HomeMy WebLinkAboutSDP200700099 Review Comments Major Amendment, Preliminary Plan 2008-05-23�'IRGINLP
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4012
May 23, 2008
Scott Collins
Collins Engineering
800 E. Jefferson Street
Charlottesville, VA 22904
Peter Sheeran
Sheeran Architects
226 East High Street
Charlottesville, VA 22902
RE: ARB 2007 -95: Flow Auto — Maintenance Building Addition
Dear Scott and Peter:
I have reviewed the recent submittals for the above - referenced proposal, including architectural
plans A1.1, 1.2, 1.4, 4. 1, and D1.1 with revision date of 5/5/08, A1.3, 2.1, 2.3, and 7.1 with
revision date of 2/19/08, and A2.2 with revision date of 4/14/08. 1 have the following comments.
1. The primary EIFS color for the building was approved as "gray dawn ". "Gray flannel" is
listed in the schedule on A2.3. The "gray flannel" should be revised to "gray dawn ".
2. The site plan corresponding to this amendment was not submitted for review. The following
comments remain outstanding:
a. Revise the photometric plan to show illumination levels calculated using a
maintenance factor of 1.0. Ensure that lighting levels do not exceed 30 footcandles.
Revise the luminaire schedule to clearly note the color of the proposed fixtures.
b. Revise the site plan to show the proposed planter on the west side of the building.
Provide for review complete information on the plants proposed for the planter.
Please note the following:
1. The site plan for the maintenance building must be coordinated with the site plan for the
addition and new display parking. Please double -check that the changes proposed to the
planting strip between parcels 14D and 15D are coordinated throughout.
2. Complete information on wall signs was not provided. Consequently, none of the signs
included on the architectural drawings are approved. The ARB will require that company -
standard designs be modified to meet the EC Guidelines.
Please provide:
1. Two full sets of revised drawings addressing each of these conditions. Include updated ARB
revision dates on each drawing and an ARB approval signature panel.
2. A memo including detailed responses indicating how each condition has been satisfied. If
changes other than those requested have been made, identify those changes in the memo also.
Highlighting the changes in the drawing with "clouding" or by other means will facilitate
review and approval.
3. The attached "Revised Application Submittal" form. This form must be returned with your
revisions to ensure proper tracking and distribution.
When staff s review of this information indicates that all conditions of approval have been met, a
Certificate of Appropriateness may be issued.
If you have questions, feel free to contact me.
Sincerely,
Margaret Maliszewski
Principal Planner
cc: File
Michael Wall, Flow Companies, Inc., via email
COUNTY OF ALBEMARLE
Department of Community Development
REVISED APPLICATION SUBMITTAL
This form must be returned with your revisions to ensure proper tracking and distribution. County
staff has indicated below what they think will be required as a resubmission of revisions. If you need to
submit additional information please explain on this form for the benefit of the intake staff. All plans
must be collated and folded to fit into legal size files, in order to be accepted for submittal.
TO:
DATE:
PROJECT NAME: ARB- 2007 -95: Flow Maintenance Building
Submittal Type Requiring Revisions ( ) indicates submittal Code
County Project Number
# Copies
Erosion & Sediment Control Plan (E &S)
# Copies
Distribute To:
Mitigation Plan (MP)
2
M. Maliszewski
Waiver Request (WR)
Stormwater Management Plan (SWMP)
Road Plan (RP)
Private Road Request, with private /public comparison
(PRR)
Private Road Request — Development Area (PRR -DA)
Preliminary Site Plan (PSP)
Final Site Plan (or amendment) (FSP)
Final Plat (FP)
Preliminary Plat (PP)
Easement Plat (EP)
Boundary Adjustment Plat (BAP)
Rezoning Plan (REZ)
Special Use Permit Concept Plan (SP -CP)
Reduced Concept Plan (R -CP)
Proffers (P)
Bond Estimate Request (BER)
Draft Groundwater Management Plan (D -GWMP)
Final Groundwater Management Plan (F -GWMP)
Aquifer Testing Work Plan (ATWP)
Groundwater Assessment Report (GWAR)
Architectural Review Board (ARB)
ARB- 2007 -95
2
Other: Please explain
(For staff use only)
Submittal Code
# Copies
Distribute To:
Submittal Code
# Copies
Distribute To:
ARB
2
M. Maliszewski