Loading...
HomeMy WebLinkAboutARB200600134 Review Comments Final Site Plan and Comps. 2008-08-18ALg�,�� �'IRGINZ�` COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4012 August 18, 2008 Charles Hendricks The Gaines Group P.O. Box 6255 Charlottesville, VA 22906 RE: ARB- 2006 -134: Luxor Commercial, Buildings 4 and 5 (Tax Map 78, Parcel 55D) Dear Mr. Hendricks: I have reviewed your recent submittal for the above - referenced project received June 23, 2008. Outstanding issues that will need to be further addressed are shown in italics after the original comment from the Action Letter of February 14, 2007. 2. Provide a photometric plan showing the location of all proposed building and site lighting, in a clear (not blurred), legible format. Cutsheets of all proposed building and site lighting are to be included on the photometric drawings. Revise the lighting schedule to indicate the mounting height and proposed finish of all building and site lighting; bronze is preferred. All lighting sources in excess of 3,000 lumens are to be in full cut off fixtures and noted in the lighting schedule. The applicant's previous submission included cutsheets of building lighting for Buildings 4 & 5 and site lighting for the plaza area. The lighting plan, included with this submission, does not reference that lighting. The locations are not shown, cutsheets are not provided on the drawing, and the Luminaire Schedule is not revised to reference this lighting. Revise the lighting plan to show the location of all building and site lighting. Revise the lighting plan to include cutsheets of all proposed lighting and a revised Luminaire Schedule referencing all lighting fixtures chosen. All required information must appear on the drawings. Provide a larger scale photometric plan, if necessary, to make the additional information clear and legible. 4. Revise the planting design to provide additional shrubs in a layout that provides more of a sense of definition and enclosure to the entire space between the buildings and the EC, not just the seating areas. Indicate if a water fountain feature is proposed. If it is, provide details including the proposed location. Provide a landscape plan of the entire development with a planting key and schedule, and plant ID annotation that is legible. Provide on the landscape plan coding for all site element materials, colors and manufacturer's ID. Provide additional shrubs, 3' to 5' maximum mature height, on the south front edge of this site, under the trees within the new tree line, to flank the open, center plaza seating. The landscape proposal on Sheet C8 "Landscape Plan" is not legible due to the small scale of the drawing. Additional shrubs, 3' to 5' maximum mature height, on the south front edge of the site, under trees within the new tree line, flanking the center plaza seating, providing a sense of definition and enclosure, were not added between Building 5 and the EC. The proposed planting design on Sheet Ll Partial Landscape Plan" does not correspond with the planting design shown on Sheet C8 "Landscape Plan". Revise the planting design by adding additional shrubs between Building 5 and the EC, 3' to 5' maximum mature height, under trees within the new tree line, providing a sense of definition and enclosure between Building 5 and the EC. Revise the planting design on Sheet LI "Partial Landscape Plan" to correspond with the planting design on Sheet C8 "Landscape Plan ". 8. Revise the sign drawings to designate the proposed method of sign lighting. Provide a detail that clarifies the opaque quality of the letters and how the back -lit appearance will be achieved. The sign drawings have not been revised to designate the proposed method of sign lighting. All required information must appear on the drawings. Revise the sign drawing by adding a note stating the top, bottom, and sides of the reverse channel letters shall be opaque. Please provide: 1. Two copies of revised drawings addressing the aforementioned comment. 2. A memo indicating specifically how the condition has been satisfied. If changes other than those requested have been made, specifically identify those changes in the memo, also. "Clouding" requested changes (information) will facilitate the review of your submittal. All requested information is to be shown on the sheets in the site plan package - not 3. The attached "Revised Application Submittal" form. This form must be returned with your revisions to ensure proper tracking and distribution. When staff s review of this information indicates that all conditions of approval have been met, a Certificate of Appropriateness may be issued. If you have any questions, please do not hesitate to contact me. Sincerely, Brent W. Nelson Landscape Planner cc: ARB File COUNTY OF ALBEMARLE Department of Community Development REVISED APPLICATION SUBMITTAL This form must be returned with your revisions to ensure proper tracking and distribution. County staff has indicated below what they think will be required as a resubmission of revisions. If you need to submit additional information please explain on this form for the benefit of the intake staff. All plans must be collated and folded to fit into legal size files, in order to be accepted for submittal. TO: Brent W. Nelson DATE: PROJECT NAME: ARB2006 -134: Luxor Commercial Buildings 4 and 5 Submittal Type Requiring Revisions () indicates submival Cade County Project Number # Copies Erosion & Sediment Control Plan (E &S) # Copies Distribute To: Mitigation Plan (MP) 2 Brent Nelson Waiver Request (WR) Stormwater Management Plan (SWMP) Road Plan (RP) Private Road Request, with private /public comparison (PRR) Private Road Request — Development Area (PRR -DA) Preliminary Site Plan (PSP) Final Site Plan (or amendment) (FSP) Final Plat (FP) Preliminary Plat (PP) Easement Plat (EP) Boundary Adjustment Plat (BAP) Rezoning Plan (REZ) Special Use Permit Concept Plan (SP -CP) Reduced Concept Plan (R -CP) Proffers (P) Bond Estimate Request (BER) Draft Groundwater Management Plan (D -GWMP) Final Groundwater Management Plan (F -GWMP) Aquifer Testing Work Plan (ATWP) Groundwater Assessment Report (GWAR) Architectural Review Board (ARB) ARB2006 -134 Other: Please explain (For staff use onl ) Submittal Code # Copies Distribute To: Submittal Code # Copies Distribute To: ARB 2 Brent Nelson