Loading...
HomeMy WebLinkAboutWPO200700105 Review Comments Bond Estimate 2008-05-07BOND ESTIMATE - EROSION CONTROL Spreadsheet last revised:12 -5 -01 PROJECT NAME: Monticola Driveway PROJECT NUMBER: WPO- 2007 -00105 DATE OF ESTIMATE: 05/01/08 ESTIMATE BY: ADL BASED ON: ESC plan dated 31 March 2008 WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 1.8 1500 2700 SILT FENCE LF 1600 5 8000 SAFETY FENCE LF 0 3 0 TEMPORARY FILL DIVERSION LF 0 3 0 DIVERSION DIKE LF 0 3 0 TEMPORARY SLOPE DRAIN LF 0 20 0 SEDIMENT TRAP 1 ACRES 0.75 1000 750 SEDIMENT BASIN 1 ACRES 0 1000 0 CULVERT INLET PROTECTION EA 4 500 2000 INLET PROTECTION EA 0 200 0 OUTLET PROTECTION EA 0 200 0 EC -2 & 3 DITCH PROTECTION LF 0 10 0 RIP -RAP LF 0 55 0 CHECK DAMS SQ.YD. 38 30 1140 PAVED CONSTRUCTION ENTRANCE EA 0 2000 0 SUBTOTAL 14590.00 CONTINGENCY & ADMINISTRATION LS 25% 3647.50 TOTAL 18237.50 BOND AMOUNT REQUIRED 18000