Loading...
HomeMy WebLinkAboutWPO200700003 Review Comments Stormwater Management Plan 2008-05-05� OF AL ,. vIRGI1`IZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: White Gables Phase IV [SDP200700006, WP0200700003] Plan preparer: Scott Collins, Collins Eng. [email: scott@collins-engineering.co Owner or rep.: White Gables Charlottesville LC Plan received date: 10 July 2007 16 Jan 2008 12 Mar 2008 09 Apr 2008 (SWM plans, Revl) Date of comments: 25 July 2007 26 Feb 2008 14 Mar 2008 05 May 2008 (SWM plans, Revl) Reviewer: Jonathan Sharp A. Final site and drainage plans (SDP200700006) Please resubmit the latest copy of the plans. Please make sure to update the most recent SWM facility location and drainage structures /information on the site plans. Also, please make sure that the review coordinator for this project, Summer Frederick, also gets a latest copy of the site plan to review. B. Stormwater Management Plan 1. A 0.5' -1.0' ponding depth should must be provided in the facility. The first flush ponding depth cannot exceed 1 foot in height from the biofilter floor for adequate biofilter functionality. [VSMH] 2. A SWM bond will be computed by the County once the plans have been approved. D. Erosion Control Plan (WP0200700003) 1. Please resubmit the latest copy of the plans. Please make sure to update the most recent drainage structures /information and coordinate the sediment trap with the proposed SWM facility on the site plans. An E &S bond will be computed once the plans have been approved. 2. An ESC bond will be computed by the County once the plans have been approved.