HomeMy WebLinkAboutSDP200800064 Review Comments Preliminary Site Plan 2008-05-30County of Albemarle
Department of Community Development
Memorandum
To: Chris Kabbash, Primary Applicant
Tom Muncaster, Plan Preparer
From: Lisa Glass, Principal Planner
Division: Zoning and Current Development
Date: May 30, 2008
Subject: SDP 08 -64: Preliminary Site Plan for Georgetown - Hydraulic Office Building
Comments on May 19, 2008 revised site plan
The Albemarle County Department of Community Development, Current Development Division planner
has reviewed the site plan referenced above. The plan may be approved when the following items have
been addressed. The site plan comments below are from the Current Development Planner only. Please
contact Lisa Glass at 296 -5832 x 3432 if you have questions. Comments from other reviewers are on
separate pages.
1. Show dumpster enclosure dimensions, or obtain waiver. (Section 32.5.6 n)
5128108 Obtain Waiver of section requiring a dumpster pad prior to preliminary approval.
2. Obtain engineering approval of the preliminary plan; to include addressing traffic generation.
(Section 32.5.6 q)
5/28/08 obtain engineering approval, see separate comments.
3. Landscape plan is required for final approval. Include a plant list with the correct number of trees
removed and to be replaced in the conservation easement, note 2 above, and match the ARB
approved plan. (Section 32.5.6 a and e)
5/28/08 5/28 sees Planning comments from Ms Grant: to match plan and schedule.
4. The final site plan must match the approved ARB Plan; be sure to address all the conditions of the
3/26 07 letter including but not limited to keeping construction of the setbacks and buffers, and
providing the correct number of trees interior to the parking lot.
5. Final site plan must obtain ACSA approval; To include addressing the ACSA easement shown at
south property line as 12 feet wide;
6. Final site plan must obtain RWSA approval; to include adding dimension for the RWSA water line
easement along the road frontage. (Section 32.5.6 j)
7. Lighting plan with diagram or photograph of luminaire and photometric plan required for final
approval. (Section 32.5.6 n)
8. Final site plan must meet all ZMA application conditions and proffers.
Final approval of the preliminary plan is subject to approvals from all agencies and departments:
Current Development Division, Engineering
Fire and Rescue
Inspections
Albemarle County Service Authority
Virginia Department Transportation
Short comments from other departments available on City View