Loading...
HomeMy WebLinkAboutARB200800002 Review Comments Miscellaneous Submittal 2008-06-27�F ALBz , �'IRGINI�' COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 218 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -583 June 27, 2008 Jo Chichester PB2 Architecture 710 Roselawn Rogers, AR 72756 -0000 RE: ARB- 2008 -02: Sam's Club #6365, General Remodel and Sign B200800407AC Dear Ms. Chichester, Fax (434) 972 -4126 I have reviewed the above -noted request. Regarding the sign, because the proposed sign will not be illuminated and otherwise meets the ARB design guidelines, I am able to review this proposal administratively for the ARB. I have approved a sign of the design outlined below. You may consider this letter your Certificate of Appropriateness for the sign. CANOPY SIGNS Type: Vinyl letters and graphic Mounting: Vinyl letters and graphic individually applied on canopy fascia Location: East elevation of canopy fascia, centered left to right and top to bottom, diamond graphic to the left of the text. Text: "Sam's CLUB®" Size: Letters: Sams's: 54.84" (W) x 20.51 "(H) CLUB: 31.17" (W) x 6.08" (H) Graphic: Overall size: Y -0" (W) x 2'- 4 "(H). Canopy Fascia: Sherwin Williams #SW 6811 Honorable Blue, flat matte finish. Graphics: 3M Sapphire Blue (Pantone 288); 3M Apple Green (Pantone 370); Vivid Blue (Pantone 2945); 3M Olympic Blue (Pantone 3005). Illumination: None Regarding the limited remodel, based upon sheets A2 "Exterior Elevations" latest revision date 6/23/08, we have determined that the proposed repainting of the building does not constitute a substantial change in design or material of the original development. For this reason, we have administratively reviewed your proposal. You may consider this letter your Certificate of Appropriateness for the repainting. This approval is predicated on the fact that the design and materials, as proposed and listed above, will be used. The acceptance of approval implies that the applicant has agreed to execute the design as indicated on the submittal items presented, and as listed above. Any changes in the approved sign or materials will require an amendment to the application and must be reviewed and approved by the Architectural Review Board. PLEASE NOTE THE FOLLOWING: 1. This approval does not include any window signs. If window signs are proposed, a separate application must be made, reviewed and approved by the Architectural Review Board. If you have any questions concerning any of the above, please feel free to call me. Sincerely, Brent Nelson Landscape Planner cc: ARB File Building Permit