Loading...
HomeMy WebLinkAboutWPO200700104 Review Comments Bond Estimate 2008-04-23 (5)Hyland Ridge Subdivision Phase 2 ROAD Construction Bond Estimate (roads, site work, storm sewer) Item Item No. Unit Unit Cost Cost Number (installed) Hyland Creek Drive 10 +00 to 23 +03.91 , road length 1304.0 ft 1 aggregate base 6.0 in d 1304.0 ft L 28.0 ft W 676.1 cy $35.91 $24,279.55 2 blotted or prime &double seal 0.0 ft L 28.0 ft W 0.0 sy $6.30 $0.00 3 asphalt base 3.0 in d 1304.0 ft L 28.0 ft W 511.1 tons $73.50 $37,569.41 4 asphalt surface 1.5 in d 1304.0 ft L 28.0 ft W 255.6 tons $81.90 $20,931.53 6 curb CG -2 2607.9 ft $8.40 $21,906.36 7 curb CG -6 2607.9 ft $13.83 $36,063.35 8 sidewalk, asphalt 0.0 in d 1304.0 ft L 4.0 ft W 0.0 tons $73.50 $0.00 9 sidewalk, concrete 5' width 2607.9 ft $15.86 $41,348.25 10 ramp CG -12 0 $315.00 $0.00 11 street name sign 1 $65.00 $65.00 12 traffic control sign 2 $49.35 $98.70 13 guardrail (or rebuild wall in right -of -wa 0 ES @ $3700 0.0 ft $16.80 $0.00 14 manhole or drop inlet 18 $1,365.00 $24,570.00 16 pipe, rcp (15 to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC -1 $200 1500.0 ft $23.10 $34,650.00 17 pipe, rcp (54 to 72 ") 54.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $157.50 $0.00 18 pipe, pvc (4 to 10 ") 8.0 in d 0.0 ft $6.30 $0.00 19 pipe, cmp (15 to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $23.10 $0.00 20 pipe, cmp (54 to 72 ") 60.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $146.00 $0.00 21 rip -rap, placed 0.0 ton $31.50 $0.00 22 E &S fabric,EC -2,3 0 ft L 4 ft W 0.0 sy $10.50 $0.00 23 clear and grub (for wooded sites) 0.0 ft L 30.0 ft W 0.0 acre $10,500.00 $0.00 24 grading (per cy for cut or import only) 600.0 cy fill 500.0 cy cut 600.0 cy $3.15 $3,465.00 24 CBR tests (1 every 0.1 mi. per road) 1304.0 ft L 2.608 inc of 500' 4 $157.50 $582.75 25 as -built drawings (1k+ price per 0.1 r 1304.0 ft L 0.247 mi. 3 $1,050.00 $4,150.00 26 survey and layout (price per 0.1 mi.) 1304.0 ft L 0.247 mi. 3 $525.00 $2,575.00 27 mobilization 1 $525.00 $525.00 28 VDOT surety (1 lane) 1304.0 ft L 0.247 mi. 2 Lanes $2,000.00 $9,878.41 29 VDOT maintenance fee (1 In rd, 1 yr) 1304.0 ft L 0.247 mi. 2 Lanes $150.00 $740.88 30 VDOT admin. Cost recovery fee(1 Ian 1304.0 ft L 0.247 mi. 2 Lanes $100.00 $743.92 cost sum $264,143.10 contigency 25% $66,035.78 Total 1 $330,200 4/24/2008