HomeMy WebLinkAboutWPO200800046 Review Comments Stormwater Management Plan 2008-07-22� OF AL
,. vIRGI1`IZP
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project: Old Trail Village Block 15 and part of 31 (SDP200800072)
Plan preparer: Collins Engineering - Scott Collins [fax (434) 987 -16311
Owner or rep.: March Mountain Properties LLC [fax (434) 245 -0300]
Plan received date: 9 June 2008
Date of comments: 22 July 2008
Reviewer: Max Greene
The Plans for Old trail Village Phase 1 Blocks 15 and a portion of 31 Last dated 2 June
2008 have received Engineering review. The plans may be approved after the following
items have been adequately addressed:
1. This single - family development should be submitted as a subdivision plan instead of a
site plan. Recommended for clarification incase a plat will be submitted for review and
approval.
2. VDOT approval will be required prior to final approval.
3. Drainage computations show several storm spreads over 10' and will need to be reduced
to below 10' of spread.
4. Please include design and calculations for all erosion and sediment control structures.
The two basins in the rear of the property must be constructed with this project for the
stormwater system to work.
5. Please show Stormwater management easements encompassing all structures, access
easements and 100 -year high water mark/level
6. A completed copy of the standard stormwater maintenance agreement and fee for
recordation for the stormwater facility is required prior to final approval.[17 -304E] The
forms and instructions can be found on the County Web site:
hqp:// www .albemarle.org /upload/images/ forms_ center / departments /community development/fo
rms / applications / Stormwater Management BMP Facilities_ Maintenance Agreement.pdf
hqp:// www .albemarle.org /upload/images/ forms_ center / departments /community development/fo
rms / applications / Stormwater Management BMP Facilities_ Maintenance Agreement Procedur
es.pdf
County will provide the pro rata share cost for water quality control for Licking Hole Drainage
Basin prior to final approval. [17 -316]
Additional Comments may be forthcoming due to the information submitted and required
additions and/or changes to the submittal.
File: E1_ESC,SWM,RP_MRG_0ld Trail Village Block 15, 3 1.doc
Engineering Review Comments
Page 2 of 2