HomeMy WebLinkAboutWPO200800087 Review Comments Stormwater Management Plan 2008-09-25� OF AL
,. vIRGINIP
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902.4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project:
Plan preparer:
Owner or rep.:
Plan received date
Date of comments:
Reviewer:
Dennis Enterprise
Bent Tree Design
Dennis Minetos
25 August 2008
25 September 2008
Max Greene
WP0200800087
[fax (434) 220 -25531
[fax number not submitted]
The stormwater protection plan submitted 25 August 2008 has received engineering review. The
plan cannot be approved as submitted. The following items will be addressed prior to resubmittal:
1. The base map appears to be a copy of the SDP200500096 and will be updated to depict
the current topography and hardscape as constructed.
2. Amendments to the site plan SDP200500096 and Erosion and sediment control plan
WP0200600026 will be required.
3. Amendments require the following minimum items for review:
a. The approved plan must be included in the plan set, with the specific areas of amendment
clearly outlined by bubbling or circling. The approved plan must not otherwise be altered.
b. A detail on a subsequent new sheet must provide the amended features as referenced in
the bubbled or circled area of the approved plan.
c. If the site is built or under construction, details on new sheets must contain
accurate as -built information.
4. Please provide a vicinity map. [18- 32.6.6]
5. Accurate current existing topography at the time of submittal, including all existing site features,
and any recent disturbances, all at a legible scale [18- 32.6.6, 14 -302]
6. Date and source of the topographic information: All topography should be at least visually field
verified by the designer within the last year [18- 32.6.6, 14 -302, Policy for date]
7. Benchmark location, elevation and datum for topography. An existing utility or other
known position will suffice. [Policy]
8. FEMA map and date references labeled for FEMA floodplain [Policy]
9. all slopes 25% and over (critical slopes by County Zoning Ord.) are shaded [18- 32.6.6,
14 -302]
10. stormwater management easements over all facilities and associated structures and access
11. Please proved pavement designs
Due to the requested information listed above, additional comments or conditions may be
forthcoming.
Please contact this office to arrange a meeting.
File: El_swm_MRG_Dennis Enterprise.doc