Loading...
HomeMy WebLinkAboutARB200800035 Action Letter 2008-05-29COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 May 30, 2008 Anhold Associates c/o David Anhold 8311 Rockfish Gap Trnpk Greenwood VA 22943 RE: ARB- 2008 -35: Innovation Drive /Entrance Improvements Tax Map 32, Parcel 6A Dear Mr. Anhold: The Albemarle County Architectural Review Board reviewed the above noted item at its meeting on Monday, May 5, 2008. The Board unanimously approved the request, pending staff administrative approval of the following conditions: 1. Revise Sheet S -2 Site Plan and Sheet L -1 Landscape Plan by labeling the entry road as Innovation Drive. 2. Revise Sheet S -3 Site Details by removing the handrail from the retaining wall detail. 3. Revise the labeling on Sheet S -2 to correctly indentify the detail for the in- ground, landscape accent lights as Detail 04. 4. Revise Sheet L -1 Landscape Plan to show the proposed Black Gum trees at a spacing of 20' on center. 5. Provide a luminaire schedule indicating all lighting options chosen and the number of lumens emitted by all proposed fixtures. Revise the site plan, as needed, to demonstrate that the decorative lighting proposal meets the established Entrance Corridor Guidelines. All lighting information, including additional notes and lighting cutsheets, is to be included in the site plan drawing documents. Add notes to the site plan to address Decorative Lighting Guidelines b, c, d, and g list below. Guidelines for the Use of Decorative Landscape Lighting All outdoor light fixtures used for decorative effect: a. Shall be compatible with the character of the EC in terms of design, use, size, color and brightness. b. Impact only the immediate site. The effect of the illumination should not be discernible from distances along the EC. c. Shall be extinguished between the hours of 11 PM and dawn. d. Shall be cutoff luminaires aimed so as not to project their output beyond the objects intended to be illuminated; or non - cutoff luminaires equipped with shielding to meet the following criteria: "Light distribution from all lighting installations shall be cut -off at all angles beyond those required to restrict direct illumination to within the perimeter of the landscape feature being illuminated." e. Shall never exceed 3000 lumens. f. Shall achieve an incandescent effect. g. Shall not be modified to reflect seasonal colors. h. Shall be of a number that is compatible with the scale of the object and the development to be illuminated, such that the light emitted will not over - illuminate or overpower the site. i. Glare control for light fixtures used for decorative effect shall be achieved primarily through the use of cutoff fixtures, shields and baffles, and appropriate application of mounting height, wattage, aiming angle, fixture placement, etc. 6. Revise Sheets S -2 Site Plan and L -1 Landscape Plan by removing all grading proposed within the drip line of existing trees that are to remain. Revise both sheets to show all proposed tree protection at the drip line of the tree. Include the Erosion Control Plan, with a detail of the proposed tree protection, in the next submission. 7. The elevations of the bottom of the wall, particularly at the west end, and the top of the wall should be confirmed per drawing S -2 or amend the drawing to show approximately 9" of stone wall on the west end. Please provide: 1. Two full sets of revised drawings addressing each of these conditions. Include updated ARB revision dates on each drawing and an ARB approval signature panel. 2. A memo including detailed responses indicating how each condition has been satisfied. If changes other than those requested have been made, identify those changes in the memo also. Highlighting the changes in the drawing with "clouding" or by other means will facilitate review and approval. 3. The attached "Revised Application Submittal" form. This form must be returned with your revisions to ensure proper tracking and distribution. When staff's review of this information indicates that all conditions of approval have been met, a Certificate of Appropriateness may be issued. If you have any questions, please do not hesitate to contact me. Sincerely, Brent Nelson Landscape Planner Cc: University Of Virginia Foundation P O Box 400218 Charlottesville, Va 22904 COUNTY OF ALBEMARLE Department of Community Development REVISED APPLICATION SUBMITTAL This form must be returned with your revisions to ensure proper tracking and distribution. County staff has indicated below what they think will be required as a resubmission of revisions. If you need to submit additional information please explain on this form for the benefit of the intake staff. All plans must be collated and folded to fit into legal size files, in order to be accepted for submittal. TO: Brent Nelson DATE: PROJECT NAME: ARB- 2008 -35: Innovation Drive /Entrance Improvements Submittal Type Requiring Revisions ( ) indicates submittal Code County Project Number # Copies Erosion & Sediment Control Plan (E &S) # Copies Distribute To: Mitigation Plan (MP) 2 Brent Nelson Waiver Request (WR) Stormwater Management Plan (SWMP) Road Plan (RP) Private Road Request, with private/ public comparison (PRR) Private Road Request — Development Area (PRR -DA) Preliminary Site Plan (PSP) Final Site Plan (or amendment) (FSP) Final Plat (FP) Preliminary Plat (PP) Easement Plat (EP) Boundary Adjustment Plat (BAP) Rezoning Plan (REZ) Special Use Permit Concept Plan (SP -CP) Reduced Concept Plan (R -CP) Proffers (P) Bond Estimate Request (BER) Draft Groundwater Management Plan (D -GWMP) Final Groundwater Management Plan (F -GWMP) Aquifer Testing Work Plan (ATWP) Groundwater Assessment Report (GWAR) Architectural Review Board (ARB) ARB2008 -0035 Other: Please explain (For staff use only) Submittal Code # Copies Distribute To: Submittal Code # Copies Distribute To: ARB 2 Brent Nelson