Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO200800014 Review Comments Bond Estimate 2008-06-24
Erosion Control Bond Estimate Project Name: Old Trail Block 3 Pool Lot Project Number: WPO- 2008 -00014 Date of Estimate: June 24, 2008 Estimated By: Samuel Brownfield Item Quantity of Unit Unit Cost Item Total seed, fertilize, mulch 12.8 acre $ 1,500.00 $ 19,185.00 silt fence 964.0 linear foot $ 5.00 $ 4,820.00 safety fence 435.0 linear foot $ 3.00 $ 1,305.00 temporary fill diversion 0.0 linear foot $ 3.00 $ - diversion dike 950.0 linear foot $ 3.00 $ 2,850.00 temporary slope drain 0.0 linear foot $ 20.00 $ - sediment trap 1 1.0 acre $ 1,000.00 $ 1,000.00 sediment basin 1 5.9 acre $ 1,000.00 $ 5,870.00 sediment basin 2 6.2 acre $ 1,000.00 $ 6,160.00 culvert inlet protection 0 each $ 500.00 $ - inlet protection 15 each $ 200.00 $ 3,000.00 outlet protection 5 each $ 200.00 $ 1,000.00 EC -2 & 3 ditch protection 0.0 linear foot $ 10.00 $ - rip -rap 0.0 linear foot $ 55.00 $ check dams 0.0 square yard $ 30.00 $ - paved construction entrance 1 each $ 2,000.00 $ $ 2,000.00 47,190.00 Subtotal 25% Contingency $ 11,797.50 Total $ 58,987.50 Bond Total $ 59,000.00