Loading...
HomeMy WebLinkAboutSUB200800093 Review Comments Preliminary Plat 2008-05-14ALg�,�� �'IRGINZ� COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: SUB - 2008 - 00093, Glenmore Phase 2, Section S -5, Preliminary Plat Plan preparer: Mr. Nathan Morris, Roudabush, Gale & Associates, Inc. nmorris@roudabush.com Owner or rep.: Mr. Michael Barnes, KG Associates mbames @thekesslergroup.com Date received: 24 March 2008 (plat date 21 March 2008) Rev 1: 28 April 2008 Date of Comment: 15 April 2008 Rev 1: 14 May 2008 Engineer: Amy Pflaum, Current Development Engineer apflaum @albemarle.org The revised preliminary plat for Glenmore Phase 11, Section S -5, received on April 28, 2008, has been reviewed. The engineering review for current development recommends approval of the preliminary plat. 1. Please match the title of the Subdivision Plat on the title sheet ( GLENMORE PHASE 2, SECTION S- 5) to the title in the title block of the border on each sheet ( GLENMORE SECTION S -5) [14- 302A1] Rev 1: Comment addressed 4128108. 2. Please label the other phases of Glenmore on the Vicinity Map on Sheet 1. [14- 302A2] Rev 1: Comment addressed 4128108. On the Sheet 1, Note 2.a under DEVELOPMENT STANDARDS FOR THE GLENMORE PRD states that "lots shall only front on and have direct access onto Piper Way and Paddington Drive ". No such streets are labeled in this plat. Please correctly label the subdivision streets or correct the note. Rev 1: Comment addressed 4128108. 4. On the Sheet 1, Note 3 under DEVELOPMENT STANDARDS FOR THE GLENMORE PRD states that "Open space linkages shall be at least thirty (30) feet wide." Is the OPEN SPACE labeled between lots 29 and 30, as well as along the backs of lots 33 -42 considered a "linkage "? If so, should it match this standard? Rev 1: Comment addressed 4128108. 5. The 20' SANITARY SEWER EASEMENT RESERVED FOR FUTURE EXTENSION shown beyond the back of lots 10 -14 on Sheet 6 may need to be relocated farther away from the INTERMITTENT STREAM. Should an analysis of this stream be done in the future which determines the stream is perennial, a 100' buffer will be placed on it and disturbance for future development will not be allowed per the County's Water Protection Ordinance. It appears that a reasonable alternative for this proposed alignment would be to shift the easement farther up the hill. Rev 1: Comment addressed 4128108 by moving proposed sewer line slightly up the bank. 6. Regarding the disturbance of the Carroll Creek stream buffer at the bottom of Sheet 5, it appears the proposed sanitary sewer could reasonably be realigned to avoid this disturbance. From the outfall of proposed SS -MH -2, the sewer line could run southwesterly into the existing 20' A.C.S.A. Easement (D.B. 2422 p. 469 -485) just outside of the buffer, and then continue southeasterly within the existing easement and buffer to meet the existing sewer. This new alignment would add one manhole to the Albemarle County Community Development Engineering Review Comments Sheet 2 of 2 current configuration. The stream buffer has already been disturbed for the existing easement, it seems unnecessary to disturb it again in such close proximity. Rev 1: Comment addressed 4128108. 7. A stub -out is shown on proposed SS -MH -1, is a future connection expected in this area? Rev 1: Comment addressed 4128108, future connection to Rivanna Village expected. 8. Please include a date of survey with the SOURCE OF TOPO information on Sheet 1. [14- 302Al2] Rev 1: Comment addressed 4128108. 9. The centerline of the Alley intersection with Ferndown Lane is only forty (40) feet away from the centerline of the intersection of Road `A' with Ferndown Lane. VDOT standard intersection spacing for a shoulder and ditch section street with a 20 mph design speed is 200 feet. Traffic will be minimal on these roads with this phase of Glenmore, however, a future connection is being provided at the end of Ferndown Lane. Exploring a safer alignment for these intersections is recommended. Rev 1: Comment addressed 4128108 with relocation of alley connection. 10. Regarding the Pavement Design Worksheet submitted for Ferndown Lane: The design ADT used is 350, this is calculated using the lots in the Glenmore Phase 2, Section S -5 development, but it does not account for trips generated when Ferndown is extended into future development as stated. If the traffic count increases in the future, a greater pavement thickness may be required at that time. Rev 1: Comment noted 4128108. 11. Drainage easements from neighboring property owners must be granted prior to approval of the subdivision plat. Please show and label these easements on the plat. [14- 302A5] Portions of lots 15 -29 sheet flow to an existing drainage swale that runs along the property boundary. Rev 1: Concentrated flow is no longer proposed to be discharged into the existing drainage Swale along the property boundary with TMP 80 -47, therefore, and easement is not required. The northern portion of Ferndown Lane and the rear of lots 15 -19 will sheet flow to this existing swale. Please note that the WPO application for this project will need to verify that the existing Swale can handle the proposed runoff generated by the additional impervious surfaces. 12. Code 17 -315 -A of the Water Protection Ordinance provides that "Best management practices shall be designed and sited to capture runoff from the entire land development project area and, in particular, areas of impervious cover within the land development, to the maximum extent practicable". Stormwater runoff from portions of Ferndown Lane and Road `A' and the dwellings and site improvements for Lots 11 - 19 will not be captured by a proposed stormwater management facility. Additional stormwater measures could be proposed behind Lot 14 to address water quantity and quality. Rev 1: Comment addressed 4128108 by addition of conceptual water quality bio filter in this area. File: E2—ADP—Glenmore Phase 2 Section S -5