%
Removal Rate: 30%
DA #2
3.5 acres
Ipre. 0%
Roadway: 780 ft * 8 ft
Structures: 2000 sq ft * 1
Driveways: 100 ft * 10 ft
Total: 0.21 acres
Ipost: 6.1%
Removal Rate: 50%
Rolling Meadows DA #1
drainage area; A = 12.9 acres
impervious area fraction before; Ipre = 0.00 (min. 20% in develpment
area)
impervious area fraction after; Ipost = 0.027
water quality volume; A *Ipost *(0.5/12) *(43560/27) _
_23.41 cy
pollutant concentration; C = 0.35 (0.35 resevoir cashed, 0.4
rural, 0.7 dev area)
pollutant export before; Lpre = 8.77 *(0.05 +0.9 *Ipre) *C *A
pollutant export after; Lpost = 8.77 *(0.05 +0.9 *Ipost) *C *A
f = 1.0 (see DM p. 5 -39; for dev
area where Ipre > 20% use 0.9)
REMOVAL REQUIREMENT; (Lpost -f *Lpre) *100 /Lpost = _32.7
Rolling Meadows DA #2
drainage area; A = 3.5 acres
impervious area fraction before; Ipre = 0.00 (min. 20% in develpment
area)
impervious area fraction after; Ipost = 0.061
water quality volume; A *Ipost *(0.5/12) *(43560/27) _
_14.35 cy
pollutant concentration; C = 0.35 (0.35 resevoir cashed, 0.4
rural, 0.7 dev area)
pollutant export before; Lpre = 8.77 *(0.05 +0.9 *Ipre) *C *A
pollutant export after; Lpost = 8.77 *(0.05 +0.9 *Ipost) *C *A
f = 1.0 (see DM p. 5 -39; for dev
area where Ipre > 20% use 0.9)
REMOVAL REQUIREMENT; (Lpost -f *Lpre) *100 /Lpost = _52.3