HomeMy WebLinkAboutARB200800119 Certificate of Appropriateness 2008-09-02ALg�,��
�'IRGINZ�`
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 218
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
September 2, 2008
Mike Schebece
NW Sign Industries
2416 Sand Lake Road
Orlando, FL 32809
RE: ARB- 2008 -119: Stellar One (Mill Creek) - Signs
B200800654S
Dear Mr. Schebece:
I have reviewed your request for the above -noted signs. As the wall sign is not illuminated and the only change to the
monument sign is color and text, and because these signs otherwise meet the EC Sign Guidelines, I am able to review this
proposal administratively for the ARB. I have approved signs of the designs outlined below. You may consider this letter
your Certificate of Appropriateness.
FREESTANDING SIGN
Quantity: 1
Type: Panel refacing on existing brick monument
Materials: Aluminum panel and vinyl
Location: South side of Mill Creek Drive, east of Avon Street and the Exxon Station
Panel Size: 42" high x 108" long
Panel Colors: Background: — Akzo Nobel #4408 blue; Letters: "Stellar " - white; "One "- 3630 -141 Gold Nugget with 1/4"
inset; Border: 3630 -141 Gold Nugget
Graphics: N/A
Illumination: External: Hydrel 4798 Accent Light flood lights, ground mounted, one on both sides of the sign (total 2).
Text: "Stellar One"
Mounting: Aluminum sign mounted to brick monument with welded aluminum studs
Landscaping: Existing to remain
WALL SIGN: Stellar One
Quantity: 1
Type: Panel
Materials: Aluminum and vinyl
Location: Centered horizontally on the west elevation of the building to the left of the entrance doors
Overall Sign Size: 15" tall x 30" wide
Text: "Stellar One"
Colors: Background: Akzo Nobel #4408 blue; Letters: "Stellar " - white; "One " - 3630 -141 Gold Nugget with 1 /a" inset;
Border: 3630 -141 Gold Nugget
Mounting: Aluminum sign mounted to masonry wall with welded aluminum studs
Illumination: Non - illuminated
This approval is predicated on the fact that the design and materials, as proposed and listed above, will be used. The
acceptance of approval implies that the applicant has agreed to execute the design as indicated on the submittal items
presented, and as listed above. Any changes in the approved sign or materials will require an amendment to the application
and must be reviewed and approved by the Architectural Review Board.
PLEASE NOTE THE FOLLOWING:
1. The window sign in the entrance door, the ATM replacement face, the transaction sign, and the three directional
signs are not subject to ARB review.
If you have any questions concerning any of the above, please feel free to call me.
Sincerely,
Eryn Brennan
Senior Planner
cc: ARB File
Building Permit