HomeMy WebLinkAboutWPO200800015 Review Comments Erosion Control Plan 2008-04-29� OF AL ,. vIRGI1`IZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Southwood Community Center [WPO200800015] Primary Contact: Clark Gathright, Dagget & Griggs [email: cjzathri hg t @dgarchs.org] Plan received date: (Rev. #2) March 31, 2008 26 Feb 2008 Date of comments: (Rev. #2) April 29, 2008 26 Mar 2008 Reviewer: (Rev. #2) Max Greene Jonathan Sharp The Erosion and sediment control plan submitted March 31, 2008 has received Engineering review. The plan can be approved after the following items have been adequately addressed: A. Erosion Control Plan [WPO200800013] 1. There is a pending Special Use Permit associated with this project. • Special use permit will be approved prior to final approval. 2. The Planning Comission must approve a critical slopes waiver prior to the disturbance of critical slopes on site. Engineering recommends processing this request with the Special Use Permit. • Special use permit will be approved prior to final approval. • This item appears adequately addressed. 4. Please provide a benehfnar-k loeation, elevation and datiifn f0f topography. • This item appears adequately addressed. 5. Please show the limits of clearing and grading encompassing all disturbances, entrances, staging and parking areas, areas where sediment -laden runoff will cross, or any construction related activities. For example, the construction entrance, parking and staging area, pavement removal, telephone pedestal relocation, and work shed relocation are located outside the limits of disturbance. • Grading shown outside the Limits of disturbance and will be corrected prior to final approval. The Asphalt berm appears to direct concentrated storm flows into the silt fence and may cause the failure of the silt fence, resulting in the delay of the project construction while the clean up and repair process is completed. 6. Erosion control measures shown in the way of construction. Silt fence shown in areas of existing pavement. Albemarle County Community Development Engineering Review Comments Page 2 of 2 • Although the silt fence is not adequate for this 2 -phase plan, wire - supported silt fence along the lowest portion of the site may be adequate as long as it will be installed to catch the water and not allow for storm -flow end -run erosion. Much like silt fence check dams, the ends will be installed higher in elevation than the main filtering section of the fence. The main filtering section of the fence will be installed at the same elevation so that no filtering area is lower than the rest. Low points are potential failure areas that may delay the progress of the site work. Otherwise, a trap is required for disturbed area. 7. Please show the tewpofar-y stabilization symbal (T-S) E)a the plans, • This item appears adequately addressed. 8. An E &S bond will be computed by the County once the plans have been approved. • Reminder. If you have any questions or would like to schedule a Thursday meeting, please contact me: Max Greene (434) 296 -5832 ext. 3283 mlzreene@albemarle.org File: E2_ESC_MRG_Southwood Community Center.doc