Loading...
HomeMy WebLinkAboutARB200700095 Review Comments Preliminary Site Plan 2008-08-05�'IRGINLP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4012 August 5, 2008 Scott Collins Collins Engineering 800 E. Jefferson Street Charlottesville, VA 22904 Peter Sheeran Sheeran Architects 226 East High Street Charlottesville, VA 22902 RE: ARB 2007 -95: Flow Auto — Maintenance Building Addition Dear Scott and Peter: I have reviewed the recent submittal for the above - referenced proposal, including site plans S -1 and LL -1 with revision date of 7/15/08; and E -1 with revision date of 10/29/07. I have the following comments: 1. The plants proposed for the planting strip located between parcels 14D and 15D are shown as proposed on both the showroom addition and maintenance building site plans. The plans must be coordinated, but only one plan should show the plants as proposed. Illustrate the plants on both plans. On one plan, include the plants in the plant list and make sure they are shown as "proposed" (i.e., use the heavier line weight). On the other plan, do not include the plants in the plant list, but add a note that makes it clear that they are a part of the other plan. 2. The scale identified for the floor plan is incorrect. Please check all sheets for accuracy of the identified scale and correct those that are wrong. 3. The footprint of the proposed new work differs between the architectural and site plans. The 39' dimensions on the site plan at the addition don't appear to relate to anything. The western 14' dimension on the site plan at the addition doesn't appear to be accurate. On the site plan, the layout of the island north of the addition doesn't match the island layout on the architectural plan. Please compare both sets of plans, double check the layout and all dimensions for all proposed work, and correct all the errors. Be sure the plans match. Please provide: 1. Two full sets of revised drawings addressing each of these conditions. Include updated ARB revision dates on each drawing and an ARB approval signature panel. 2. A memo including detailed responses indicating how each condition has been satisfied. If changes other than those requested have been made, identify those changes in the memo also. Highlighting the changes in the drawing with "clouding" or by other means will facilitate review and approval. 3. The attached "Revised Application Submittal" form. This form must be returned with your revisions to ensure proper tracking and distribution. When staff's review of this information indicates that all conditions of approval have been met, a Certificate of Appropriateness may be issued. If you have questions, feel free to contact me. Sincerely, Margaret Maliszewski Principal Planner cc: File Michael Wall, Flow Companies, Inc., via email �� OF ALg �'IRGINLP COUNTY OF ALBEMARLE Department of Community Development REVISED APPLICATION SUBMITTAL This form must be returned with your revisions to ensure proper tracking and distribution. County staff has indicated below what they think will be required as a resubmission of revisions. If you need to submit additional information please explain on this form for the benefit of the intake staff. All plans must be collated and folded to fit into legal size files, in order to be accepted for submittal. TO: DATE: PROJECT NAME: ARB- 2007 -95: Flow Maintenance Building Submittal Type Requiring Revisions ( ) indicates submittal code County Project Number # Copies Erosion & Sediment Control Plan (E &S) # Copies Distribute To: Mitigation Plan (MP) 2 M. Mahszewski Waiver Request (WR) Stormwater Management Plan (SWMP) Road Plan (RP) Private Road Request, with private /public comparison (PRR) Private Road Request — Development Area (PRR -DA) Preliminary Site Plan (PSP) Final Site Plan (or amendment) (FSP) Final Plat (FP) Preliminary Plat (PP) Easement Plat (EP) Boundary Adjustment Plat (BAP) Rezoning Plan (REZ) Special Use Permit Concept Plan (SP -CP) Reduced Concept Plan (R -CP) Proffers (P) Bond Estimate Request (BER) Draft Groundwater Management Plan (D -GWMP) Final Groundwater Management Plan (F -GWMP) Aquifer Testing Work Plan (ATWP) Groundwater Assessment Report (GWAR) Architectural Review Board (ARB) ARB- 2007 -95 2 Other: Please explain Submittal Code # Copies Distribute To: Submittal Code # Copies Distribute To: ARB 2 M. Mahszewski