Loading...
HomeMy WebLinkAboutARB200700152 Review Comments Final Site Plan and Comps. 2008-05-15ALg�,�� �'IRGINZ�` COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 May 15, 2008 VMDO Architect c/o Todd Bullard or Jim Richardson 200 E Market Street Charlottesville, VA 22902 RE: ARB2007 -00152 Brownsville Elementary School Addition & Renovations Dear Gentlemen: I have reviewed your recent ARB submittal for the above - referenced project, which included site plan sheets 1- 4 with revision date of 5- 13 -08, lighting sheets 5, 6 and 10 with revision date of 3- 28 -08, elevations sheet 7 with revision date of 5- 13 -08, elevations sheet 8 with revision date of 3- 28 -08, and sheet 9 with revision date of 5- 13 -08. The revisions included in these drawings satisfy the outstanding conditions of ARB approval. You may consider this letter your Certificate of Appropriateness. This approval is predicated on the fact that the design and materials, as proposed and exhibited for review, will be used. The acceptance of approval implies that the applicant has agreed to execute the design as indicated on the site plan, attachments, materials, samples, and other submittal items presented. Any change in the approved design or materials will require an amendment to the plan and must be reviewed and approved by the Architectural Review Board. Please note the following: 1. This application is approved with the condition that new rooftop HVAC units shall be located on flat roof sections behind sloped classroom roofs so that they are not visible from the Entrance Corridor, and the new HVAC units for the gym and cafeteria addition shall be located inside the building on the mezzanine level. 2. Changes made to the site or architectural plans after issuance of a Certificate of Appropriateness can delay the signing of mylars and the approval of building permits. It is in the applicant's best interest to notify ARB staff of such changes and to initiate the review of amendments to ARB- approved plans to avoid future delays. If you have any questions, feel free to contact me. Sincerely, Margaret Maliszewski Principal Planner Cc: Neale Craft ARB File