Loading...
HomeMy WebLinkAboutWPO200700003 Review Comments Bond Estimate 2008-06-18 (3)BOND ESTIMATE - EROSION CONTROL Spreadsheet last revised:12 -5 -01 PROJECT NAME: White Gables Pavilion 2 & 4 - Phase 4B PROJECT NUMBER: WPO200700003 DATE OF ESTIMATE: 06/18/08 ESTIMATE BY: MRG BASED ON: Approved Plan WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 2.5 1500 3750 SILT FENCE LF 420 5 2100 TREE PROTECTION FENCE LF 650 3 1950 TEMPORARY FILL DIVERSION LF 0 3 0 DIVERSION DIKE LF 500 3 1500 TEMPORARY SLOPE DRAIN LF 0 20 0 SEDIMENT TRAP 1 ACRES 1.1 1000 1100 SEDIMENT BASIN 1 ACRES 0 1000 0 CULVERT INLET PROTECTION EA 0 500 0 INLET PROTECTION EA 6 200 1200 OUTLET PROTECTION EA 3 200 600 EC -2 & 3 DITCH PROTECTION LF 0 10 0 RIP -RAP LF 40 55 2200 CHECK DAMS SQ.YD. 0 30 0 PAVED CONSTRUCTION ENTRANCE EA 1 2000 2000 SUBTOTAL 16400.00 CONTINGENCY & ADMINISTRATION LS 25% 4100.00 TOTAL 20500.00 BOND AMOUNT REQUIRED 20500.00