Loading...
HomeMy WebLinkAboutSUB200700338 Review Comments Bond Estimate 2008-08-29Development Name Old Trail Ballard Field Phase 4 ROAD Construction Bond Estimate (roads, site work, storm sewer) Item Item $62,288.37 No. Unit Unit Cost Cost Number SUB200700338 installed Road Nam Killdeer Lane 10 +00 to 13 +38 road length 338.0 ft aggregate base 6.0 in d 338.0 ft L 30.0 ft W 187.8 cy $35.91 $6,743.10 blotted or prime &double seal 338.0 ft L ft W 0.0 sy $6.30 $0.00 asphalt base 3.0 in d 338.0 ft L 30.0 ft W 142.0 tons $73.50 $10,434.06 asphalt surface 2.0 in d 338.0 ft L 30.0 ft W 94.6 tons $81.90 $7,751.02 curb CG -2 ft $8.40 $0.00 curb CG -6 676.0 ft $13.83 $9,348.07 sidewalk, asphalt in d 338.0 ft L 5.0 ft W 0.0 tons $73.50 $0.00 sidewalk, concrete S width 1000.0 ft $11.66 $11,655.00 ramp CG -12 2 $315.00 $630.00 street name sign 1 $65.00 $65.00 traffic control sign 2 $49.35 $98.70 Street trees 23 $200.00 $4,600.00 manhole or drop inlet 0 $1,365.00 $0.00 pipe, rcp (15 to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $23.10 $0.00 pipe, rcp (54 to 72 ") 54.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $157.50 $0.00 pipe, pvc (4 to 10 ") 8.0 in d 0.0 ft $6.30 $0.00 pipe, cmp (15 to 48 ") 15.0 in d ES -1,2 $250 EC -1 $200 0.0 ft $23.10 $0.00 pipe, cmp (54 to 72 ") 60.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $146.00 $0.00 rip -rap, placed 0.0 ton $31.50 $0.00 E &S fabric,EC -2,3 1750 ft L 4 ft W 0.0 sy $10.50 $0.00 clear and grub (for wooded sites) 338.0 ft L 30.0 ft W 0.0 acre $10,500.00 $0.00 grading (per cy for cut or import only) 600.0 cy fill 500.0 cy cut 600.0 cy $3.15 $3,465.00 CBR tests (1 every 0.1 mi. per road) 338.0 ft L 0.676 inc of 500' 2 $157.50 $267.75 as -built drawings (1k+ price per 0.1 r 338.0 ft L 0.064 mi. 1 $1,050.00 $2,050.00 survey and layout (price per 0.1 mi.) 338.0 ft L 0.064 mi. 1 $525.00 $1,525.00 mobilization 1 $525.00 $525.00 VDOT surety (1 lane) 338.0 ft L 0.064 mi. 2 Lanes $2,000.00 $2,560.61 VDOT maintenance fee (1 In rd, 1 yr) 338.0 ft L 0.064 mi. 2 Lanes $150.00 $192.05 VDOT admin. Cost recovery fee(1 Ian 338.0 ft L 0.064 mi. 2 Lanes $100.00 $378.03 cost sum $62,288.37 contigency 25% $15,572.09 Total $77,900 8/29/2008