Loading...
HomeMy WebLinkAboutSDP200800072 Review Comments Final Site Plan and Comps. 2008-06-06 (3)*-&A County of Albemarle Department of Community Development Memorandum From: Max Greene, Current Development engineering review Date: 9 June 2008 Subject: Old Trail Village Block 15 and part of 31 (SDP200800072) The preliminary site plan has been reviewed. Engineering can recommend approval when the following comments have been addressed: 1. Suffounding topography and adjaeent drainage areas do not appear- to mateh the euffent existin eonditions of the site area. Please update the existing eonditions for- an adequate F-eview of the SVOW and stofm drainage systems. [19 32.6.6, 14 302] , (Item appears addressed) 2. Sheet E 1 does not show the loeation of bloek 31 of portion there of. Please update to show the bloeks as approved on the mastef plan. (Item appears addressed) 3. , " (Item appears addressed) 4. ] (Item appears addressed) 5. . (Item appears addressed) 6. VDOT approval will be required prior to final approval. (To be addressed with final plan) 7. Drainage computations need review for accuracy. Several places in the drainage computations do not appear to match drainage areas as shown. Complete engineering review was not possible at this time. Additional comments may be forthcoming once all computations and maps are congruent. (Item appears addressed) 8. Seouf pr-oteetion is missing fr-ofn stoffnwater- outlets. Please size the outlet pr-oteetion per- VDO Standards. (Item appears addressed) 9. Drainage computations show several storm spreads over 10' and will need to be reduced to below 10' of spread. (Does not appear adequately addressed with this submittal and will be addressed with final plan) 10. (Item appears addressed) 11. Stor-mwaef p! i i i _ oeffleients, time of eoneenqufion, and aer-eage for- eaeh drainage area as used in the eomputations for- both existing and proposed area maps. Make sure they fnateh the (Item appears addressed) 12. . (Item appears addressed) 13. Cross dr-ain loeations with VDOT designations at eveimy majof eut of fill transition of sag eur-ve a (Item appears addressed) 14. . (Item appears addressed) 15. Please show Stormwater management easements encompassing all structures, access easements and 100 -year high water mark/level. (Does not appear adequately addressed with this submittal and will be addressed with final plan) 16. (Item appears addressed) 17. A cut -off trench of a minimum 4' wide, 4' deep and minimum 1:1 slope will be shown clearly on the plan detail. (Does not appear adequately addressed with this submittal and will be addressed with final plan) 18. A completed copy of the standard stormwater maintenance agreement and fee for recordation for the Albemarle County Community Development Engineering Review comments Page 2 of 2 stormwater facility is required prior to final approval. [17-304E] (To be addressed with final plan) 19. We will provide the pro rata share cost for water quality control for Licking Hole Drainage Basin. [ 17 -316] (To be addressed with final plan) 2o. Additional Comments will be forthcoming due to the information submitted and required additions and /or changes to the submittal.