Loading...
HomeMy WebLinkAboutARB200800057 Review Comments Major Amendment, Preliminary Plan 2008-06-02COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 June 18, 2008 Timmons Group c/o Ammy George 919 2nd St SE Charlottesville, VA 22902 RE: ARB2008 -00057 Moser Radiation Therapy Center — 2 "d Vault Addition Tax Map 59, Parcel 23C Dear Ms. George: The Albemarle County Architectural Review Board, at its meeting on June 2, 2008, completed a preliminary review of the above -noted request install a second concrete vault of approximately 3,400 square feet at the existing Moser outpatient center. The Board offered the following comments for the benefit of the applicant's next submittal. Please note that the following comments are those that have been identified at this time. Additional comments may be added or eliminated based on further review and changes to the plan. 1. Revise and coordinate all drawings to show ground equipment located behind the addition. 2. Provide details regarding the proposed rooftop equipment. Show how visibility of the rooftop equipment from the EC will be eliminated. 3. Add the following note to the architectural and site plans: "Equipment shall not be visible from the Entrance Corridor." 4. Revise the footprint of the addition on the site plan to match the architectural elevations. 5. Provide plants in the area where the south end of the addition is set back from the north end. 6. Submit the east elevation of the addition for review. 7. If trees can't be planted on the east side of the addition, explore the possibility of planting shrubs in this area. 8. Revise the EC trees to 31/2" caliper at planting. 9. Move the proposed red maple tree so that it does not conflict with the conduit. 10. Provide the planting plan, with the plant schedule, as part of the site plan set. 11. Revise the biofilter planting to include a majority of evergreen plants, 24" high at planting. 12. Identify the proposed location for the relocated lamp on the plan. Submit a photometric plan, cut sheets for the new fixtures and fixtures to be relocated, and luminaire schedule identifying all lighting options. Include the cut sheets on one of the lighting plan sheets. 13. Blankness must be addressed architecturally and with additional plantings. 14. Pursue the removal of the telephone pole. You may submit your application for continued ARB review at your earliest convenience. Application forms, checklists and schedules are available on -line at www.albemarle.org /planning. Revised drawings addressing the comments listed above are required. Include updated ARB revision dates on each drawing and an ARB approval signature panel. Please provide a memo including detailed responses indicating how each comment has been addressed. If changes other than those requested have been made, identify those changes in the memo also. Highlighting the changes in the drawing with "clouding" or by other means will facilitate review and approval. If you have any questions concerning any of the above, please feel free to call me. Sincerely, Margaret Maliszewski Principal Planner Cc: Mike Vanderweide, UVA Facilities Planning & Construction 1224 W Main St Suite 500 Charlottesville, Va 22903 HKS Inc - Matt Franklin 2100 E Cary St Suite 100 Richmond VA 23223 Rectors & Visitors Of The University Of Virginia P O Box 400726 Charlottesville Va 22904 Gerald Gatobu, Zoning and Current Development ARB FILE