Loading...
HomeMy WebLinkAboutSP200800032 Review Comments Special Use Permit 2008-06-27Joan, The applicant for Central Virginia Recycling provided traffic data to me for the proposed site in May of 2008. The traffic projections included the following: • 50 Dump trucks per day • 10 tractor trailers per day • 10 employees per day. This makes 140 trips per day and along with the existing traffic on route 250 1 determined a right turn/deceleration lane was warranted but they were under the threshold for the left turn lane. After you and I discussed this traffic projection, I understand that there is a retail component to the site that does not appear to be included in the traffic projections that were provided to me in April. I will need the trips associated with the customers in order to properly re-evaluate the needs at this intersection. Thanks, Joel Joel DeNunzio, P.E. Staff Engineer 434-293-0011 Ext. 120 joel.denunzio@vdot.virginia.gov