HomeMy WebLinkAboutARB200800056 Review Comments Preliminary Site Plan 2008-06-19COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
June 18, 2008
NBJ Architecture
c/o Neil Bhatt
11537 -B Nuckols Road
Glen Allen VA 23059
RE: ARB2008 -00056 Airport Road Office Plaza
Tax Map 32, Parcel 41 E
Dear Mr. Bhatt:
The Albemarle County Architectural Review Board, at its meeting on June 2, 2008, completed a
preliminary review of the above -noted request to construct a 60,710 sf, 3 -story office building with rear
parking. The Board offered the following comments for the benefit of the applicant's next submittal. Please
note that the following comments are those that have been identified at this time. Additional comments
may be added or eliminated based on further review and changes to the plan.
1. Revise Sheet C2 Existing Conditions, Sheet C3 Conceptual Plan, and Sheet C -4 Conceptual Erosion and
Sediment Control Plan by labeling the existing and proposed tree lines.
2. Revise Sheet C5 Conceptual Landscape Plan to show all proposed EC street trees at a maximum
spacing of 35' on center, with flowering ornamental trees interspersed amongst them. This would require
the relocation of the 4 bays of parking shown adjacent to the Airport Road right -of -way, between the
proposed Everclear Chinese Elm trees.
3. Revise Sheet C5 Conceptual Landscape Plan to consistently show trees 40' on center along the perimeter
of the entire parking area.
4. Provide design details, clearly indicating proposed materials, colors, and dimensions, of the water feature.
Drawings provided should clearly indicate whether or not the applicant is proposing to light the water
feature.
5. Revise the building elevations to indicate the proposed color of the pergola structure. Provide a sample of
the color. Revise Sheet A502 Elevations by providing details, including color, of the proposed railing
around the pergola. The applicant indicated that the pergola would match the trim color (either the white
colors if EIFS is used, or the grey colors if Alucobond panels are used).
6. Revise the title of all site plan drawings to state Final Site Plan.
7. Revise the drawing date on all architectural drawings to reference the year 2008.
8. Provide Sheet 2 of 2 of the Photometric Plan.
9. Revise all applicable site plan drawings to reference the correct building heights, as shown on the current
set of architectural elevations.
10. Revise all applicable site plan drawings to correspond correctly with all the information presented in the
revised drawing Conceptual Plaza Landscape Design (received 5/12/08).
11. Revise Sheet C5 Conceptual Landscape Plan to include the proposed plant list.
12. Revise the building drawings to show a method of concealing EC views of the rooftop mechanical
equipment that integrates the accessory structures and equipment into the overall design of the building,
displaying a compatibility with the architecture. The architecture, not a rooftop screen, should conceal
views of the rooftop equipment.
13. Clarify the building elevations to show that the color selection will be either a pairing of the grey colors or a
pairing of the white colors.
14. Revise the design of the sidewalk connection, between the proposed plaza and the existing sidewalk at
the right -of -way, by incorporating a design using a radius connection at both ends. The end result should
be a sidewalk that provides a better transition of design between the plaza and the existing sidewalk.
15. Revise Sheet C5 -1 Conceptual Plaza Landscape Plan to indicate all proposed materials and colors for the
plaza and water feature. Provide samples of proposed materials and colors.
16. Revise Sheet C7 Conceptual Details to indicate the color of the proposed gates to the dumpster
enclosure; a color to blend with the brick of the enclosure or to match the grey of the building (if the grey
color scheme is selected) is preferred.
17. Revise Sheet C7 Conceptual Details by showing the signature of the owner, or the owner's representative,
on the Tree Conservation Checklist.
18. Revise Sheet C4 Conceptual Erosion and Sediment Control Plan to include a detail of the method of tree
protection proposed.
19. Revise Sheet C5 Conceptual Landscape Plan to show the location of all proposed lighting, including pole
lighting. Revise the pole lighting locations, as needed, to avoid conflicts with proposed trees. Add the
following note to the drawing All site plantings of trees and shrubs shall be allowed to reach, and be
maintained at, mature height, the topping of trees is prohibited. Shrubs and trees shall be pruned
minimally and only to support the overall health of the plant
20. Revise the photometric set of drawings to include a full size sheet displaying cutsheets of all proposed
lighting. Make sure the cutsheets are legible. Revise the Luminaire Schedule to indicate the proposed
color /finish of all fixtures and poles; black or bronze is preferred. Revise the lighting note on Sheet C1
Cover Sheet to state Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens
shall be a full cutoff luminaire. The spillover of lighting from luminaires onto public roads and property in
residential or rural areas zoning districts shall not exceed one -half foot - candle.
21. Revise the photometric plan by eliminating the use of the Tharos Light Column proposed in the plaza.
Provide an alternate light fixture that meets full cutoff requirements, in a more conventional style, providing
the needed transition in style between the modern appearance of the building and the traditional nature of
the EC. A bollard style light is preferred as opposed to a tall lamp post.
22. Provide sections of the roof and equipment in relation to the Entrance Corridor. Provide all details,
including colors and materials, for the proposed roof screening.
23. Indicate possible signage locations to avoid conflicts with landscaping and architecture.
You may submit your application for continued ARB review at your earliest convenience. Application forms,
checklists and schedules are available on -line at www.albemarle.ora /olannina.
Revised drawings addressing the comments listed above are required. Include updated ARB revision dates on
each drawing and an ARB approval signature panel. Please provide a memo including detailed responses
indicating how each comment has been addressed. If changes other than those requested have been made,
identify those changes in the memo also. Highlighting the changes in the drawing with "clouding" or by other
means will facilitate review and approval.
If you have any questions concerning any of the above, please feel free to call me.
Sincerely,
Brent Nelson
Landscape Planner
Cc: Airport Road Office Plaza LLC
102 South First Street Suite 301
Charlottesville, Va 22902
ARB FILE