HomeMy WebLinkAboutSDP200600041 Review Comments Final Site Plan and Comps. 2009-02-05January 5, 2009
The Engineering Groupe, Inc.
Attn: Mr. Michael Myers, P.E.
2148 Berkmar Drive
Charlottesville, Virginia 22901
Re: Briarwood Phases 1 A -1, 1 B -1 & 8
Dear Mr. Myers,
We have reviewed the plans entitled "Site
1, 1 B -1 and 8" dated April 21, 2006, last revised
following comments need to be addressed:
Plan for Briarwood Phases 1 A-
December 12, 2008. The
Sheet 18
1. Eliminate the sanitary sewer laterals on the west side of Sunset Drive.
These laterals can be installed with saddles once the lot lines have been
established.
Sheet 19
1. Eliminate sanitary sewer laterals until lot lines have been established.
Sheet 20
1. Eliminate sanitary sewer laterals until lot lines have been established.
Sheet 20A
1. Eliminate sanitary sewer laterals until lot lines have been established.
Sheet 33
1. According to our records, you should not have to cross the existing water
main upstream of the existing manhole. If you actually have to cross it, a
relocation of the existing water main may be required to achieve
acceptable separation between water and sewer.
2. The ACSA is concerned about the excessive depths of the sewer main
shown on this sheet. The sewer should be raised to provide gravity
service to the finished floor elevation of the future lots in this area. The
basements in this section will need to pump to the first level and out
through the lateral into our system.
3. Provide explanation on the concrete encasement of the sanitary sewer
main.
Sheet 33A
1. The ACSA is concerned about the excessive depths of the sewer main
shown on this sheet. The sewer should be raised to provide gravity
service to the finished floor elevation of the future lots in this area. The
basements in this section will need to pump to the first level and out
through the lateral into our system.
If you have any questions concerning this review feel free to call me at (434) 977-
4511 ext. 114.
Sincerely,
Jeremy M. Lynn, RE
Senior Civil Engineer