Loading...
HomeMy WebLinkAboutSDP200800123 Review Comments Final Site Plan and Comps. 2008-08-26� OF AL ,. vIRGI1`IZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Plan preparer: Owner or rep.: Plan received date Date of comments: Reviewer: Crozet Station/Phase I — Final Ashley Cooper /Atwood Architects CROZET SHOPPING CENTER LLC 05 August 2008 26 August 2008 Max Greene, Sam Brownfield SDP200800123 [fax (434) 295 -24131 [fax unknown] The Final Site Plan for Crozet Station, Phase 1 — Final submitted 05 August 2008 has received Engineering review. The following design manual checklist items will be adequately addressed prior to final approval. Application information: 1. Submit a completed copy of the standard stormwater maintenance agreement and fee for recordation for any stormwater management facilities. [17 -304E] 2. Copies of manufacturer's approval of the plan for any manufactured stormwater management facilities. [Policy] Most structural SWMBMP distributors will verify adequacy of design per their specifications and send a letter of approval /disapproval that will become a part of County records. Existing conditions information: 3. Show date and source of the topographic information: All topography should be at least visually field verified by the designer within the last year [18- 32.6.6, 14 -302, Policy for date] 4. Show all existing easements (access, drainage, sight, sanitary easements, etc.) with deed book references, locations and dimensions [18- 32.6.6, 14 -302] Proposed plan view information: 5. Show proposed slopes steeper than 3:1 have low maintenance (not grass) ground cover specified on the plan [Policy] Entrances and right -of -way improvements: [per VDOT Subdivision Street Requirements] 6. Show all entrances with a VDOT designation (PE -1, CG -9a, etc) 7. VDOT approval for any plan affecting public right -of -way. Parking and circulation: [ 18 -4.12] 8. Show VDOT designations on all parking areas and travelways with curbing (CG -2, CG- 6) Plan detail information: Engineering Review Comments Page 2 of 2 9. Show dumpster pad detail or specification to be a minimum 4" stone base and 6" concrete of 3000psi at 28 days, or stronger, reinforced with a minimum grid of wire reinforcing or #4 bars at 12" on center. [specs are policy] 10. Show details for any pipes or drainage structures through or under walls, showing endwalls, casings, or structural measures to bridge pipes or structures. Drainage profiles: 11. Show concrete inlet shaping (IS -1) specified on all structures with a 4' or greater drop. 12. Please make sure all inlet spreads are less than 10' from structure. 13. Please show overland relief path incase of inlet failure. Water protection comments will be forthcoming due to submittal dates. File: E1_fsp_MRG_Crozet Station, Phase 1, Final.doc