Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO200700091 Review Comments Bond Estimate 2008-07-14 (3)
BOND ESTIMATE - EROSION CONTROL PROJECT NAME: CTS Operations Facility PROJECT NUMBER: WPO200700091 DATE OF ESTIMATE: July 14 2008 ESTIMATE BY: Jonathan Sharp BASED ON: LF WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 6 1500 9000 TREE PROTECTION LF 1640 3 4920 SILT FENCE LF 3320 5 16600 SAFETY FENCE LF 0 3 0 TEMPORARY FILL DIVERSION LF 0 3 0 DIVERSION DIKE LF 420 3 1260 TEMPORARY SLOPE DRAIN LF 180 20 3600 SEDIMENT TRAP 1 ACRES 1 1000 1000 SEDIMENT BASIN 1 ACRES 4 1000 4000 CULVERT INLET PROTECTION EA 3 500 1500 INLET PROTECTION EA 47 200 9400 OUTLET PROTECTION EA 2 200 400 EC -2 & 3 DITCH PROTECTION LF 0 10 0 RIP -RAP LF 0 55 0 CHECK DAMS EA 2 200 400 PAVED CONSTRUCTION ENTRANCE EA 1 2000 2000 SUBTOTAL 54080.00 CONTINGENCY & ADMINISTRATION LS 25% 13520.00 TOTAL 67600.00 BOND AMOUNT REQUIRED 68000 last revised: 12-5-01