Loading...
HomeMy WebLinkAboutWPO200800043 Review Comments Bond Estimate 2008-06-06BOND ESTIMATE - EROSION CONTROL Spreadsheet last revised:12 -5 -01 PROJECT NAME: Tire and Auto Center- Pantops PROJECT NUMBER: WPO- 2008 -00043 DATE OF ESTIMATE: 06/06/08 ESTIMATE BY: ADL BASED ON: ESC plan dated 5/28/08 WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 0.343 1500 514.5 SILT FENCE LF 0 5 0 SAFETY FENCE LF 700 3 2100 TEMPORARY FILL DIVERSION LF 0 3 0 DIVERSION DIKE LF 550 3 1650 TEMPORARY SLOPE DRAIN LF 0 20 0 SEDIMENT TRAP 1 ACRES 0 1000 0 SEDIMENT BASIN 1 ACRES 0 1000 0 CULVERT INLET PROTECTION EA 0 500 0 INLET PROTECTION EA 0 200 0 OUTLET PROTECTION EA 0 200 0 EC -2 & 3 DITCH PROTECTION LF 0 10 0 RIP -RAP LF 0 55 0 CHECK DAMS SQ.YD. 0 30 0 PAVED CONSTRUCTION ENTRANCE EA 1 2000 2000 SUBTOTAL 6264.50 CONTINGENCY & ADMINISTRATION LS 25% 1566.13 TOTAL 7830.63 BOND AMOUNT REQUIRED 8000