Loading...
HomeMy WebLinkAboutSDP200600125 Review Comments Waiver, variation or substitution requirement 2008-05-30Al d'7a COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 To: Bill Fritz, Chief of Current Development From: Amy Pflaum, Engineering Review Subject: SDP - 2006 - 00125, Van Dine Plaza, Waiver Request Date received: 29 April 2008 Date of Comment: 30 May 2008 The applicant has requested a waiver for the new construction proposed on TMP 45 -100, 101, and 101 B. The waiver request was received on 29 April 2008. The engineering analysis of the requests is as follows: Waiver of the requirement for street entrance adequate landing: The applicant has requested a waiver for relief from providing an adequate entrance landing as required per County Code Section 18.4.12.17.b. This section requires that an adequate landing and/or grade transition shall be provided for vehicle access aisles at the intersection with public streets to allow for stopping of vehicles and sight distance. The approach grade should not exceed 4% for a distance of not less than 40 feet from the edge of the street being intersected. 7 I I I 'f Rio Road West I € I a I � aIa i �lah of EAkr`or'ce I &a* Profile 0+00 i I Existing k I. Entrance C 4 C+ Proposed { „: t Sub - Entrance . l i 212 ', 1 r , Existing 15% I slope i f I Existing Sub - Entrance LLL (fl -fl TMP45 -101 Proposed Retail Building T77_7�, l t TMP45 -102 + Existing Retail Building Albemarle County Community Development SDP - 2006 -00125 Waiver Request Sheet 2 of 2 The development site has an existing access to Rio Road West which is shared with TMP 45 -102, an existing retail site. The existing access does not meet the requirements of the Code. The first 40 feet from the edge of Rio Road West slopes downward at up to 15 %. The total slope differential between the existing edge of Rio Road West and the sub - entrance into the existing retail site is approximately 13 %. Van Dine proposes to match the centerline of its sub - entrance with the existing one. An entrance which sharply drops away from the street such as this generates safety concerns. A vehicle exiting such a site may not have an adequate place to stop while assessing traffic on the street. Once stopped, it will be difficult for the vehicle to regain momentum to enter the street in a timely manner between traffic. The vehicle may also have a problem with sight distance. This is an existing paved entrance that is already in use by the retail site on TMP 45 -102. Curb returns on both sides of the entrance are already in place. Upgrading this entrance to meet the County Code would most likely require the rebuilding of both curb returns and repaving the entire cross section. If an adequate 4% landing of 40 feet was constructed, tying the grades back into the existing sub - entrance of TMP 45 -102 at the maximum allowable 10% grade for travelways would probably trigger the regrading and replacement of asphalt on the retail site. This work would be significant and would require easements from the retail site property owner. The proposed development plans to add over 25,000 square feet of retail space, generating over 800 vehicle trips per day entering and exiting. This is a substantial amount of traffic to add to this sub - standard entrance. Engineering feels it is imperative that the entrance be improved and has had meetings with the applicant to discuss design alternatives. Engineering has offered the applicant the option of rebuilding the entrance with a 4% landing of 20 feet, and then the possibility of waiving the 10% maximum travelway slope in order to tie back to existing. The applicant then proposed building the 20 -foot landing on one lane of the existing entrance and tying to the existing curb on the other side, this would cause a steep cross - slope on the entrance that engineering does not feel is safe or adequate. Aside from upgrading the existing entrance and regrading the sub - entrances, another alternative is to close this existing entrance and rebuild a new complying entrance completely within the property boundaries of the applicant's site, consequently, granting an access easement to TMP 45 -102. As a result of the existing alternatives available to provide this new development with a safe and adequate Fig. 2: Existing entrance and retail site off of Rio Fig. 3: In -car view of exiting existing Road West. File: El _wvr ADP_06 -125 Vandine Plaza