Loading...
HomeMy WebLinkAboutARB200700152 Review Comments Final Site Plan and Comps. 2008-04-25ALg�,�� �'IRGINZ�` COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 April 25, 2008 VMDO Architect c/o Todd Bullard or Jim Richardson 200 E Market Street Charlottesville, VA 22902 RE: ARB2007 -00152 Brownsville Elementary School Addition & Renovations Tax Mp 56, Parcel 17A Dear Gentlemen: I have reviewed your recent submittal for the above - referenced project, which included site plan sheets 1 -6 and 10, and architectural sheets 7 -9.1 have the following comments. 1. A note on Sheet 3 reads, "HVAC units shall be located only on flat roof sections behind sloped classroom roofs so that they are substantially screened from the Entrance Corridor. Note, the HVAC units for the gym and cafeteria addition shall be located inside the building on the mezzanine level." The note on the drawings presented at the February 4, 2008 meeting read, "HVAC units shall be located only on flat roof sections behind sloped classroom roofs so that they are not visible from the Entrance Corridor. Note, the HVAC units for the _ shall be located inside the building on the mezzanine level." I cannot approve the change in wording from "are not visible" to "are substantially screened ". Revise the note to include the original wording in the first sentence. 2. Condition #2 in our February 27, 2008 letter stated that the Willow Oaks and Sugar Maples were to be increased in size to 3 1 /2" caliper at planting. This change has not been made. In the plant list, revise the caliper size of the Willow Oaks and Sugar Maples to 3' /z" minimum at planting. 3. Areas of "transition brick" are noted in the new submittal. The transition area isn't clear in the color rendering of the architectural elevations. Please submit a copy of the black and white line drawings for better clarity. Please provide: 1. One sets of revised drawings addressing each of these conditions. Include updated ARB revision dates on each drawing. 2. A memo including detailed responses indicating how each condition has been satisfied. If changes other than those requested have been made, identify those changes in the memo also. Highlighting the changes in the drawing with "clouding" or by other means will facilitate review and approval. 3. The attached "Revised Application Submittal" form. This form must be returned with your revisions to ensure proper tracking and distribution. When staffs review of this information indicates that all conditions of approval have been met, a Certificate of Appropriateness may be issued. If you have any questions, please do not hesitate to contact me. Sincerely, Margaret Maliszewski Principal Planner Cc: Neale Craft ARB File COUNTY OF ALBEMARLE Department of Community Development REVISED APPLICATION SUBMITTAL This form must be returned with your revisions to ensure proper tracking and distribution. County staff has indicated below what they think will be required as a resubmission of revisions. If you need to submit additional information please explain on this form for the benefit of the intake staff. All plans must be collated and folded to fit into legal size files, in order to be accepted for submittal. TO: Todd Bullard DATE: PROJECT NAME: ARB2007 -152 Brownsville School Submittal Type Requiring Revisions ( ) indicates submittal Code County Project Number # Copies Erosion & Sediment Control Plan (E &S) # Copies Distribute To: Mitigation Plan (MP) 1 Margaret Maliszewski Waiver Request (WR) Stormwater Management Plan (SWMP) Road Plan (RP) Private Road Request, with private/ public comparison (PRR) Private Road Request — Development Area (PRR -DA) Preliminary Site Plan (PSP) Final Site Plan (or amendment) (FSP) Final Plat (FP) Preliminary Plat (PP) Easement Plat (EP) Boundary Adjustment Plat (BAP) Rezoning Plan (REZ) Special Use Permit Concept Plan (SP -CP) Reduced Concept Plan (R -CP) Proffers (P) Bond Estimate Request (BER) Draft Groundwater Management Plan (D -GWMP) Final Groundwater Management Plan (F -GWMP) Aquifer Testing Work Plan (ATWP) Groundwater Assessment Report (GWAR) Architectural Review Board (ARB) ARB2007 -00152 Other: Please explain (For staff use only) Submittal Code # Copies Distribute To: Submittal Code # Copies Distribute To: ARB 1 Margaret Maliszewski