Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO200700017 Review Comments Bond Estimate 2008-07-10
BOND ESTIMATE - EROSION CONTROL Spreadsheet last revised:12 -5 -01 PROJECT NAME: Wickham Pond Phase 2 Block 1 PROJECT NUMBER: WPO300700017 DATE OF ESTIMATE: July 10 2008 ESTIMATE BY: MRG BASED ON: Approved plan WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 12 1500 18000 SILT FENCE LF 3100 5 15500 SAFETY FENCE LF 1200 3 3600 TEMPORARY FILL DIVERSION LF 2300 3 6900 DIVERSION DIKE LF 0 3 0 TEMPORARY SLOPE DRAIN LF 0 20 0 SEDIMENT TRAP 1 ACRES 1.4 1000 1400 SEDIMENT TRAP 2 ACRES 2.3 1000 2300 SEDIMENT TRAP 3 ACRES 2 1000 2000 SEDIMENT BASIN 1 ACRES 4.75 1000 4750 SEDIMENT BASIN 2 ACRES 3.8 1000 3800 CULVERT INLET PROTECTION EA 0 500 0 INLET PROTECTION EA 35 200 7000 OUTLET PROTECTION EA 4 200 800 EC -2 & 3 DITCH PROTECTION LF 1100 10 11000 RIP -RAP LF 0 55 0 CHECK DAMS SQ.YD. 0 30 0 PAVED CONSTRUCTION ENTRANCE EA 1 2000 2000 SUBTOTAL 79050.00 CONTINGENCY & ADMINISTRATION LS 25% 19762.50 TOTAL 98812.50 BOND AMOUNT REQUIRED 98900.00