Loading...
HomeMy WebLinkAboutSDP200800056 Review Comments Final Site Plan and Comps. 2008-05-02ALg�,�� �'IRGINZ� COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Memorandum To: Ammy George, Timmons Group From: Lisa Glass, Principal Planner Division: Zoning and Current Development Date: May 2, 2008 Subject: SDP 08 -56: Wickham Pond, Phase II, Block 2: Final Site Plan The Albemarle County Department of Community Development, Current Development planner has reviewed the site plan referenced above. The plan may be approved when the following items have been satisfactorily addressed. Each comment is followed by a reference to the Albemarle County Zoning Ordinance. The Site Plan comments below are from the Current Development Planner only. Other comments will be forth coming under separate cover. Please work directly with each reviewer to obtain tentative approvals. 1. The final site plan must match the approved ARB plan. For example, the dumpster near Route 240 will require ARB approval or needs to be removed. 2. Provide minimum setback lines, yard and building separation requirements. This may be by a schedule or indicated on the plan. (Section 32.5.6 a) 3. Proffers include some site plan specifics. The plan should include the board fence, a note regarding full cut -off lighting and not shoe -box, and that landscape shall be completed as part of Phase 1. Please add a statement on the plan regarding the specifics to building C and D regarding when Certificates of Occupancy (CO's) can be requested. Let me know if you have questions or concerns regarding this comment. (Section 32.5.6 a and ZMA 05 -18) 4. Please add a schedule or note indicating the maximum amount of impervious cover, amount of paved parking and circulation, proposed uses and acreage in each use. (Section 32.5.6.b ) 5. Show Handicap Parking. The number and type of spaces to be provided are indicated in the Inspection comments dated 11/30/06 from Jay Schlothaur (attached). (Section 32.5.6 b) 6. Please show easements for water and sewer lines, as well as easement for other utilities. (Section 32.5.6 j, k and 1) 7. Please indicate paved surface materials on plan, for all walks, parking lots and driveways (both outside and in garage). (Section 32.5.6.n and Section 32.6.g) 8. Please state that there is no signage or show location for proposed signs. (Section 32.5.6.n) Comments 6 -10 from Preliminary approval letter: 9. Approval of screening around dumpsters. (Section 32.5.6 and 14.12.19) 10. Provide loading space calculations. Also, the 300 feet between Building C and the loading spaces is not reasonably "adjacent to the structure it serves ". Consider another space that is closer the building C. (Section 14.12.13 and 14.12.19) 11. Please correct the parking schedule so they do not contradict each other, using the correct 2.5 multiplier. And realign the text so it is easier to read. (Section 32.5.6.b, and ZMA 05 -18) 12. Approval of the Landscape Plan: Refer to comments from ARB and the approved ARB plan regarding the need for hedge rows and street trees, and match the final plan to the prelim plan and approved ARB plan. (Section 32.7.9) 13. Approval of the lighting plan: Please indicate location of out door lighting, type and illumination plan or indicate no outside lighting. (Sections 32.5.6.n, 32.6 j and 4.17) Comments from Final Site Plan Check list: 14. Detailed water and sewer plans, please copy the Current Development planner on ACSA approval. (Section 32.6 c) 15. Detailed drainage and grading: please copy Current Development planner on Eng Approvals. Consider how the lower level of the parking garage will drain; and the height for entry and use of a dumpster truck if that is used for the dumpster enclosure. (Section 32.6d) 16. Note that traffic generation figures need final approval from Engineering. (Section 32.5.6 q) Attachments: Inspection comments dated 11/30/06 from Jay Schlothaur CC: File SDP 2008 -0056 2