Loading...
HomeMy WebLinkAboutARB200700009 Review Comments Final Site Plan and Comps. 2008-05-22ALg�,�� �'IRGINZ�` COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4012 May 22, 2008 Eric Goetz 968 Mountain Road Afton, VA 22920 RE: ARB- 2007 -09: White Gables (Phase 4): Final Review of a Site Development Plan Dear Mr. Goetz: I have reviewed your recent submittal for the above - referenced project, which consisted of the following drawings: • Lighting plan sheet 8 of 11, with revision date of 5 -21 -08 • Lighting details sheet 9 of 11, with revision date of 5 -21 -08 The revisions made in these drawings resolve the outstanding conditions of ARB approval. You may consider this letter your Certificate of Appropriateness. This approval is predicated on the fact that the design and materials, as proposed and exhibited for review, will be used. The acceptance of approval implies that the applicant has agreed to execute the design as indicated on the site plan, attachments, materials, samples, and other submittal items presented. Any change in the approved design or materials will require an amendment to the plan and must be reviewed and approved by the Architectural Review Board. Please note the following: 1. This application is approved with the condition that mechanical equipment shall not be visible from the Entrance Corridor. 2. The site and architectural drawings for this project were last reviewed approximately one year ago. When mylars are submitted for signature and building permit applications are made, the mylars and permit drawings will be compared to the site and architectural drawings that were reviewed a year ago. If the drawings do not match, there will be a delay in the signing of mylars and the approval of building permits. If you have any questions concerning any of the above, please feel free to call me. Sincerely, Margaret Maliszewski Principal Planner cc: Summer Frederick ARB -07 -09