Loading...
HomeMy WebLinkAboutSUB200600113 Review Comments Road Plan and Comps. 2008-04-23Page 1 of 1 From: Denunzio, Joel D., P.E. [ Joel .Denunzio @VDOT.virginia.gov] Sent: Tuesday, April 22, 2008 12:36 PM To: Philip Custer Subject: FW: Hollymead TC analysis SUB - 2006 -00113 Phil, Below are the comments on the roundabout analysis on the above project. If you have any questions, please let me know. Thanks, Joel Joel DeNunzio, P.E. Staff Engineer 434 - 293 -0011 Ext. 120 joel.denunzio @vdot.virginia.gov From: Proctor, Charles C. Sent: Tuesday, April 08, 2008 11:08 AM To: Denunzio, Joel D., P.E. Cc: Giometti, John A. P.E.; Viar, Michael E. Subject: Hollymead TC analysis Joel, I reviewed the plans and the Sidraa analysis for the roundabout at the intersection of Towncenter Drive and Meeting St. and have the following comments: • THIS PLAN AND ANALYSIS DOES NOT ACCOMMODATE THE NETWORK CAPACITY, SIDEWALK WIDTHS AND LANDSCAPE BUFFERS RECOMMENDED IN THE PLACES 29 CORRIDOR STUDY. • The size of the roundabout was not properly entered into Sidraa to provide and accurate analysis (The inscribed diameter and circulation width were only entered for one approach. This information has to be entered for each approach.); • The review cannot be completed until the analysis is corrected and resubmitted; • The traffic volumes projected to traveling through the roundabout will be greater than 10,000 VPD (sum of all approaches), and therefore review by the Roundabout committee at the Central Office will be required; Let me know if you have any questions. Chuck Charles C. Proctor III District Transportation Planner (PD -10) Planning and Land Development Section Culpeper District Office 1601 Orange Road Culpeper, Virginia 22701 540 - 829 -7558 charles .proctor @VDOT.virginia.gov file: /A \cob- dts01 \CityViewLnk \Docs \2006 Applications \2006 SUBs \SUB200600113 HTC ... 4/23/2008