HomeMy WebLinkAboutWPO200800018 Review Comments Erosion Control Plan 2008-07-150
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project:
Free Union Country School [SDP20080003 L WPO2008000181
Plan preparer:
Hunter McCardle [email: hnecardle a:mekeecarson.comj
Plan received date:
26 Feb 2008
21 Apr 2008 (Rev])
16 June 2008 (Rev2)
Date of comments:
02 Apr 2008
03 June 2008 (Rev])
15 July 2008 (Rev2)
Reviewer:
Jonathan Sharp
A. Minor Amendment
All Engineering comments have been addressed. The Minor Amendment must be approved by all
agencies before construction can begin. Contact the Lead Planner for this project, Megan Yaniglos, for
more information.
B. Stormwater Management Plan
All comments have been addressed. The SWM bond is set at $18,000. The bond must be posted
before construction can begin. Three (3) copies of the SWM plans are needed for Engineering files.
C. Erosion and Sediment Control Plan
All comments have been addressed. The ESC bond is set at $12,000. The bond must be posted
before construction can begin. Four (4) copies of the ESC plans and narratives are needed for Engineering
files.