HomeMy WebLinkAboutSUB200800092 Review Comments Final Plat 2008-08-29*-&A
County of Albemarle
Department of Community Development
Memorandum
To: Summer Frederick, Current Development planning review
From: Phil Custer, Current Development engineering review
Date: 29 August 2008
Subject: AOC Subdivision - Final (SUB200800092)
Before Engineering can recommend approval to the plat, the comments listed in this memo must be
addressed. Engineering reviewed this plat during in the spring of this year and provided the following
comments:
1. Drainage easements must be 20 feet in width, minimum. This appears to be a concern because
drainage pipes are located in portions of the parcel where the width of the parcel is less than 20
feet.
2. Each lot shall front on a private or public street. Is "Business Park Access" an approved public or
private street? [14 -403]
A new engineering review was requested with the plans reinstatement. A second review of the plat,
received 12 March 2008, was performed. New engineering comments include:
3. Deeds of easement will be required on all drainage easements before the plat can be recorded.
4. Please expand the access easement area at the entrance to both curbs.
5. The property does not appear to lie within any FEMA flood zone as suggested by note 5.