Loading...
HomeMy WebLinkAboutARB200800119 Certificate of Appropriateness 2008-09-02ALg�,�� �'IRGINZ�` COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 218 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 September 2, 2008 Mike Schebece NW Sign Industries 2416 Sand Lake Road Orlando, FL 32809 RE: ARB- 2008 -119: Stellar One (Mill Creek) - Signs B200800654S Dear Mr. Schebece: I have reviewed your request for the above -noted signs. As the wall sign is not illuminated and the only change to the monument sign is color and text, and because these signs otherwise meet the EC Sign Guidelines, I am able to review this proposal administratively for the ARB. I have approved signs of the designs outlined below. You may consider this letter your Certificate of Appropriateness. FREESTANDING SIGN Quantity: 1 Type: Panel refacing on existing brick monument Materials: Aluminum panel and vinyl Location: South side of Mill Creek Drive, east of Avon Street and the Exxon Station Panel Size: 42" high x 108" long Panel Colors: Background: — Akzo Nobel #4408 blue; Letters: "Stellar " - white; "One "- 3630 -141 Gold Nugget with 1/4" inset; Border: 3630 -141 Gold Nugget Graphics: N/A Illumination: External: Hydrel 4798 Accent Light flood lights, ground mounted, one on both sides of the sign (total 2). Text: "Stellar One" Mounting: Aluminum sign mounted to brick monument with welded aluminum studs Landscaping: Existing to remain WALL SIGN: Stellar One Quantity: 1 Type: Panel Materials: Aluminum and vinyl Location: Centered horizontally on the west elevation of the building to the left of the entrance doors Overall Sign Size: 15" tall x 30" wide Text: "Stellar One" Colors: Background: Akzo Nobel #4408 blue; Letters: "Stellar " - white; "One " - 3630 -141 Gold Nugget with 1 /a" inset; Border: 3630 -141 Gold Nugget Mounting: Aluminum sign mounted to masonry wall with welded aluminum studs Illumination: Non - illuminated This approval is predicated on the fact that the design and materials, as proposed and listed above, will be used. The acceptance of approval implies that the applicant has agreed to execute the design as indicated on the submittal items presented, and as listed above. Any changes in the approved sign or materials will require an amendment to the application and must be reviewed and approved by the Architectural Review Board. PLEASE NOTE THE FOLLOWING: 1. The window sign in the entrance door, the ATM replacement face, the transaction sign, and the three directional signs are not subject to ARB review. If you have any questions concerning any of the above, please feel free to call me. Sincerely, Eryn Brennan Senior Planner cc: ARB File Building Permit