COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Memorandum
To: Ammy George, Timmons Group
From: Lisa Glass, Principal Planner �
Division: Zoning and Current Development
Date: June 19. 2008
Subject: SDP 08 -56: Wickham Pond. Phase II, Block 2: Final Site Plan
June 4, 2008 Revised Plan
The Albemarle County Department of Community Development, Current Development planner has
reviewed the site plan referenced above. The plan may be granted tentative approval from the Current
Development Planner when the following items have been satisfactorily addressed.
The Site Plan continents below are from the Current Development Planner only. Please continue to work
with each reviewer for all Tentative Approvals.
The May 2, 2008 Planner comments have mostly been addressed, except the four below. Please address
these four concerns and send a plan to Bill Fritz. Final review of these items will allow the Current
Development Planner to grant tentative approval.
Comment 7: Please confirm that underground parking garage will have a hard
surface (pavedtconcretelhard surface pavers); please add a note to the plan.
Comment 11: Flow many of the parallel spaces are "off-site" on block I' ' Refer to the Timmons letter
submitted June 4, 2008, "Clarification of Changes: Wickham Pond ph 2 blocks 1 & 2 "; Item 1 discusses
parallel parking on block 1, to be used in the parking calculation for block 2.
Please check the parking space count to see if any spaces for block 2 are on block 1; Add a note on the
parking schedule to clarify where the parallel parking for block 2 is located (if off -site, say so; if on -site,
note not needed).
Comment 13: the lighting note states full cut off and not more that .5 fc at PL or street.... okay. However,
by section 4.17 we need either a photometric plan or a statement that no lights >3000 lumens to be
installed.
Comment 15: Engineering will want to look at the size for the holding tank for sump/grinder pump to
remove drainage from the underground garage.
As well as providing vehicular access to the pump for maintenance.
Please discuss with Engineering reviewer.
I will not be available to answer questions, but since we discussed them today I hope you have no
problem adding three notes and working with Engineering for the last item on my list. Tentative
approvals must be obtained from all reviewers prior to final plan approval. Good Luck.