Loading...
HomeMy WebLinkAboutWPO200700104 Review Comments Bond Estimate 2008-04-23 (7)Hyland Ridge Phase 1 ROAD Construction Bond Estimate (roads, site work, storm sewer) Item Item No. Unit Unit Cost Cost Number installed Fontana Drive 10 +00 to 19 +30 road length 930.0 ft 1 aggregate base 8.0 in d 930.0 ft L 26.0 ft W 597.0 cy $35.91 $21,439.60 2 blotted or prime &double seal 0.0 ft L 26.0 ft W 0.0 sy $6.30 $0.00 3 asphalt base 3.0 in d 930.0 ft L 26.0 ft W 338.5 tons $73.50 $24,881.22 4 asphalt surface 2.0 in d 930.0 ft L 26.0 ft W 225.7 tons $81.90 $18,483.19 6 curb CG -2 0.0 ft $8.40 $0.00 7 curb CG -6 1860.0 ft $13.83 $25,721.01 8 sidewalk, asphalt 0.0 in d 930.0 ft L 4.0 ft W 0.0 tons $73.50 $0.00 9 sidewalk, concrete 5' width 1860.0 ft $15.86 $29,490.30 10 ramp CG -12 2 $315.00 $630.00 11 street name sign 1 $65.00 $65.00 12 traffic control sign 4 $49.35 $197.40 13 guardrail (or rebuild wall in right -of -w; 0 ES @ $3700 0.0 ft $16.80 $0.00 14 manhole or drop inlet 6 $1,365.00 $8,190.00 16 pipe, rcp (15 to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC -1 $200 290.0 ft $23.10 $6,699.00 17 pipe, rcp (54 to 72 ") 54.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $157.50 $0.00 18 pipe, pvc (4 to 10 ") 8.0 in d 0.0 ft $6.30 $0.00 19 pipe, cmp (15 to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $23.10 $0.00 20 pipe, cmp (54 to 72 ") 60.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $146.00 $0.00 21 rip -rap, placed 0.0 ton $31.50 $0.00 22 E &S fabric, EC -2,3 0 ft L 4 ft W 0.0 sy $10.50 $0.00 23 clear and grub (for wooded sites) 0.0 ft L 30.0 ft W 0.0 acre $10,500.00 $0.00 24 grading (per cy for cut or import only) 1481.0 cy fill 500.0 cy cut 1481.0 cy $3.15 $6,240.15 24 CBR tests (1 every 0.1 mi. per road) 930.0 ft L 1.86 Inc of 500' 3 $157.50 $456.75 25 as -built drawings (1 k+ price per 0.1 1 930.0 ft L 0.176 mi. 2 $1,050.00 $3,100.00 26 survey and layout (price per 0.1 mi.) 930.0 ft L 0.176 mi. 2 $525.00 $2,050.00 27 mobilization 1 $525.00 $525.00 28 VDOT surety (1 lane) 930.0 ft L 0.176 mi. 2 Lanes $2,000.00 $7,045.45 29 VDOT maintenance fee (1 In rd, 1 yr) 930.0 ft L 0.176 mi. 2 Lanes $150.00 $528.41 30 VDOT admin. Cost recovery fee(1 Ian 930.0 ft L 0.176 mi. 2 Lanes $100.00 $602.27 cost sum $156,344.76 contigency 25% $39,086.19 Total 1 $195,500 4/24/2008 Hyland Ridge Phase 1 ROAD Construction Bond Estimate (roads, site work, storm sewer) Item Item No. Unit Unit Cost Cost Number installed Fontana Drive 19 +30 to 25 +50 road length 620.0 ft $115,592.12 contigency 25% $28,898.03 1 aggregate base 8.0 in d 620.0 ft L 30.0 ft W 459.3 cy $35.91 $16,492.00 2 blotted or prime &double seal 620.0 ft L 30.0 ft W 0.0 sy $6.30 $0.00 3 asphalt base 3.0 in d 620.0 ft L 30.0 ft W 260.4 tons $73.50 $19,139.40 4 asphalt surface 2.0 in d 620.0 ft L 30.0 ft W 173.6 tons $81.90 $14,217.84 6 curb CG -2 0.0 ft $8.40 $0.00 7 curb CG -6 1240.0 ft $13.83 $17,147.34 8 sidewalk, asphalt 0.0 in d 620.0 ft L 4.0 ft W 0.0 tons $73.50 $0.00 9 sidewalk, concrete 5' width 1240.0 ft $15.86 $19,666.40 10 ramp CG -12 7 $315.00 $2,205.00 11 street name sign 1 $65.00 $65.00 12 traffic control sign 8 $49.35 $394.80 13 guardrail (or rebuild wall in right -of -w; 0 ES @ $3700 0.0 ft $16.80 $0.00 14 manhole or drop inlet 11 $1,365.00 $15,015.00 16 pipe, rcp (15 to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC -1 $200 550.0 ft $23.10 $12,705.00 17 pipe, rcp (54 to 72 ") 54.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $157.50 $0.00 18 pipe, pvc (4 to 10 ") 8.0 in d 0.0 ft $6.30 $0.00 19 pipe, cmp (15 to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $23.10 $0.00 20 pipe, cmp (54 to 72 ") 60.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $146.00 $0.00 21 rip -rap, placed 0.0 ton $31.50 $0.00 22 E &S fabric, EC -2,3 0 ft L 4 ft W 0.0 sy $10.50 $0.00 23 clear and grub (for wooded sites) 0.0 ft L 30.0 ft W 0.0 acre $10,500.00 $0.00 24 grading (per cy for cut or import only) 600.0 cy fill 500.0 cy cut 600.0 cy $3.15 $3,465.00 24 CBR tests (1 every 0.1 mi. per road) 620.0 ft L 1.24 Inc of 500' 2 $157.50 $362.25 25 as -built drawings (1 k+ price per 0.1 1 620.0 ft L 0.117 mi. 2 $1,050.00 $3,100.00 26 survey and layout (price per 0.1 mi.) 620.0 ft L 0.117 mi. 2 $525.00 $2,050.00 27 mobilization 1 $525.00 $525.00 28 VDOT surety (1 lane) 620.0 ft L 0.117 mi. 2 Lanes $2,000.00 $4,696.97 29 VDOT maintenance fee (1 In rd, 1 yr) 620.0 ft L 0.117 mi. 2 Lanes $150.00 $352.27 30 VDOT admin. Cost recovery fee(1 Ian 620.0 ft L 0.117 mi. 2 Lanes $100.00 $484.85 cost sum $115,592.12 contigency 25% $28,898.03 Total 8144,500 4/24/2008 Hyland Ridge Phase 1 ROAD Construction Bond Estimate (roads, site work, storm sewer) Item Item No. Unit Unit Cost Cost Number installed Hyland Ridge Subdivision Phase 1 ROAD Construction Bond Estimate (roads, site work, storm sewer) Item Item No. Unit Unit Cost Cost Number installed Hyland Creek Circle 10 +00 to 23 +39.2' road length 1339.2 ft 1 aggregate base 6.0 in d 1339.2 ft L 28.0 ft W 694.4 cy $35.91 $24,936.65 2 blotted or prime &double seal 0.0 ft L 28.0 ft W 0.0 sy $6.30 $0.00 3 asphalt base 3.0 in d 1339.2 ft L 28.0 ft W 525.0 tons $73.50 $38,586.18 4 asphalt surface 1.5 in d 1339.2 ft L 28.0 ft W 262.5 tons $81.90 $21,498.02 6 curb CG -2 2678.5 ft $8.40 $22,499.23 7 curb CG -6 2678.5 ft $13.83 $37,039.36 8 sidewalk, asphalt 0.0 in d 1339.2 ft L 4.0 ft W 0.0 tons $73.50 $0.00 9 sidewalk, concrete 4' width 2678.5 ft $15.86 $42,481.01 10 ramp CG -12 0 $315.00 $0.00 11 street name sign 2 $65.00 $130.00 12 traffic control sign 4 $49.35 $197.40 13 guardrail (or rebuild wall in right -of -w� 0 ES @ $3700 0.0 ft $16.80 $0.00 14 manhole or drop inlet 16 $1,365.00 $21,840.00 16 pipe, rep If to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC -1 $200 1250.0 ft $23.10 $28,875.00 17 pipe, rep (54 to 72 ") 54.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $157.50 $0.00 18 pipe, pvc (4 to 10 ") 8.0 in d 0.0 ft $6.30 $0.00 19 pipe, cmp If to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $23.10 $0.00 20 pipe, cmp (54 to 72 ") 60.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $146.00 $0.00 21 rip -rap, placed 0.0 ton $31.50 $0.00 22 E &S fabric, EC -2,3 0 ft L o ft W 0.0 sy $10.50 $0.00 23 clear and grub (for wooded sites) 0.0 ft L 0.0 ft W 0.0 acre $10,500.00 $0.00 24 grading (per cy for out or import only) 600.0 cy fill 500.0 cy cut 600.0 cy $3.15 $3,465.00 24 CBR tests (1 every 0.1 mi. per road) 1339.2 ft L 2.678 inc of 500' 4 $157.50 $582.75 25 as -built drawings If k+ price per 0.1 1 1339.2 ft L 0.254 mi. 3 $1,050.00 $4,150.00 26 survey and layout (price per 0.1 mi.) 1339.2 ft L 0.254 mi. 3 $525.00 $2,575.00 27 mobilization 1 $525.00 $525.00 28 VDOT surety (1 lane) 1339.2 ft L 0.254 mi. 2 Lanes $2,000.00 $10,145.76 29 VDOT maintenance fee (1 In rd, 1 yr) 1339.2 ft L 0.254 mi. 2 Lanes $150.00 $760.93 30 VDOT admin. Cost recovery fee(1 Ian 1339.2 ft L 0.254 mi. 2 Lanes $100.00 $757.29 cost sum $261,044.58 contigency 25% $65,261_14 Total 1 $326,400 4/24/2008