Loading...
HomeMy WebLinkAboutSDP200800073 Review Comments Preliminary Site Plan 2008-08-14COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 August 14, 2008 Nat Perkins NP Engineering 1850 Brown's Gap Tpke Charlottesville, VA 22901 RE: SDP2008 -73 Three Notch'd Center - Prelim Dear Mr. Perkins: The Department of Community Development hereby grants administrative approval to the above referenced site plan. The approval of the preliminary site plan is valid for (1) one year in accordance with Section 32.4.3.1 of Chapter 18 of the Albemarle County Code. Therefore, the preliminary approval shall expire on August 14, 2009. If the preliminary site plan approval expires, a new application must be filed and processed. Please address all of the requirements and conditions listed below and submit eight (8) tentative plan copies to the Department of Community Development. This letter must be submitted with the tentative plans, as a checklist, to document that you have addressed all requirements or conditions, or the tentative plan will be denied. Erosion and Sediment Control, BMP Stormwater Management, and road plans with the associated applications and fees must also be submitted with the eight (8) tentative Plans. Once the tentative plan is submitted and reviewed you will receive comments from all departments /divisions /agencies that have made comment on the tentative plan. Any further responses must be made directly to each department /division /agency that has further comment. After all aforementioned departments /divisions /agencies have granted a tentative approval, you must verify with the Planner that you may submit the final mylars (2 sets), two paper copies, the final site plan application, and final site plan fee to the Department of Community Development. Signing of the plans will occur within one week once it is determined that the final site plan mylars reflect all tentative approvals. The final site plan will be subject to all final site plan requirements (Zoning Ordinance Section 32.6), in addition to the following conditions. The Department of Community Development shall not accept submittal of the final site plan for signature until tentative approvals for the following conditions have been obtained: Zoning & Current Development approval to include: • All applicable items as specified in Section 32.6 of the ordinance. Please contact Summer Frederick at 296 -5832 if you have questions or require additional information. Enqineerinq approval to include: • The engineering review for current development needs to review and approve all applicable items as specified in the Design Standards Manual, before recommending approval to the final site plan. • Easements for grading and constructing the shared access must be granted from the owner of TMP 56 -67. • Easements and agreements for grading, access to and use of the stormwater detention pond must be granted from the owner of TMP 56A3 -7. • Verification that this pond has been designed to contain and treat run -off from this site, and is built per the standards of the Virginia Erosion and Sediment Control and Stormwater Management Handbooks. • An approved Water Protection Ordinance application. Please contact Amy Pflaum at 296 -5832 if you have questions or require additional information. Fire & Rescue approval to include: • Approval is subject to field inspection and verification. Please contact James Barber at 296 -5833 if you have questions or require additional information. ANY OTHER DEPARTMENT /DIVISION /AGENCY approval to include: • Architectural Review Board Certificate of Appropriateness required prior to final site plan approval. Please contact Margaret Maliszewski at 296 -5832 x.3276 if you have questions or require additional information. Sincerely, Summer Frederick Senior Planner Current Development File: SDP2008 -73 Three Notch'd Center - Preliminary Cc: Jo Higgins via email: MusxitPaol.com (August 19, 2008) 2