Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO200700071 Review Comments Bond Estimate 2008-06-10
BOND ESTIMATE - EROSION CONTROL Spreadsheet last revised:12 -5 -01 PROJECT NAME: Camp Holiday Trails waterline PROJECT NUMBER: WPO- 2007 -00071 DATE OF ESTIMATE: 06/10/08 ESTIMATE BY: ADL BASED ON: plan received June 10, 2008 WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 2.18 1500 3270 SILT FENCE LF 4820 5 24100 SAFETY FENCE LF 0 3 0 TEMPORARY FILL DIVERSION LF 0 3 0 DIVERSION DIKE LF 0 3 0 TEMPORARY SLOPE DRAIN LF 0 20 0 SEDIMENT TRAP 1 ACRES 0 1000 0 SEDIMENT BASIN 1 ACRES 0 1000 0 CULVERT INLET PROTECTION EA 0 500 0 INLET PROTECTION EA 0 200 0 OUTLET PROTECTION EA 0 200 0 EC -2 & 3 DITCH PROTECTION LF 0 10 0 RIP -RAP LF 0 55 0 CHECK DAMS SQ.YD. 15 30 450 PAVED CONSTRUCTION ENTRANCE EA 2 2000 4000 SUBTOTAL 31820.00 CONTINGENCY & ADMINISTRATION LS 25% 7955.00 TOTAL 39775.00 BOND AMOUNT REQUIRED 40000