RE: ARB2008 -00057 Moser Radiation Therapy Center — 2 "d Vault Addition
Tax Map 59, Parcel 23C
Dear Ms. George:
The Albemarle County Architectural Review Board, at its meeting on June 2, 2008, completed a
preliminary review of the above -noted request install a second concrete vault of approximately 3,400
square feet at the existing Moser outpatient center. The Board offered the following comments for the
benefit of the applicant's next submittal. Please note that the following comments are those that have
been identified at this time. Additional comments may be added or eliminated based on further review and
changes to the plan.
1. Revise and coordinate all drawings to show ground equipment located behind the addition.
2. Provide details regarding the proposed rooftop equipment. Show how visibility of the rooftop equipment
from the EC will be eliminated.
3. Add the following note to the architectural and site plans: "Equipment shall not be visible from the
Entrance Corridor."
4. Revise the footprint of the addition on the site plan to match the architectural elevations.
5. Provide plants in the area where the south end of the addition is set back from the north end.
6. Submit the east elevation of the addition for review.
7. If trees can't be planted on the east side of the addition, explore the possibility of planting shrubs in this
area.
8. Revise the EC trees to 31/2" caliper at planting.
9. Move the proposed red maple tree so that it does not conflict with the conduit.
10. Provide the planting plan, with the plant schedule, as part of the site plan set.
11. Revise the biofilter planting to include a majority of evergreen plants, 24" high at planting.
12. Identify the proposed location for the relocated lamp on the plan. Submit a photometric plan, cut sheets for
the new fixtures and fixtures to be relocated, and luminaire schedule identifying all lighting options. Include
the cut sheets on one of the lighting plan sheets.
13. Blankness must be addressed architecturally and with additional plantings.
14. Pursue the removal of the telephone pole.
You may submit your application for continued ARB review at your earliest convenience. Application forms,
checklists and schedules are available on -line at www.albemarle.org /planning.
Revised drawings addressing the comments listed above are required. Include updated ARB revision dates on
each drawing and an ARB approval signature panel. Please provide a memo including detailed responses
indicating how each comment has been addressed. If changes other than those requested have been made,
identify those changes in the memo also. Highlighting the changes in the drawing with "clouding" or by other
means will facilitate review and approval.
If you have any questions concerning any of the above, please feel free to call me.
Sincerely,
Margaret Maliszewski
Principal Planner
Cc: Mike Vanderweide, UVA Facilities Planning & Construction
1224 W Main St Suite 500
Charlottesville, Va 22903
HKS Inc - Matt Franklin
2100 E Cary St Suite 100
Richmond VA 23223
Rectors & Visitors Of The University Of Virginia
P O Box 400726
Charlottesville Va 22904
Gerald Gatobu, Zoning and Current Development
ARB FILE