Loading...
HomeMy WebLinkAboutSUB200700133 Review Comments Bond Estimate 2008-01-10Rolling Meadows ROAD Construction Bond Estimate (roads, site work, storm sewer) Item Item contigency No. Unit Unit Cost Cost Number installed Road Name 10 +00 to 20 +50 road length 1050.0 ft 1 aggregate base 6.0 in d 1050.0 ft L 18.0 ft W 350.0 cy $35.91 $12,568.50 2 blotted or prime &double seal 1050.0 ft L 18.0 ft W 2100.0 sy $6.30 $13,230.00 3 asphalt base 0.0 in d 1050.0 ft L 3.0 ft W 0.0 tons $73.50 $0.00 4 asphalt surface 2.0 in d 1050.0 ft L 3.0 ft W 29.4 tons $81.90 $2,407.86 6 curb CG -2 0.0 ft $8.40 $0.00 7 curb CG -6 0.0 ft $13.83 $0.00 8 sidewalk, asphalt 0.0 in d 1050.0 ft L 4.0 ft W 0.0 tons $73.50 $0.00 9 sidewalk, concrete 4' width 0.0 ft $11.66 $0.00 10 ramp CG -12 0 $315.00 $0.00 11 street name sign 1 $65.00 $65.00 12 traffic control sign 1 $49.35 $49.35 13 guardrail (or rebuild wall in right -of -wa 2 ES @ $3700 0.0 ft $16.80 $7,400.00 14 manhole or drop inlet 0 $1,365.00 $0.00 16 pipe, rcp (15 to 48 ") 15.0 in d 2 ES -1,2 $250 0 EC -1 $200 60.0 ft $23.10 $1,886.00 17 pipe, rcp (54 to 72 ") 54.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $157.50 $0.00 18 pipe, pvc (4 to 10 ") 8.0 in d 0.0 ft $6.30 $0.00 19 pipe, cmp (15 to 48 ") 15.0 in d 2 ES -1,2 $250 0 EC -1 $200 0.0 ft $23.10 $500.00 20 pipe, cmp (54 to 72 ") 60.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $146.00 $0.00 21 rip -rap, placed 0.0 ton $31.50 $0.00 22 E &S fabric, EC -2,3 0 ft L 0 ft W 0.0 sy $10.50 $0.00 23 clear and grub (for wooded sites) 1050.0 ft L 30.0 ft W 0.0 acre $10,500.00 $0.00 24 grading (per cy for cut or import only) 0.0 cy fill 0.0 cy cut 0.0 cy $3.15 $0.00 24 CBR tests (1 every 0.1 mi. per road) 1050.0 ft L 2.1 inc of 500' 3 $157.50 $488.25 25 as -built drawings (1 k + price per 0.1 r 1050.0 ft L 0.199 mi. 2 $1,050.00 $3,100.00 26 survey and layout (price per 0.1 mi.) 1050.0 ft L 0.199 mi. 2 $525.00 $2,050.00 27 mobilization 1 $525.00 $525.00 28 VDOT surety (1 lane) 1050.0 ft L 0.199 mi. 0 Lanes $2,000.00 $0.00 29 VDOT maintenance fee (1 In rd, 1 yr) 1050.0 ft L 0.199 mi. 0 Lanes $150.00 $0.00 30 VDOT admin. Cost recovery fee(1 Ian 1050.0 ft L 0.199 mi. 0 Lanes $100.00 $0.00 cost sum $44,269.96 contigency 25% $11,067.49 Total $55,340 1/9/2014