Loading...
HomeMy WebLinkAboutSDP200700111 Review Comments Final Site Plan and Comps. 2008-05-30ALg�,�� �'IRGINZ� COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: WPO- 2007 - 00080, Haden Place, FSP, ESC, SWM and Street Plans Plan preparer: Mr. Tim Miller, PE, Dominion Development Resources (fax: 434.296.5220) Owner or rep.: Wendell Gibson, Wendell Gibson, Inc. (fax: unknown) Date received: 04 October 2007 (plan dated 06 September 2007) 2"d review 14 January 2008 3rd Rev. 7 April 2008 4`h Rev. 21 May 2008 Date of Comment: 18 October 2007 2"d review 15 February 2008 3rd Rev. 7 May 2008 4`h Rev. 30 May 2008 Engineer: Allan Schuck for expedited review 2'd review Max Greene 3rd Rev. Max Greene 4th Rev. Max Greene The final site plan, E &SC, SWM, and street plans for Haden Place, received on 21 May 2008, have been reviewed. The plans can be approved after the following changes /corrections. A. Final site plan: 1. Please provide offsite easement plats for recordation with the next submittal for the temporary construction easements as well as any permanent easements for Stormwater Management or other utilities. Reminder, Letters of intent for temporary construction required for final approval. 3rd Rev. - Reminder, Letters of intent for temporary construction required for final approval. 4th Rev. Reminder. B. Street plan: (SDP- 2007 - 00200) 2. VDOT approval will be needed before final engineering approval can be granted. VDOT comments have not been received at the time of these comments. [DM] Same conditions apply for this review. 3rd Rev. - Same conditions apply for this review. 4th Rev.Latest VDOT comments: • The widening of Haden lane needs to be extended in front of lots 1 -8 on the east side of the road to include 27 feet of pavement as was shown in previous plans. • The typical section for the widening of Haden Lane on sheet S5 needs to show the 7 foot parking lane and 27 feet of total pavement width. • Sight distance at the intersection of Haden Lane and Jarmans Gap Road need to be shown on sheet S5. 3. A Road Bond has not been calculated at this time. Roads will be built or bonded prior to final plat approvals. C. Stormwater Management plan: (WPO- 2007 - 00080) 4. Please submit a check to the county for the amount of $6,826.98 for use of the Lickinghole water quality basin. This will adequately address water quality for this project. Please note the Lickinghole rate change occurred 12 February 2008 in accordance with Board Policy. 3rd Rev. — Reminder. Plan approval is not contingent on this payment. However, no grading permit can be issued until the fees are paid. 4d` Rev. Reminder. 5. Please submit signed copy of the Stormwater Maintenance Agreement and $17 fee to the County. Reminder, plans cannot be approved until all applicable requirements are adequately addressed. 3rd Rev. — Reminder, plans cannot be approved until all applicable requirements are adequately addressed. The information can found at these locations: httn:// www.albemarle.orL-/UDload/ima2es /forms center /departments /communitv develo pment/ forms /applications /Stormwater_Management_BMP_ Facilities_ Maintenance_Agr eement.pdf and http:// www .albemarle.org/upload/images/ forms_ center /departments /community_develo Dment/forms / applications /Stormwater Management BMP Facilities Maintenance Agr eement_Procedures.pdf 4th Rev. Reminder The SWM portion of the Water Protection Bond is $20,400.00 and will become a part of the total water protection bond amount. D. Erosion and Sediment Control plan: (WPO- 2007 - 00080) 7. Just a reminder, DCR is enforcing the VSMP General Permit Registration Statement. Please contact Mr. Matthew Grant, DCR, at 804.225.3068 for more information. This does not affect your review /approval of this plan. Reminder 8. The ESC portion of the Water Protection Bond is $40,800.00 and will become a part of the total water protection bond amount. Engineering review staff is available from 2 -4 PM on Thursdays to discuss these review comments. Please contact an engineering reviewer at 296 -5832, to schedule an appointment. File: E4_esc &swm &fsp_MRG_07 -080 Haden Place.doc