Loading...
HomeMy WebLinkAboutWPO200800029 Review Comments Bond Estimate 2008-07-21BOND ESTIMATE - EROSION CONTROL Spreadsheet last revised:12 -5 -01 PROJECT NAME: Kirtley Warehouse Sanitary Sewer Extension PROJECT NUMBER: WPO200800029 DATE OF ESTIMATE: 07/21/08 ESTIMATE BY: MRG BASED ON: Approved plan WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 0.5 1500 750 SILT FENCE LF 1050 5 5250 SAFETY FENCE LF 0 3 0 TEMPORARY FILL DIVERSION LF 0 3 0 DIVERSION DIKE LF 0 3 0 TEMPORARY SLOPE DRAIN LF 0 20 0 SEDIMENT TRAP 1 ACRES 0 1000 0 SEDIMENT BASIN 1 ACRES 0 1000 0 CULVERT INLET PROTECTION EA 0 500 0 INLET PROTECTION EA 0 200 0 OUTLET PROTECTION EA 0 200 0 EC -2 & 3 Matting /slope stabilization LF 1050 10 10500 RIP -RAP LF 0 55 0 CHECK DAMS SQ.YD. 0 30 0 PAVED CONSTRUCTION ENTRANCE EA 1 2000 2000 SUBTOTAL 18500.00 CONTINGENCY & ADMINISTRATION LS 25% 4625.00 TOTAL 23125.00 BOND AMOUNT REQUIRED 23200.00