May 15, 2008
VMDO Architect
c/o Todd Bullard or Jim Richardson
200 E Market Street
Charlottesville, VA 22902
RE: ARB2007 -00152 Brownsville Elementary School Addition & Renovations
Dear Gentlemen:
I have reviewed your recent ARB submittal for the above - referenced project, which included site plan sheets 1-
4 with revision date of 5- 13 -08, lighting sheets 5, 6 and 10 with revision date of 3- 28 -08, elevations sheet 7
with revision date of 5- 13 -08, elevations sheet 8 with revision date of 3- 28 -08, and sheet 9 with revision date of
5- 13 -08. The revisions included in these drawings satisfy the outstanding conditions of ARB approval. You
may consider this letter your Certificate of Appropriateness.
This approval is predicated on the fact that the design and materials, as proposed and exhibited for review, will
be used. The acceptance of approval implies that the applicant has agreed to execute the design as indicated on
the site plan, attachments, materials, samples, and other submittal items presented. Any change in the approved
design or materials will require an amendment to the plan and must be reviewed and approved by the
Architectural Review Board.
Please note the following:
1. This application is approved with the condition that new rooftop HVAC units shall be located on flat roof
sections behind sloped classroom roofs so that they are not visible from the Entrance Corridor, and the new
HVAC units for the gym and cafeteria addition shall be located inside the building on the mezzanine level.
2. Changes made to the site or architectural plans after issuance of a Certificate of Appropriateness can delay
the signing of mylars and the approval of building permits. It is in the applicant's best interest to notify
ARB staff of such changes and to initiate the review of amendments to ARB- approved plans to avoid future
delays.
If you have any questions, feel free to contact me.
Sincerely,
Margaret Maliszewski
Principal Planner
Cc: Neale Craft ARB File