Loading...
HomeMy WebLinkAboutSDP200800081 Review Comments Minor Amendment 2008-07-22� OF AL ,. vIRGI1`IZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: J.W. Townsend Landscaping Improvements — Minor Amendment [SDP200800081] Plan preparer: Jim Taggart, TCS Engineering [fax 361 -1216] Owner or rep.: J.W. Townsend [email jay @townsendlandscape.com] Plan received date: 27 May 2008 Date of comments: 21 Jul 2008 Reviewer: Amy Pflaum, Current Development Review Engineer A. Minor Site Plan Amendment 1. Easements or letters of intent are required for off -site work. It appears that temporary grading and construction easements will be necessary from TMP's 32 -6A and 32 -22B1. Please submit easement documents for all new easements or demonstrate that these easements are not necessary. 2. All slopes steeper than 3:1 will require non - grassed low maintenance ground cover, please specify with a note on the plan. [DM] 3. In the Albemarle County Development Area, curbing is required on all parking areas and travelways with VDOT designations (CG -2, CG -6). 4. Although labeled as 8.25% on the plan, the portion of the proposed travelway uphill of the two new parking areas is graded at 20 %. Travelways should not exceed a 10% grade. 5. A guardrail with VDOT designations (GR -2, GR -2a, etc.) is required next to parking or travelways adjacent to retaining walls or drop -offs of greater than 4 feet, with start and end sections labeled. [18- 32.7.2] 6. An Erosion & Sediment Control Plan and Stormwater Management Plan are required. Please submit along with a Water Protection Ordinance application. Comments #7 -16 will need to be addressed with the WPO. Please show the limits of the drainage area to the proposed stormwater management pond and sub- areas to the culverts. 8. Please provide culvert computations for the two proposed culverts under the travelway. 9. Please include the acreage of disturbance in the project description of the narrative. 10. Please provide a cross section detail of the proposed pond. 11. The pond is sized as a detention facility, but no outlet structure is shown. Please provide details and sizing calculations for the outlet structure. 12. Please address the stormwater management of the concentrated run -off from the proposed pond. Identify the adequate channel from this site. It appears a drainage easement may be needed from TMP 32 -22B 1. 13. A stormwater management easement is required around the proposed pond and any associated Albemarle County Community Development Engineering Review Comments Page 2 of 2 structures. 14. Please provide for vehicle access to the proposed pond. Access must be graded to 10' width and less than 20% grade, gravel surface or better is required for grades over 10 %. Please provide a minimum 10' wide permanent easement over the access. 15. A SWM bond amount will be computed by the County once the WPO plans have been approved. A completed copy of the standard stormwater maintenance agreement and fee for recordation for any stormwater management facilities will be required. [17 -304E] 16. An E &S bond amount will be computed by the County once the WPO plans have been approved. \\ Cob- dts01 \cityviewlnk\Docs\2008 \SDP \SDP200800081 J.W. Townsend\E1_mia, swm_ADP_JWTownsend.doc