HomeMy WebLinkAboutSDP200700048 Review Comments Final Site Plan and Comps. 2008-04-21ALg�,��
�'IRGINZ�
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project:
Plan preparer:
Owner or rep.;
Date received:
Date of Comment:
Engineer:
SDP - 2007 - 00048, Crozet Gateway Center, final site plan, ESC & SWM
Ms. Ammy George, PE, Timmons Group
Mr. Danny Yousef, Yousef, LLC
Rev. 4: 4 April 2008 (plan rev. date 3 April 2008)
Rev. 3: 3 March 2008 (plan rev. date 13 February 2008)
Rev. 2: 30 July 2007 (plan rev. date 23 July 2007)
Rev. 1: 06 July 2007 (plan rev. date 06 July 2007)
15 May 2007 (plan date 08 May 2007)
Rev. 4: 21 April 2008
Rev. 3: 20 March 2008
Rev. 2: 15 August 2007
Rev. 1: 18 July 2007
12 June 2007
Amy Pflaum
(fax 434.295.8317)
(fax unknown)
The final site plan for Crozet Gateway Center received on 4 April 2008, has been reviewed. The following
items have been adequately addressed:
A. Expedited engineering final site plan review comments:
Reviewed under SDP - 2007 - 00048:
1. Sheets 5 & 11 have been revised per VDOT November 9, 2007 comments to remove "ditch 2" and
direct flow to inlet STR -113. However, Sheet 18 continues to show the ditch.
Rev. 3: Comment has been addressed.
2. The drainage computations on Sheet 14 have not been updated to include STR -113 per VDOT
request.
Rev. 3: Comment has been addressed.
3. VDOT approval is required before engineering can grant final approval.
Rev. 1: VDOT review has not been received by this review.
4. The applicant has submitted a critical slope waiver request to the County. This review performed
under a separate cover. [DM]
Rev. 1: The Planning Commission approved the critical slope waiver.
5. Rev. 1: Please clarify the intent of the final grades at the rear entrance and the rear parking lot
grading. The drainage does not appear to match the drainage areas shown on the drainage map.
An adequate landing needs to be shown on the final site plan for the rear entrance.
Rev. 2: This comment has been adequately addressed with this plan submittal.
6. All review comments have been adequately addressed with this plan submittal. There are
no further engineering review items.
B. Expedited engineering SWM plan review comments:
Albemarle County Community Development
Engineering Review Comments
Sheet 2 of 2
Reviewed under WPO- 2007 -00033
7. Applicant needs to submit SWM maintenance agreement and $17 fee to the County.
Rev. 1: This comment has NOT been addressed by the applicant.
Rev. 2: This comment has been adequately addressed with this plan submittal.
8. Applicant needs to submit approval letter from Filterra.
Rev. 1: This comment has NOT been addressed by the applicant.
Rev. 2: This comment has been adequately addressed with this plan submittal.
9. The SWM portion of the Water Protection Ordinance bond amount has not been computed.
Rev. 2: The SWM portion of the WPO bond amount is $248,000.00. Please contact
Ms. Pam Shifflett at 434.296.5832 Ext. 3246 for more information.
10. Rev. 1: The weir plate needs to be in the outlet structure manhole not where the Raintank is
located. This will make the cleaning and maintenance of the facility difficult as shown.
Rev. 2: This comment has been adequately addressed with this plan submittal.
11. All other previous review comments were adequately addressed with this plan submittal. There
are no further engineering review items.
C. Expedited engineering ESC plan review comments:
Reviewed under WPO- 2007 -00033
12. Rev. 1: The design of sediment trap #1 appears to have changed from the first plan submittal.
This plan submittal no longer has the design table that was shown on the first plan. Please revise.
Rev. 2: This comment has been adequately addressed with this plan submittal.
13. All other previous review comments were adequately addressed with this plan submittal. There
are no further engineering review items.
14. The ESC portion of the Water Protection Ordinance bond amount has not been computed.
Rev. 2: The SWM portion of the WPO bond amount is $29,000.00. Please contact Ms.
Pam Shifflett at 434.296.5832 Ext. 3246 for more information.
15. All other previous review comments were adequately addressed with this plan submittal. There
are no further engineering review items.
File: E5_fsp &esc &swm_ ADP-07-048 Crozet Gateway Center