Loading...
HomeMy WebLinkAboutWPO200800064 Review Comments Erosion Control Plan 2008-07-23� OF AL ,. vIRGI1`IZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: WPO- 2008 - 00064, Hyland Ridge off site sewer improvements,ESC Plans Plan preparer: WW Associates Owner or rep.: Southern Development — Keith Lancaster Plan received date: June 9, 2008 Date of comments: July 22, 2008 Reviewer: Andrew Lowe The erosion and sediment control plan for Hyland Ridge off site sewer improvements, submitted on June 9, 2008, has been reviewed. The plans cannot be approved as submitted and will require the following changes /corrections prior to final approval. Engineering is available from 2 -4 PM on Thursdays to discuss these review comments. Please note that the County is continuing to update the Design Manual [DM]. The latest version of the DM and Engineer Review Final Plan Checklist can be downloaded from the County's website under the subtitle "Design Standards ". A. Erosion Control Plan (WPO- 2008 - 00064) 1. ESC approval cannot be granted until we receive copies of signed and recorded deeds of easements for each property associated with the project. [DM] 2. Show location of the Construction Entrance on the plan. 3. Provide Utility Stream Crossing per Std. and Spec. 3.25 VESCH. 4. I am unclear if the DD and LS shown on sheet 10 will be permanent? a. If the DD is temporary please change the LS to OP outlet protection. [3.18] b. Please provide permanent conveyance for the concentrated flow coming through the site at the fill location. [MS -8] c. Show permanent grading necessary at the sediment trap and fill slope to continue the existing channel above the fill slope to the existing channel below the fill slope. 5. Show low- maintenance ground cover for the 2:1 slopes. 6. Provide additional controls below the fill at the existing pond. 7. An Erosion and Sediment Control bond will be computed by the County once the plans are approved. 8. As a note this project will need a VSMP permit from DCR, Matthew Grant at 804 - 225 -3068 can assist with questions. 9. Additional review comments may come on the next plan submittal due to the required changes. File: El_esc_ADL_WPO- 2008 -00064 - Hyland Ridge off site sewer improvements Ldoc