HomeMy WebLinkAboutWPO200600050 Review Comments Erosion Control Plan 2008-07-16�pF .AI,g COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Northtown Center (SPD200600061, WP0200600050) Plan preparer: Mr. Tim Miller, PE, DDR [email: tmiller @ddrva.com] Owner or rep.: Mr. Wendell Wood, First Gold Leaf Land Trust [fax: 434.975.0267] Plan received date: 27 Jun 2006 (final site plan) 25 Sep 2006 (swm plan, e &s plan, date 21 Sep 2006) Rev. 1: 22 Sep 2006 (final site plan only, rev. date 21 Sep 2006) Rev. 2: 28 Feb 2007 (final site plan rev. date 22 Jan 2007) 22 Feb 2007 (swm plan rev. date 22 Jan 2007) 19 Mar 2007 (e &s plan rev. date 13 Mar 2007) Rev. 3: 20 June 2007 (plan rev. date 04 & 15 June 2007) Rev4: 30 Oct 2007 (fsp, rp, esc, swm) Revs: 18 Mar 2008 (fsp, rp, esc, swm) Rev6: 25 Apr 2008 (fsp, esc, swm) Rev7: 09 June 2008 (fsp, esc, swm) Date of comments: 5 Aug 2006 (final site plan only) 17 October 2006 (swm plan, e &s plan) Rev. 1: 16 Oct 2006 (final site plan) Rev. 2: 25 Mar 2007 (final site plan, swm plan, e &s plan) Rev. 3: 02 August 2007 Rev4: 04 Jan 2007 (fsp, rp, esc, swm) Revs: 09 Apr 2008 (fsp, rp, esc, swm) Rev6: 23 May 2008 (fsp, esc, swm) Rev7: 16 July 2008 (fsp, esc, swm) Reviewer: Glenn Brooks Rev. 1: Allan Schuck Rev. 2: Allan Schuck, Glenn Brooks, Tamara Ambler Rev. 3: Allan Schuck Rev4,5,6,7: Jonathan Sharp A. Final site plan All comments have been addressed. B. Stormwater Management and Mitigation Plan Please provide adequate details for the Contech Stormfilter System on the plans. Please include details of the system, inverts, etc. so that the contractor can install the system properly. Stormwater Bond amounts will be computed by the County once the plans have been approved. C. Erosion Control Plan (comments taken from Final Site Plan approval conditions) 1. Approval of an Erosion and Sediment Control plan to include: a. Comprehensive proposals to ensure adequate Erosion and Sediment Control measures remain effective during the transitions between phases of construction. Engineering Review Comments Page 2 of 2 Rev7: The site remains unprotected between phases A and B and between phases B and C of the proposed ESC plans. Engineering staff has provided an example plan which would adequately satisfy ESC requirements and waiver conditions. The plans and calculations have been attached with this email ( NTC _ESC_PhaseA_final_scaled.pdf, NTC_ESC_PhaseB_final _ scaled.pdf, Northtown Center Sediment Basin calcs.pdf). The plans (attached sheets A and B) can act as the phasing plans for ESC and would replace the current proposed phasing plan (sheets E2, E3, and E4). The attached plans are to scale and can be printed out on Arch E (4' wide by 3' tall) paper. Note the following on the provided plans: • The plans have been consolidated to 2 phases. • Sediment trap 1 has been eliminated and a basin has been installed • The original Sediment Basin 1 has been enlarged to provide adequate perimeter control. • MS -19 improvement information has been provided on the ESC plans. b. More detailed information regarding the proposed flocculants, including application locations, installation and maintenance schedules as they relate to the construction phases, and manufacturers' specifications and details. Rev7: Comments addressed. The flocculant information package received by Pat Enright on June 26 adequately addresses this comment. The package will be included with the ESC plans. 2. State and Federal permits for on -site stream disturbance is required prior to ESC approval. 3. ESC Bond amounts will be computed by the County once the plans have been approved. D. Road Plans for State Route 29 Frontage Improvements All comments have been addressed. A road bond is not required for site plan approval.