From: Denunzio, Joel D., P.E. [ Joel .Denunzio @VDOT.virginia.gov]
Sent: Tuesday, April 22, 2008 12:36 PM
To: Philip Custer
Subject: FW: Hollymead TC analysis SUB - 2006 -00113
Phil,
Below are the comments on the roundabout analysis on the above project. If you have any questions, please let
me know.
Thanks,
Joel
Joel DeNunzio, P.E.
Staff Engineer
434 - 293 -0011 Ext. 120
joel.denunzio @vdot.virginia.gov
From: Proctor, Charles C.
Sent: Tuesday, April 08, 2008 11:08 AM
To: Denunzio, Joel D., P.E.
Cc: Giometti, John A. P.E.; Viar, Michael E.
Subject: Hollymead TC analysis
Joel,
I reviewed the plans and the Sidraa analysis for the roundabout at the intersection of Towncenter Drive and
Meeting St. and have the following comments:
• THIS PLAN AND ANALYSIS DOES NOT ACCOMMODATE THE NETWORK CAPACITY, SIDEWALK
WIDTHS AND LANDSCAPE BUFFERS RECOMMENDED IN THE PLACES 29 CORRIDOR STUDY.
• The size of the roundabout was not properly entered into Sidraa to provide and accurate analysis (The
inscribed diameter and circulation width were only entered for one approach. This information has to be
entered for each approach.);
• The review cannot be completed until the analysis is corrected and resubmitted;
• The traffic volumes projected to traveling through the roundabout will be greater than 10,000 VPD (sum
of all approaches), and therefore review by the Roundabout committee at the Central Office will be
required;
Let me know if you have any questions.
Chuck
Charles C. Proctor III
District Transportation Planner (PD -10)
Planning and Land Development Section
Culpeper District Office
1601 Orange Road
Culpeper, Virginia 22701
540 - 829 -7558
charles .proctor @VDOT.virginia.gov