Loading...
HomeMy WebLinkAboutZMA200800004 Review Comments Zoning Map Amendment 2008-10-03�'JRGINLP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4012 October 3, 2008 Mr. Scott Collins Collins Engineering 800 E. Jefferson St. Charlottesville, VA 22902 RE: ZMA-08-004 NGIC Expansion (Revised) - Zoning Map Amendment SP2008-045 NGIC Expansion — Special Use Permit SP2008-046 NGIC Expansion — Special Use Permit Dear Mr. Collins: Thank you for your recent submittal received on August 20th for the above noted project for Tax Map and Parcels 33-1D (portion). The following comments are provided to help you meet requirements for CO (Commercial Office) District and address staff concerns: Proffers: • As you may be aware, your request for a parking modification has been approved with conditions that tie the storage use directly to the office uses on the upper four floors of each office building. The proffers include compliance with the application plan that includes the parking and use breakdown of the proposed buildings, which is consistent with the modification approval. The Proffer Statement needs to be revised to reflect the latest revision date for the plan dated 8-18-08 as referenced in proffer #4. • The applicant has also indicated a willingness to proffer that the basement of building one and the two basements of building two will be used for general, file and/or data storage. • Revised proffers need to be submitted. Albemarle County Service Authority (ACSA): 9 At this time, ACSA cannot accept the projected wastewater flows until all improvements to the Camelot Wastewater Treatment Plant are complete. Other Issues: • Since changes to the site are proposed due to the slight relocation of the residential building, a revised site plan will be required. • The plan submitted with this application uses a pond to be constructed on the adjacent federal property for stormwater management. The army claims to be exempt from all County review. Therefore, it is not known whether this site meets the County Water Protection Ordinance requirements. While it is recommended that this be demonstrated prior to any additional approvals on this property, in any case, this will be required prior to approval of site plans or site plan amendments. After you have reviewed these comments, if you wish to meet with staff on the comments, please let me know and I will set up a meeting. When you are ready to resubmit, please provide that re -submittal on a re -submittal Monday (see attached schedule). Make sure to put my name on the cover page of your re -submittal. After you have resubmitted, staff will provide a set of written comments for your review prior to setting a public hearing. In those comments, we will advise you as to whether all substantive issues have been resolved or if additional resolution is needed. A public hearing with the Planning Commission will not be advertised until you advise us that the project is ready to proceed to a public hearing. At that time, the legal advertisement will be run in the newspaper and a staff report will be prepared to go to the Planning Commission. Please be advised that, once a public hearing has been advertised, only one deferral prior to the Planning Commission's public hearing will be allowed during the life of the application. The only exception to this rule will be extraordinary circumstances, such as a major change in the project proposal by the applicant or more issues identified by staff that has not previously been brought to the applicant's attention. As always, an applicant may request deferral at the Planning Commission meeting. Additional questions or comments may occur at a future date. If you have questions or need additional information, please feel free to call me at 296-5832 x 3250 or send me an e-mail at cgrant@albemarle.oriz . Sincerely, Claudette Grant Senior Planner C: Next Generation, LLC OF AL o ®� GINZP COUNTY OF ALBEMARLE ________________Department of Community Developm 401 McIntire Road Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 September 30, 2008 Mr. Scott Collins Collins Engineering 800 East Jefferson Street Charlottesville, VA 22902 Re: NGIC — Request for Parking Modification (TM 33, portion of Parcel 1D) Dear Mr. Collins, This letter serves to provide a written record of the parking modification approval for the above -noted property in accordance with Section 4.12.2 c.1 of the Albemarle County Code (Zoning Ordinance). This is in response to your request for modification, dated August 18, 2008 and revised September 24, 2008. The previously approved rezoning and special use permits for this site called for two office buildings of 89,400 gross square feet of floor area each. This is a total of 178,800 gross sf. Based on the ordinance standard for 80% net and 1 space per 200 square feet of office use, 716 parking spaces were required (calculated per floor for both buildings). Additionally, a third building will house 120 residential units, requiring 240 parking spaces. A total of 783 parking spaces were proposed with the original plan, with 173 spaces shared by the offices and residential units. The office buildings are now being proposed with one having a basement storage level of 22,100 gross sf. and the other having two basement floor levels totaling 44,200 gross sf. (a total of 66,300 gross sf.). These building additions, if approved by the Board of Supervisors with the ZMA-2008-004, SP -2008-045 & SP -2008-046 will be permitted without the requirement of additional parking spaces, based on our understanding of the limitations outlined in your request, with several conditions of use for the buildings. These conditions of use are the basis for and part of this parking determination. Any zoning clearances for current or future users will be limited by these conditions, until and unless a future parking determination is made to amend this one. They are as follows: 1. The net office area for the building (for the purpose of determining parking requirements) is a maximum of 178,800 gross sf. 2. The gross square footage in the three basement floors shall be limited to storage use only for the occupants of the office floors and may not be occupied as active offices. Any conversion of this space to active office area (with offices, meeting__ rooms or the like) or any other use will be a violation of this approval. Each designated storage area in this basement shall be limited in terms of electrical and telephone service. It is recommended (not required) that the ceiling height __in each storage area -be reduced. to a maximum head room of 6. feet 6 inches....___ This is a common zoning practice for cases in which parking is reduced based on substantial area devoted to storage. 3. Any future tenants will be subject to compliance with our parking regulations. The current parking analysis assumes a general office use and the three basement floors used exclusively as storage for the office users. Future tenants may be limited by available parking. (Please check with us prior to finalizing leases with future tenants.) If you have any questions, please do not hesitate to ask. If there -are corrections or revisions to these assumptions or conditions, please inform me. If you are aggrieved by this determination, you have a right to appeal it within thirty (30) days of the date notice of this determination is given, in accordance with Section 15.2- 2311(A) of the Code of Virginia. If you do not file a timely appeal, this determination shall be final and unappealable. An appeal shall be taken only by filing with the Zoning Administrator and the Board of Zoning Appeals a notice of appeal which specifies the grounds for the appeal. An appeal application must be completed and filed along with the fee of $120. The date notice of this determination is being given is the same as the date of this Fnald rely, L. Higgins, .I.P.,G-r—� Chief of Zoning/Deputy Zoning Administrator Cc: Next Generation, LLC United Land Corporation reading file Attach to city view file