Project: White Gables Phase IV [SDP200700006, WP0200700003]
Plan preparer: Scott Collins, Collins Eng. [email: scott@collins-engineering.co
Owner or rep.: White Gables Charlottesville LC
Plan received date: 10 July 2007
16 Jan 2008
12 Mar 2008
09 Apr 2008 (SWM plans, Revl)
Date of comments: 25 July 2007
26 Feb 2008
14 Mar 2008
05 May 2008 (SWM plans, Revl)
Reviewer: Jonathan Sharp
A. Final site and drainage plans (SDP200700006)
Please resubmit the latest copy of the plans. Please make sure to update the most recent
SWM facility location and drainage structures /information on the site plans. Also, please make
sure that the review coordinator for this project, Summer Frederick, also gets a latest copy of the
site plan to review.
B. Stormwater Management Plan
1. A 0.5' -1.0' ponding depth should must be provided in the facility. The first flush ponding
depth cannot exceed 1 foot in height from the biofilter floor for adequate biofilter
functionality. [VSMH]
2. A SWM bond will be computed by the County once the plans have been approved.
D. Erosion Control Plan (WP0200700003)
1. Please resubmit the latest copy of the plans. Please make sure to update the most recent
drainage structures /information and coordinate the sediment trap with the proposed SWM
facility on the site plans. An E &S bond will be computed once the plans have been
approved.
2. An ESC bond will be computed by the County once the plans have been approved.